Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.6 L+₹57,275 (9.58%)Rejected-Finance | L2 | Rejected-Finance Quoted other than lowest rate. | |
| 3 | L3₹6.6 L+₹60,550.08 (10.1%)Rejected-Finance | L3 | Rejected-Finance Quoted other than lowest rate. | |
| 4 | L4₹7.4 L+₹1.5 L (24.4%)Rejected-Finance MCB Z 5 04939 GURU GOBIND NAGAR BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | L4 | Rejected-Finance Quoted other than lowest rate. |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
21 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SH SACHIN H CHAVAN IDSE
GE NORTH BATHINDA MIL STN-151004
8636/NIT 54/21-22 PERIODICAL SERVICES MANOJ PANDEY UNDER AGE BR V OF GE (N) BATHINDA AT BATHINDA MIL STN
2021_MES_477741_1
8936/NIT-54/21-22
Open Tender
Civil Works
Item Rate
240 days
GE NORTH BATHINDA MIL STN
E class category a (i)
8 documents required · 8 mandatory
₹500
GE NORTH BATHINDA
₹40,000
Yes
10 Dec 2021
25 Sept 2021
23 Oct 2021
25 Sept 2021
21 Oct 2021
9 Oct 2021
25 Sept 2021 - 1 Oct 2021
60 days
Amount
SCHEDULE 'A' B/R Works
Material and labour for Preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto entire satisfaction of Engineer-in-charge and after preparing the surface smooth applying one coat of lime white wash with using paint brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces (plastered/unplastered) of ceiling by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto upto entire satisfaction of Engineer-in-charge and after preparing the surface smooth applying one coat of lime white wash with paint brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces (plastered/unplastered) by brooming down or steel wire brushing, scraping down smoke soot, moulds & efflorescent salt and trading oil and greasy spots etc. and applying one coat of colour wash on old decorated surfaces of walls include cornices complete all as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean, washing down with water including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying one coat of cement base paint with paint brush or roller brush, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using steel patti and mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down with water including applying white cement based putty where required for filling to depressions to make the surface even and smooth by using sander machine (with provision of dust sucking) upto entire satisfaction of Engineer-in-charge, and after that applying two coats of cement base paint as per approved tint/colour with using paint brush/roller brush, complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying CBP as specified above, the surface shall be passed in writing by the Enigineer-in-charge in site order book.
Material and labour for preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean, including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying one coat of oil bound distemper (washable) by using electric paint roller or roller brush, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down and preparing the surfaces smooth and after that applying average 3mm thick layer (1.5mm thick each in two layer application) of white cement based putty (wall care putty, make Birla JK or equvilent as approved by Engineer-in-charge), after applying putty first and second coat sanding the surface as per requirement by using mechanical sander machine to make the surface even and smooth upto entire satisfaction of Engineer-in-charge and after prepare the surface smooth applying two coats of oil bound distemper (washable) as per approved tint/colour by using paint brush or roller brush complete all as specified and as directed by Engineer-in-Charge. NOTE : - Each stage i.e after complete removal and before applying OBD as specified above, the surface shall be passed in writing by the Enigineer-in-charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down and preparing the surfaces smooth and after that applying two coats of weather proof exterior emulsion paint (wheather coat Apex, 100% exterier grade) by using paint roller brush or electric paint spray machine, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying weather coats as specified above, the surface shall be passed in writing by the Enigineer-in-charge.
Material and labour for preparation of old painted wooden surfaces of any description not otherwise described over 10cm width or girth by cleaning the dust and removing all loose particle with using clean cloths and dry paint brush & applying one coat of synthetic enamel paint (1st quality) of approved tint/colour to achieve glossing finish with using paint brush complete as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth by cleaning the dust and removing all loose particle with using sanded paper, clean cloths and dry paint brush & applying one coat of synthetic enamel paint (1st quality) of approved tint/colour to achieve glossing finish with using paint brush complete as specified and as directed by Engineer-in-Charge.
Material and labour two coats of french polishing on wooden surfaces of any description, width or girth including cleaning and preparing the surface including a coat of wood filler, complete as specified and as directed by Engineer-in-Charge.
Material and labour for rendering/plastering appx 15mm thick (matching with existing plaster thickness) in cement mortar (1:6) on old brick or concrete surfaces of walls/pillars /cornices in patches matching with existing, finished even and smooth without using extra cement including old rusted plaster taking down, raking out joints, hacking for key and scrubbing down with water complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for rendering/plastering appx 15mm thick (matching with existing plaster thickness) in cement mortar (1:4) on old brick or concrete surfaces of walls/pillars /cornices in patches matching with existing, finished even and smooth without using extra cement including old rusted plaster taking down, raking out joints, hacking for key and scrubbing down with water complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for rendering/plastering appx 5mm thick (matching with existing plaster thickness) in cement mortar (1:3) on any face of ceiling in patches matching with existing, finished fair and even and smooth without using extra cement including old rusted plaster taking down, raking out joints, hacking for key and scrubbing down with water complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for preparation of new plastered surfaces of walls/pillars /cornices by brooming down with using broom/sand papering or by any other means, preparing the surfaces smooth by applying one coat of chalk whitening as priming coat and after that applying two coats of oil bound distemper (washable) as per approved tint/colour with using electric paint roller or roller brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of new plastered surfaces of walls/pillars /cornices by brooming down with using broom/sand papering or by any other mean, washing down with water and applying two coats of white wash as per approved tint/colour with using paint brush/roller brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of new plastered surfaces of ceiling by sand papering or by any other means, preparing the surfaces smooth and after that applying three coats of lime white wash with using paint brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for writing letters or figures (Block, roman, italic or indian) not exc. 30 cm high complete as specified and as directed by Engineer-in-Charge.
Hacking out old broken glass (any thickness, size, quality or description) from metal frame including punching or drilling out old glazing pins/spring clips and Supply & fixing new 3mm thick sheet glass ordinary quality in squares not exceeding 0.5sqm in each pane and fixed in any type of doors/windows/ventilators with wooden bead/pin tacked/with oil putty etc. as required or as directed including cutting of glass as per site requirement complete all as specified & directed by Engineer-in- charge.
Taking down/completly removed existing cement plaster from efflorescence effected areas of brick walls/pillars /cornices by using machanical means including raking out joints and scrubbing down, the effected bricks to be completely exposed, apparently visible efflorescence cleaned with using hard wire brush and all crystal deposits to be removed, the bricks shall then be cleaned using soft brush powdery crystal removed and prepared the surface for further treatment upto entire satisfaction of Engineer-in-charge complete all as specified and as directed by Engineer-in-Charge.
Material and labour for treatment on efflorescence effected areas of brick walls/pillars /cornices (surface prepared for treatment under appropriate item here-in-befoer) with vinegar/water solution (1:4) i.e. 1 part vinegar and 4 parts water, applying the vinegar/water solution to sit on the effected area with using nylon brush for 15 minutes but do not allow the solution to dry, rinse the area with clean water using low pressure jet spray system, this whole process will be repeated two times complete all as specified and as directed by Engineer-in-Charge.
Material and labour for joint filling after vinegar treatment, joints of bricks so cleaned shall be pointed using cement putty made at site using latex/SBR polymer diluted at ratio (1:4) with water. The solution so made shall be used to be mixed with cement to make a putty consistency paste. The cement putty shall be then worked out in the joints which are clean and in SSD (Saturated surface dry) condition complete all as specified and as directed by Engineer-in-Charge. Make :- Sika/BASE/STP/Dr Fixit
Material and labour for water proofing treatment after joint filling, the bricks so pointed shall be cleaned to all dust or deposit using brush. A undiluted single component acrylic polymer to be used to prime the brick surface. The primer while being tacky the first coat of water proofing coating is done, second coat is applied after a time interval of 4 to 6 hours after the first coat has dried, the water proofing coating shall be two component polymer modified cementatious coating having a thickness of 1.5mm in two coats. The material to be factory batched and ready to use. The two components shall be mixed for at least 3 to 4 minutes with a mixing spindle attached to a slow speed electric drill (having 350-450 RPM) until the material becomes smooth and to give a brushable consistency mix. Avoid aeration while mixing. The coating shall be done using 100 to 150mm wide brush. It is to be taken care that the material while being used should be stirred every 3 to 5 min to avoid powder part getting settled, mix only that quantity which can be used within its pot life, The water proofing coating shall have below properties :- (i) Tensile strength = 4.56 N/mm² after 14 days exposure (According to ASTM D 2370) (ii) Bond strength = 2 N/mm² at 27°C (failure in substrate). After application of second coat and while the material is still wet, coarse sand is sprinkled over the coating so as to ensure proper emachanical key is provided for subsequent plaster complete all as specified and as directed by Engineer-in-Charge. Make :- Sika/BASE/STP/Dr Fixit
Material and labour for plastering at thickness 15mm over the treated surface shall be done with 1:4 cement sand plaster added with acrylic polymer @ 3% by weight of cement, complete all as specified and as directed by Engineer-in-Charge. Make :- Sika/BASE/STP/Dr Fixit
BALAJI CONSTRUCTIONS
ABHINANDAN ENTERPRISES
M/s GURFATEH BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .