Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -21.90% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.8 L+₹25,627.19 (16.5%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹1.8 L+₹25,627.19 (16.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Non responisve due to TD fee not uploaded |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of CC Drain near House of Mohd Azad Mir and others at Neeru Tulail Bandipora Pyt Neeru Block Tulail
2026_PWDJK_320218_7
(REW) E-NIT No 09 of 2026-27 EE-RnB-Grz-4718-27 E-tendering Dated-08-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer RnB Division Gurez
₹3,980
Executive Engineer RnB Division Gurez
21 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 19.79 | Cum | 479.3 | ₹9,485.35 |
| 2 | Supplying and laying of stone soling hand packed tightly including ramming, watering incl. carriages complete. | 9.9 | Cum | 1,200 | ₹11,880 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) | 18.5 | Cum | 5,733.6 | ₹1,06,071.6 |
| 4 | Centering and shuttering including strutting propping etc. and removal of form work. | 55.1 | Sqm | 286.35 | ₹15,777.89 |
| 5 | 12mm thick cement sand plaster in 1:4 mix | 98.6 | Sqm | 283.8 | ₹27,982.68 |
| 6 | Cement concrete flooring 1:2:4 (1Cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry but excluding cost of nosing of steps etc complete.40 mm thick 20mm nominal size stone aggregate (crushed) | 21.75 | Sqm | 510.25 | ₹11,097.94 |
| 7 | Carriage of different material from nearest source to site of work. Sand from Avg lead of 15 Km & H/L of 50 mtrs | 26.35 | Cum | 545.16 | ₹14,364.97 |
| 8 | Add cost of sign board photographs incld weel hole with PVC pipes | 1 | Job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1063711.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .