| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | -33.98% | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 L+₹71,246.06 (12.8%)Admitted-Fee/PreQual/Technical/Finance | -25.50% | ₹6.3 L+₹71,246.06 (12.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.3 L+₹75,446.89 (13.6%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹6.3 L+₹75,446.89 (13.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.0 L+₹2.4 L (43.7%)Admitted-Fee/PreQual/Technical/Finance | -5.12% | ₹8.0 L+₹2.4 L (43.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.0 L+₹2.4 L (43.8%)Admitted-Fee/PreQual/Technical/Finance | -5.09% | ₹8.0 L+₹2.4 L (43.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.4 L
EMD Value
₹16,803
Closing Date
14 Sept 2026, 9:00 amClosed
EE 14th Division IGNP Bajju
EE 14th Division IGNP Bajju
R and M of existing Filter Plant at CC RD 931 Bajju
2026_IGNP_595708_3
NIB 03
Open Tender
Civil Works
Percentage
90 days
RD 931 Bajju
As per Bid
2 documents required · 2 mandatory
₹500
EE 14th Division IGNP RD 931 Bajju
₹16,803
Yes
15 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing & Re-fixing of pipes for under drainage system including cleaning of one end plugged pipes and fixing /embedded in CM 1:4 on one end and fixing other end in collecting channel with CM 1:4 with all Material etc.(Excl.cost of pipes) This job, also, includes Making 4mm dia holes if required in pipes @15 cm c/c in zig-zag pattern.
Rate is exclusive of GST.(PHED BSR revised 2023,CH No. 12,Item no 12.10) | 132 | RM | 22.03 | ₹2,907.96 |
| 2 | Providing and Placing of new filter media as (i) Sand shall be hard and resistant quartz or quartzite and free of clay, fine particles, soft grains and dirt of any description. (ii) Effective size shall be 0.20 to 0.30 mm. (iii) Uniformity Coefficient not be more than 5.0 nor less than 3.0. (iv) Ignition loss should not exceed 0.70% by weight. (v) Soluble fraction in HCL acid shall not exceed 7.0% by weight, (vi) Silica content should not be less than 95% (vii) Specific Gravity shall be in the range between 2.55 to 2.65 (viii) Wearing loss shall not exceed 3.0%. and as per specifications given in IS: 8419 (Part-I). (ix) The sand should not contain more than 2% of calcium and manganese calculated as carbonate. Filter media (fine sand and coarse sand) should be processed through. Disintegrator and dust separator in automatic plant including screening of sand to desired. Specification and washing and cleaning of sand with water by aqua wash technology at quarry site. The sand shall not contain more than 5% acid soluble matter as determined by solubility test in Appendix B of IS: 8419 (Part-I) (Fine sand 0.2 to 0.3mm and coarse sand 1.0 to 1.7mm) (For SSF)
Rate is exclusive of GST.(PHED BSR revised 2023,Ch no.12,Item no.-12.8) | 190.76 | cum | 3,550.85 | ₹6,77,360.15 |
| 3 | Labour charges for screening of old sand (received from filter beds) through the standard sieves, washing the sand with HCL acid of required concentration as directed by the Engineer- In- Charge, so as to remove all the mud and other deposits from sand grains and then clean with water till the sand is as neat and clean that it impart no colour to clean while washing. It also includes placing this washed filter media (sand) in filter beds in layer as instructed by the Engineer- In- Charge. (RGF, SSF)
Rate is exclusive of GST.(PHED BSR revised 2023,CH No. 12,Item no 12.12) | 35.33 | Cum | 775.42 | ₹27,395.59 |
| 4 | Labour charges for screening of old gravel (received from filter beds) through the standard different sizes sieves for required sizes of gravel, washing the gravel with HCL acid of required concentration as directed by the Engineer- In- Charge, so as to remove all the mud and other deposits from gravel grains and then clean with water till the gravel is as neat and clean that it impart no colour to clean while washing. It also includes placing this washed gravel in filter beds in layer as instructed by the Engineer- In- Charge. (RGF, SSF)
Rate is exclusive of GST.(PHED BSR revised 2023,CH No. 12,Item no 12.13) | 52.99 | Cum | 580.51 | ₹30,761.22 |
| 5 | Dismantling old plaster or skirting with racking of joints and cleaning the surfce for plaster including disposal of rubbish with in 50 m lead.(IGNP Bsr 2026,Ch no,-15,item no -17) | 388.58 | Sqm | 30 | ₹11,657.4 |
| 6 | Cement plaster with cement sand mortar (1:3) including racking of joints, smooth finishing and curing etc.complete including all leads of all construction materails of thickness. 12 mm thick in 1 coat (IGNP Bsr 2026,Ch no,-11,item no -2.3 | 411.34 | sqm | 219 | ₹90,083.46 |
stage.html
html • 0.03 MB
finance_1056664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
condnewnonplan.pdf
Additional Documents • 0.13 MB
bidnonplan.pdf
Tender Documents • 11.28 MB
BOQ_1056664.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .