Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹3,505
Closing Date
8 Jul 2026, 10:00 am5d left
Resident Engineer
Bhaba Power House Division, HPSEBL Bhabanagar
Cleaning work of trash rack, debris, boulders, shingles, operating of different gates at weir site Surchoo and Forebay of 2x2.25 MW BAP Kafnoo power house under Bhaba Power House Division, for 120 Days w.e.f. 13.07.2026 up to 09.11.2026
2026_HPSEB_137893_1
HPSEBL/BPHD/2026-27-02
Open Tender
Repair and Maintenance Works
120 days
Weir Site Surchoo
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
₹3,505
2 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending Cleaning work of trash rack, removal of debris, and bushes etc. including maintaining/observation of water level at intake of BAP, operating the D-Tank gates, flushing gates/valves, Shingle flushing gates, conveying the level to BAP Power House Kafnoo complete in all respect and as per requirement and direction of EIC is to be carried out for a continuous period of 120 days, from13.07.2026 to 09.11.2026. The scope of work includes the deployment of 03 Nos. of Beldars for the entire duration for 120 days. The abour deployed should be well equipped with mobile phone, torch, umbrella, tools, safetyshoes ,safetybelt,life jacket etc. completion in all respect and as per requirement and direction of EIC under Bhaba Elect. Sub-Division No.-1, HPSEBL, Katgaon, Distt. Kinnour (H.P.) for 120 days. | - | Job | 2,22,750 | - |
| 2 | Attending Cleaning work of trash rack, removal of debris, and bushes etc. including maintaining/observation of water level at forebay of BAP Kafnoo power house, complete in all respect and as per requirement and direction of EICis to be carried out for a continuous period of 120 days, from 13.07.2026 to 09.11.2026. The scope of work includes the deployment of 01No. of Beldar for the entire durationfor 120 days. The labour deployed should be well equipped with mobile phone, torch, umbrella, tools, safety shoes, safety belt, life jacket etc. completion in all respect and as per requirement and direction of EIC under Bhaba Elect. Sub-Division No.-1, HPSEBL, Katgaon, Distt. Kinnour (H.P.) for 120 days. | - | Job | 74,250 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_204153.xls
BOQ • 0.27 MB
SBD.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid