Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | -40.39% | ₹9.9 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 L+₹89,663.22 (9.06%)Admitted-Finance ZIRAKPUR PUNJAB | S A S NAGAR | PUNJAB | 140103 | -34.99% | ₹10.8 L+₹89,663.22 (9.06%) | L2 | Admitted-Finance |
| 3 | L3₹11.3 L+₹1.4 L (14.3%)Admitted-Finance | -31.88% | ₹11.3 L+₹1.4 L (14.3%) | L3 | Admitted-Finance |
| 4 | L4₹12.8 L+₹2.9 L (29.2%)Admitted-Finance | -22.99% | ₹12.8 L+₹2.9 L (29.2%) | L4 | Admitted-Finance |
Tender Value
₹16.6 L
EMD Value
₹33,209
Closing Date
24 Jun 2026, 3:00 pmClosed
EE,HCD-5,DDA
EE,HCD-5,DDA
Repair and Restoration of water body at Distt. Park Harsh Vihar
2026_DDA_913391_1
06/EE/HCD-5/DDA/2026-27
Open Tender
Civil Works
Works
60 days
LAWRENCE ROAD
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹33,209
1 Jul 2026
17 Jun 2026
25 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :
(a) In cement mortar | - | cum | 2,458.95 | - |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
(a) Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 7,132.25 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 7,878.5 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :
(a) Foundations, footings, bases for columns | - | sqm | 392.15 | - |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :
(a) Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 7,311.25 | - |
| 6 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :
(a) Raised and cut pointing | - | sqm | 701.05 | - |
| 7 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. | - | sqm | 883.15 | - |
| 8 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. (Stones shall be supplied by the Deptt. free of cost) | - | sqm | 659.05 | - |
| 9 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.
(a) G.I. pipes | - | kg | 203.05 | - |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
(a) Hot finished welded type tubes | - | kg | 194.4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_959898.xls
BOQ • 0.30 MB
NIT06.pdf
Tender Documents • 2.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .