Loading…
Loading…
Tender Value
₹3.3 L
EMD Value
₹34,000
Closing Date
15 Jun 2026, 3:00 pm
DDC
Office of DDC Mandi Parishad Tindwari Road Banda
Construction of Weight Bridge Room Under Mandi Samiti Baberu
2026_RKUMP_1155506_3
Nirman Khand Banda/Tender/2026-200 dt.29Mayl.2026
Open Tender
Civil Works
90 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
DDC Mandi Parishad Banda
₹34,000
30 May 2026
30 May 2026
15 Jun 2026
30 May 2026
15 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinery soil (loan clay or sand) including lift upto 1.50 mt.and lead upto 50 mt. & including filling watering and ramming of excavated earth. into the trenches or into the space between the building and the sides of foundations trenches or into the plinth into removal / disposal of surplus earth as directed by the E/I. upto a distance of 50 mt. from the foundation trenches. S.I.No.-257 | - | Cum. | 120 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2.27 | 4.79 | Cum. | 1,546.37 | ₹7,407.11 |
| 3 | Cement concrete with 4 cm gauge stone ballast, coarse sand of cement in proportion of 1:4:8 in foundation & under floors, including supply of all materials, labour & T&P etc. required for proper completion of the |work (S.I.No. 281). | - | Cum. | 4,300 | - |
| 4 | Reinforced cement concrete with cement, approved coarse sand and 2 cm (3/4") gauge graded approved stone grit in the proportion of 1:2:4 in raft foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and tools and plants etc. required for proper completion of the work (S.I.No. 287) | - | Cum. | 5,600 | - |
| 5 | M-150 class brick work in 1:6 cement & coarse sand in foundation and plinth including supply of all material labour, tools and plants required for proper completion ofthe work. (S.I.No.-303) | - | Cum. | 5,100 | - |
| 6 | R.C.C. work with cement approved coarse sand and 2 cm. gauge approved stone grit in proportions of 1:2:4 in Lintel excluding supply ofl reinforcement and its bending but including its fixing and bind the same with 24 B.W.G.G.l. binding wire aridj including necessary centering and shuttering etc. and supply of all material labour, tools and plants required for proper completion of the work including cost of binding wire(S.I.No.285). | - | Cum. | 6,900 | - |
| 7 | M. 150 class brick work in 1:6 cement and coarse sand mortar in Super Structure, including supply of all materials, labour & T&P etc. required for proper completion of the work. S.I. No. 303+309+310 | - | Cum. | 6,630.32 | - |
| 8 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:2:4 in SLAB having span upto 6.0 mtr. excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 284) | - | Cum. | 6,700 | - |
| 9 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. DSR 5.22.1 | 4.88 | Qtl. | 7,798.28 | ₹38,055.61 |
| 10 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR 2.25a | 7.24 | Cum. | 510.06 | ₹3,692.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.57 MB
BOQ_2164670.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid