Loading…
Loading…
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
31 Jul 2026, 2:00 pm5d left
Chief Engineer cum EO, RED/MSRRDA
4th FLOOR, SECURED OFFICE COMPLEX, AT LINE, NORTH AOC, IMPHAL-MANIPUR
MRL07-Langpok to Ishok Lai Maning Khuningthek via Ishok
2026_CESQC_148640_2
MSRRDA/E-TENDER/PMGSY-III, B-I, 2023-24/RT-3/NIT-6
National Competitive Bid
Civil Works - Roads
Percentage
540 days
As per Tender Document
Please refer Tender documents.
9 documents required · 9 mandatory
₹20,000
Chief Engineer cum EO,MSRRDA
₹9.0 L
Yes
Imphal
31 Jul 2026
11 Jul 2026
31 Jul 2026
11 Jul 2026
31 Jul 2026
11 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PAVEMENT WORKS | - | - | - | - |
| 2 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 | 1 | hectare | - | - |
| 3 | Dismantling of structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.I) By Manual Means. C)Reinforced Cement Concrete | 1 | cum | 1 | ₹1 |
| 4 | Removal of Hume Pipes
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. | - | - | - | - |
| 5 | i) Upto 600 mm dia | - | m | 1 | - |
| 6 | iii) Above 900mm dia | - | m | 1 | - |
| 7 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | sqm | - | - |
| 8 | Construction of Embankment with Materials Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | - | cum | 1 | - |
| 9 | Dismantling of flexible pavement
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100m.Stacking serviceable and unserviceable materials seperately as per technical specification Clause 202
By Mechanical Means | 1 | cum | - | - |
| 10 | Construction of Embankment with Materials obtained from Borrow pits.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5 | 1 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.94 MB
Tendernotice_2.pdf
PDF • 1.07 MB
BOQ_233387.xls
BOQ • 0.33 MB
Corrigendum_5.pdf
PDF • 0.70 MB
Corri_3_4.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].