Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹41.2 L+₹2.5 L (6.39%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹42.0 L+₹3.3 L (8.60%)Rejected-Finance | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹42.3 L+₹3.6 L (9.23%)Rejected-Finance | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹42.4 L+₹3.7 L (9.64%)Rejected-Finance | L5 | Rejected-Finance Due to L5 |
| Sl No | Description | Qty | Unit | NIHAR ENTERPRISE L4 | M/S SAIKIA ENTERPRISE L7 | THE SUPPLY AGENCY L6 | 4S ASSOCIATES L5 | Chief Builders &Consultants L1 | M/S BARUAH ELECTRICALS L2 | M/S M R CONSTRUCTION & CO L3 | M/S BARUA REFRIGERATION WORKS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level), complete all as directed. | 23.71 | Cum | 600 ₹14,226 | 625 ₹14,818.75 | 640 ₹15,174.4 | 650 ₹15,411.5 | 500 ₹11,855 Lowest | 585 ₹13,870.35 | 600 ₹14,226 | 630 ₹14,937.3 |
| 2.00 | Demolition of reinforced cement concrete of roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work | 6 | Cum | 600 ₹3,600 | 645 ₹3,870 | 640 ₹3,840 | 650 ₹3,900 | 500 ₹3,000 Lowest | 600 ₹3,600 | 620 ₹3,720 | 650 ₹3,900 |
| 3.00 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as directed. | 19.4 | Cum | 1,200 ₹23,280 | 1,285 ₹24,929 | 1,225 ₹23,765 | 1,250 ₹24,250 | 1,000 ₹19,400 Lowest | 1,195 ₹23,183 | 1,225 ₹23,765 | 1,290 ₹25,026 |
| 4.00 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each, complete all as directed. | 21 | Each | 300 ₹6,300 | 275 ₹5,775 | 305 ₹6,405 | 356 ₹7,476 | 250 ₹5,250 Lowest | 280 ₹5,880 | 305 ₹6,405 | 280 ₹5,880 |
| 5.00 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) exc. 1.5 Sqm but not exc. 4.0 Sqm each, complete all as directed. | 10 | Each | 320 ₹3,200 | 335 ₹3,350 | 325 ₹3,250 | 350 ₹3,500 | 300 ₹3,000 Lowest | 315 ₹3,150 | 325 ₹3,250 | 340 ₹3,400 |
| 6.00 | Dismantling timber scantlings 40 sq. cm and over in section unframed, in any position, complete all as directed. | 0.1 | Cum | 1,300 ₹130 | 1,300 ₹130 | 1,300 ₹130 | 1,300 ₹130 | 1,200 ₹120 Lowest | 1,275 ₹127.5 | 1,300 ₹130 | 1,305 ₹130.5 |
| 7.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as directed. | 15.95 | Qtl | 500 ₹7,975 | 525 ₹8,373.75 | 495 ₹7,895.25 | 500 ₹7,975 | 450 ₹7,177.5 Lowest | 485 ₹7,735.75 | 495 ₹7,895.25 | 530 ₹8,453.5 |
| 8.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as directed. | 990 | Sqm | 72 ₹71,280 | 65 ₹64,350 Lowest | 70 ₹69,300 | 72 ₹71,280 | 65 ₹64,350 Lowest | 68 ₹67,320 | 70 ₹69,300 | 70 ₹69,300 |
| 9.00 | Material and labour for, RCC (1:1.5:3) type A1 (using 20mm graded crushed stone aggregate) as in beams, cantilevers, bressummers, lintels over 1.5m span, complete all as specified and directed. | 3.5 | Cum | 9,250 ₹32,375 | 9,500 ₹33,250 | 9,200 ₹32,200 | 9,250 ₹32,375 | 9,500 ₹33,250 | 8,900 ₹31,150 Lowest | 9,200 ₹32,200 | 9,200 ₹32,200 |
| 10.00 | Material and labour for, RCC (1:1.5:3) type A1 (using 20mm graded crushed stone aggregate) as in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like, complete all as specified and directed. | 2.5 | Cum | 9,500 ₹23,750 | 9,900 ₹24,750 | 9,500 ₹23,750 | 9,500 ₹23,750 | 9,500 ₹23,750 | 9,265 ₹23,162.5 Lowest | 9,500 ₹23,750 | 9,700 ₹24,250 |
Tender Value
₹38.6 L
EMD Value
₹78,000
Closing Date
11 Sept 2025, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO BUILDING NO P/2 P/5 P/32 AND P/33 AT SARAIBARI IN JORHAT MIL STATION UNDER GE JORHAT
2025_MES_727184_1
8283/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER
₹78,000
Yes
21 Oct 2025
22 Aug 2025
12 Sept 2025
22 Aug 2025
11 Sept 2025
5 Sept 2025
22 Aug 2025 - 29 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .