| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC less |
| 2 | L2₹4.2 L+₹4,783.98 (1.16%)Rejected-AOC | ₹4.2 L+₹4,783.98 (1.16%) | L2 | Rejected-AOC more |
| Sl No | Description | Qty | Unit | SRII BALAJI CONSTRUCTIONS L1 | svasit Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC as per directed by the departmental officers CCMC SOR-25-26 Pg.no-3 | 2 | Cu.m | 5,071 ₹10,129.32 Lowest | 5,080 ₹10,147.3 |
| 2.00 | Dismantling the damaged Plain cement concrete as per directed by the departmental officers CCMC SOR-25-26 Pg.no-3 | 10 | Cu.m | 572 ₹5,720 Lowest | 580 ₹5,800 |
| 3.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 10 m3 CCMC SOR-25-26 Pg.no-3 | 15 | Cu.m | 220 ₹3,300 Lowest | 230 ₹3,450 |
| 4.00 | Conveyance of excavated earth and clearing away from site to a lead of 2KM from site etc., complete CCMC SOR-25-26 Pg.no-3 | 25 | Cu.m | 104 ₹2,600 Lowest | 110 ₹2,750 |
| 5.00 | Plain Cement Concrete1:4:8 (one part of cement, four part of Crushed Stone Sand (M-Sand) and Eight part of coarse aggregates ) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification CCMC SOR-25-26 Pg.no-4 | 10 | Cu.m | 5,962 ₹59,620 Lowest | 6,000 ₹60,000 |
| 6.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc., including strutting 3 m high using mild steel sheets of size 90 cm X 60 cm X and B.G10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size10cm X 6.5cm (spacedat about 90 cmc/c)and supported dycasur in a props of 10 cm to13 cm dia (spacedof75cmC/C)complying with standard specification and directed- 10 m 2 (P & D) Data 38 CCMC SOR-25-26 Pg.no-5 | 180 | Sq.m | 534 ₹96,120 Lowest | 550 ₹99,000 |
| 7.00 | Plain Cement Concrete1:3:6 (one cement,three crushed Stone Sand(M Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost andconveyance of all materials to site and including for the mixing, laying and labour charges etc., completeas per standard specification CCMC SOR-25-26 Pg.no-4 | 30 | Cu.m | 6,721 ₹2,01,630 Lowest | 6,750 ₹2,02,500 |
| 8.00 | Suppling and fabricating and placing in position MS (or)R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. CCMC SOR-25-26 Pg.no-8 | 2 | Qtl | 9,542 ₹19,084 Lowest | 9,600 ₹19,200 |
| 9.00 | Manufacturing,supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges,casting of slab, finishing,curing and fixing in position in all floor setc. complet ecomplying with standard specification and as directed. CCMC SOR-25-26 Pg.no-14 | 14 | Sq.m | 1,020 ₹14,280 Lowest | 1,030 ₹14,420 |
| 10.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Dec 2025, 3:00 pmClosed
Assistant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018
Reconstruction of storm water drain at nadar street in ward no 80 central zone
2025_MAWS_631177_45
E6/2025-26/CZ
Open Tender
Civil Works
Works
Central zone
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5,000
Yes
16 Aug 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Dismantling the damaged RCC as per directed by the departmental officers CCMC SOR-25-26 Pg.no-3
Dismantling the damaged Plain cement concrete as per directed by the departmental officers CCMC SOR-25-26 Pg.no-3
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 10 m3 CCMC SOR-25-26 Pg.no-3
Conveyance of excavated earth and clearing away from site to a lead of 2KM from site etc., complete CCMC SOR-25-26 Pg.no-3
Plain Cement Concrete1:4:8 (one part of cement, four part of Crushed Stone Sand (M-Sand) and Eight part of coarse aggregates ) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification CCMC SOR-25-26 Pg.no-4
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc., including strutting 3 m high using mild steel sheets of size 90 cm X 60 cm X and B.G10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size10cm X 6.5cm (spacedat about 90 cmc/c)and supported dycasur in a props of 10 cm to13 cm dia (spacedof75cmC/C)complying with standard specification and directed- 10 m 2 (P & D) Data 38 CCMC SOR-25-26 Pg.no-5
Plain Cement Concrete1:3:6 (one cement,three crushed Stone Sand(M Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost andconveyance of all materials to site and including for the mixing, laying and labour charges etc., completeas per standard specification CCMC SOR-25-26 Pg.no-4
Suppling and fabricating and placing in position MS (or)R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. CCMC SOR-25-26 Pg.no-8
Manufacturing,supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges,casting of slab, finishing,curing and fixing in position in all floor setc. complet ecomplying with standard specification and as directed. CCMC SOR-25-26 Pg.no-14
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_755631.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .