| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.8 L+₹8,930 (1.16%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹7.8 L+₹14,014 (1.82%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SUJEET KUMAR SINGH CONTRACTOR L1 | M/s Upendra Singh Thikedar L3 | M/s Tripty and Associates L2 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil. | 30 | One Cubic Metre | 300 ₹9,000 | 250 ₹7,500 Lowest | 250 ₹7,500 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 30 | One Cubic Metre | 70 ₹2,100 Lowest | 150 ₹4,500 | 190 ₹5,700 |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
| 3.01 | 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) | 4 | One Cubic Metre | 7,000 ₹28,000 | 6,300 ₹25,200 Lowest | 6,500 ₹26,000 |
| 4.00Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: | ||||||
| 4.01 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 2 | One Cubic Metre | 9,900 ₹19,800 | 9,600 ₹19,200 | 9,500 ₹19,000 Lowest |
| 5.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 14 | One Cubic Metre | 9,500 ₹1,33,000 | 8,500 ₹1,19,000 Lowest | 9,000 ₹1,26,000 |
| 6.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||
Tender Value
₹9.0 L
EMD Value
₹17,918
Closing Date
2 Sept 2025, 6:00 pmClosed
NODAL OFFICER (TENDER)
O/o Chief Engineer (Civil)-II, BSNL UP(E) Civil Zone, 5th Floor, Door Sanchar Sadan, LaPlace, Shahnazaf Road, Hazratganj, Lucknow-226001
Reconstruction of fallen / tilted boundary wall in T.E. compound at Maryadpur, OA- Mau
2025_BSNL_246382_1
40/2025-26/BSNL/CE-II/LKO
Open Tender
Civil Works
Item Rate
60 days
Maryaadpur Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash), BSNL O/o GMTD, Gorakhpur
₹17,918
Yes
11 Sept 2025
25 Aug 2025
8 Sept 2025
25 Aug 2025
2 Sept 2025
25 Aug 2025
25 Aug 2025 - 2 Sept 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
12 mm cement plaster of mix :
1:6 (1 cement: 6 fine sand) sqm
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 (1 cement: 6 fine sand) sqm
6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
Finishing walls with water proofing cement paint of required shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
Two or more coats on new work
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
Channels, angles, tees and flats
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
Brick work with old bricks to be reused upto plinth level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with old bricks to be reused in superstructure above plinth in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
From brick work in cement mortar
Extra for removing tree damaging the compound wall including uprooting, cutting, disposing etc. all complete as per direction of Engineer-in-charge.
Fencing with available angle iron post placed at required distance embedded in cement concrete blocks, provided with horizontal lines and two diagonals interwoven with horizontal wires, of available barbed wire , between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete as per direction of Engineer-in-charge. (Cost of concrete work to be paid for separately but inclusive of all operations regarding picking, straightening etc. of old barbed wire & angle posts if required.) Payment to be made per metre cost of total length of barbed wire used.
Credit to old available brick bats including all as per direction of Engineer-in-charge .
Credit to old available brick including all as per direction of Engineer-in-charge . (In case of no any theft)
Credit to old available badly rusted angle iron posts and barbed wire including all as per direction of Engineer-in-charge .
M/s Tripty and Associates (BID ID -893789)
M/s Upendra Singh Thikedar (BID ID -894024)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .