| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹78.5 L+₹1.2 L (1.56%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹79.5 L+₹2.3 L (2.95%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹82.0 L+₹4.7 L (6.12%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹92.5 L+₹15.2 L (19.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Pradeep Garg L11 | M/s Raj Kumar Sachddeva L4 | sachin prakash L7 | ALTECH GROUP L5 | Naagar Infrastructure Pvt Ltd L9 | M/S Bhawani Constructions L10 | C P Singh L6 | Sham Lal Gupta and Sons L8 | satender kumar L3 | D.A. CONSTRUCTIONS L2 | Prashant Khandelwal L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge. | 67,554 | Kg | 10 ₹6,75,540 | 9.99 ₹6,74,864.46 | 17.31 ₹11,69,359.74 | 2 ₹1,35,108 | 15 ₹10,13,310 | 5 ₹3,37,770 | 3 ₹2,02,662 | 3.2 ₹2,16,172.8 | 4 ₹2,70,216 | 4 ₹2,70,216 | 1.55 ₹1,04,708.7 Lowest |
| 2.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 67,554 | Kg | 130 ₹87,82,020 | 99 ₹66,87,846 Lowest | 116.81 ₹78,90,982.74 | 118 ₹79,71,372 | 120 ₹81,06,480 | 135 ₹91,19,790 | 122 ₹82,41,588 | 130 ₹87,82,020 | 103 ₹69,58,062 | 100 ₹67,55,400 | 99.9 ₹67,48,644.6 |
| 3.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 10 | cum | 8,000 ₹80,000 | 5,999 ₹59,990 | 4,731.31 ₹47,313.1 | 8,000 ₹80,000 | 6,500 ₹65,000 | 7,000 ₹70,000 | 5,500 ₹55,000 | 6,000 ₹60,000 | 6,601 ₹66,010 | 6,500 ₹65,000 | 4,257.9 ₹42,579 Lowest |
| 4.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 11 | cum | 8,500 ₹93,500 | 6,499.99 ₹71,499.89 | 6,431.31 ₹70,744.41 | 8,500 ₹93,500 | 7,500 ₹82,500 | 8,500 ₹93,500 | 6,500 ₹71,500 | 7,000 ₹77,000 | 6,600 ₹72,600 | 7,000 ₹77,000 | 5,628.76 ₹61,916.36 Lowest |
| 5.00 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge With cement mortar 1:4 (1cement: 4 coarse sand) | 225 | sqm | 600 ₹1,35,000 | 399 ₹89,775 | 379.31 ₹85,344.75 | 300 ₹67,500 | 350 ₹78,750 | 500 ₹1,12,500 | 300 ₹67,500 | 350 ₹78,750 | 268 ₹60,300 Lowest | 280 ₹63,000 | 301.09 ₹67,745.25 |
| 6.00 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 3,450 | sqm | 8 ₹27,600 | 4.9 ₹16,905 | 24.31 ₹83,869.5 | 20 ₹69,000 | 10 ₹34,500 | 20 ₹69,000 | 10 ₹34,500 | 15 ₹51,750 | 4 ₹13,800 Lowest | 6 ₹20,700 | 8.9 ₹30,705 |
| 7.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 3,450 | sqm | 150 ₹5,17,500 | 81 ₹2,79,450 | 33.31 ₹1,14,919.5 Lowest | 90 ₹3,10,500 | 220 ₹7,59,000 | 100 ₹3,45,000 | 90 ₹3,10,500 | 100 ₹3,45,000 | 70 ₹2,41,500 | 50 ₹1,72,500 | 71.71 ₹2,47,399.5 |
| 8.00 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm | 2,600 | sqm | 250 ₹6,50,000 | 99.99 ₹2,59,974 | 99.31 ₹2,58,206 | 160 ₹4,16,000 | 250 ₹6,50,000 | 300 ₹7,80,000 | 120 ₹3,12,000 | 200 ₹5,20,000 | 70 ₹1,82,000 Lowest | 130 ₹3,38,000 | 123.43 ₹3,20,918 |
| 9.00 | Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). Raj Nagar Plain white marble/ Udaipur green marble/ Zebra black marble. Area of slab over 0.50 sqm | 30 | sqm | 4,500 ₹1,35,000 | 1,969.99 ₹59,099.7 Lowest | 4,131.31 ₹1,23,939.3 | 3,600 ₹1,08,000 | 2,500 ₹75,000 | 5,300 ₹1,59,000 | 4,000 ₹1,20,000 | 3,100 ₹93,000 | 3,007 ₹90,210 | 2,850 ₹85,500 | 3,407.77 ₹1,02,233.1 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
10 Oct 2022, 3:00 pmClosed
Executive Engineer(East Campus),UWD
Executive Engineer(East Campus),UWD
Repair / Strengthening of Existing Boundary wall at East Delhi Campus of GGSIPU
2022_GGSIP_230318_1
05/EE/UWD(East Campus)/2022-23
Open Tender
Civil Works
Works
45 days
Executive Engineer(East Campus), UWD
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 L
14 Oct 2022
3 Oct 2022
10 Oct 2022
3 Oct 2022
10 Oct 2022
3 Oct 2022
Amount
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge With cement mortar 1:4 (1cement: 4 coarse sand)
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm
Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). Raj Nagar Plain white marble/ Udaipur green marble/ Zebra black marble. Area of slab over 0.50 sqm
D.A. CONSTRUCTIONS
satender kumar
M/s Raj Kumar Sachddeva
ALTECH GROUP
C P Singh
sachin prakash
Sham Lal Gupta and Sons
Naagar Infrastructure Pvt Ltd
M/S Bhawani Constructions
Pradeep Garg
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_298980.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .