| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance 7 B CHOKALINGAM STREET SHANMUGAPURAM COLONY VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹10.3 L (5.42%)Admitted-Finance NA | ₹2.0 Cr+₹10.3 L (5.42%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹16.8 L (8.87%)Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | ₹2.1 Cr+₹16.8 L (8.87%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 Cr+₹18.5 L (9.79%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.1 Cr+₹18.5 L (9.79%) | L4 | Admitted-Finance |
| 5 | L5₹2.1 Cr+₹23.4 L (12.4%)Admitted-Finance NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹2.1 Cr+₹23.4 L (12.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Thulasingam L1 | G KANNAN L2 | K.S.MANJU L3 | K DHINAKARAN L4 | petchimuthu L5 | bharaniengineeringworks L6 | JERALIN JERISH L7 | A.H.CONSTRUCTIONS L8 | ASAITHAMBI.M L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||||||||
| 1.01 | Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, lift etc complete . | 2,000 | Sqm | - | - | - | - | - | - | - | - | - |
| 2.00 | Site grading and levelling and sectioning by earth moving machineries as per the direction of site engineer including cost of all labour ,lead, liftetc complete | 5 | Hr | - | - | - | - | - | - | - | - | - |
| 3.00 | Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer. | 4,110 | cum | - | - | - | - | - | - | - | - | - |
| 4.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | 1,286 | Cum | - | - | - | - | - | - | - | - | - |
| 5.00 | Supplying and filling of river sand in foundation and basement with well water and consolidation as per specn.including cost of all materials labour, lead, lift, etc., complete. | 224 | Cum | - | - | - | - | - | - | - | - | - |
| 6.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete. | 174 | Cum | - | - | - | - | - | - | - | - | - |
| 7.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, litf, etc., complete. | 199 | Cum | - | - | - | - | - | - | - | - | - |
| 8.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 3 | Cum | - | - | - | - | - | - | - | - | - |
| 9.00 | RCC 1:1.5:3 using 12 to 20mm including cost of all materials, form work, centering, curing, all labour charges, water charges , lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete. | 18 | Cum | - | - | - | - | - | - | - | - | - |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
20 May 2020, 2:00 pmClosed
The Chief Engineer,TP-II/Trichy
O/o.The Chief Engineer, Transmission Projects II/Mannarpuram, Trichy.
Providing foundation concrete for structures, equipment plinths, Retaining wall around the yard, Cable duct and other allied works for the proposed Veerakudi 110 KV SS in Thanjavur EDC.
2020_EB_160453_1
CE/TP II/TRY/C-44/19-20
Open Tender
Civil Works
Works
120 days
Veerakudi
As per tender specification
4 documents required · 4 mandatory
₹0
₹2.3 L
Yes
27 Jul 2020
7 Mar 2020
21 May 2020
7 Mar 2020
20 May 2020
7 Mar 2020
Amount
Civil works
Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, lift etc complete .
Site grading and levelling and sectioning by earth moving machineries as per the direction of site engineer including cost of all labour ,lead, liftetc complete
Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Supplying and filling of river sand in foundation and basement with well water and consolidation as per specn.including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, litf, etc., complete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete.
RCC 1:1.5:3 using 12 to 20mm including cost of all materials, form work, centering, curing, all labour charges, water charges , lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete.
RCC. 1:1 .5:3 mix using 12 mm to 20mm HBS metal(machine crushed) with formwork including cost of all labour, materials, water charges, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, water charges ,centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For culvert deck slab concrete with 230mm thick.
Providing concrete road with R.C.C 1:2:4,150 mm thick using 12 to 20 mm metal by using paving machinery with compaction including cost of materials leads and lifts etc.complete.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Brickwork in CM 1:5 mix using bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, water charges , labour, lead, lift, curing, etc., complete. By using II class Champer Burnt bricks
PCC 1:3:6, using 20mm HBG metal foundation without form work including cost of cement, all materials,water charges, labour, lead, lift, etc. complete.
PCC 1:3:6, using 20mm HBG metal foundation with form work including cost of cement, all materials,water charges , labour, lead, lift, etc. complete.
PCC 1:2:4, using 20mm HBG metal foundation without form work including cost of cement, water charges, all materials, labour, lead, lift, etc. complete.
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
Labour charges for transporting from casting yard to curing tank,curing tank cable duct , aligning and fixing of RCC pre cast cover slab as directed by the site engineer including all labour lead lifts etc complete
Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete ( Angle Supplied by department )
Supply ,Labour charges for fabrication, fixing in position of MS rail with proper anchorage by using welding and cutting to the required size and length anf fixing over transformer plinth as per departmental specifications including cost of labour, transport, placing in position, lead,lift etc complete.
Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, water charges, labour, lead, litf, etc, complete.
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Supply and apreading of 20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Colour washing two coats with approved qulity of colour pigments over one coat of white cement including cost of all materials , labour lead and lift etc complete.
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Supplying and laying PVC pipe 110 mm outer dia 6kg/ cm2 ISI make for laying the cable including cost of pvc pipe coupling lbour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. 32 mm dia
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete.25mm dia
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete.20mmdia.
Supply and fixing of 50 Sq.mm GI Chain link fencing of 10 gauge with standard width of 1.80m height including cost of all material, labour for fixing, transportion, lead, lift, etc., complete.
Fabrication and fixing in position GI/MS angle 75x75X6 mm for corner and intermediate and Supply of MS flat 65X10 mm (angle both side )& GI bolt & nut including cost of all materials, transporting, labour charges, welding charges, cutting charges, drilling holes with provision of GI 175x16mm size bolt, nut and washers of required sizes for holding chain link fencing, 1 coat of primer of approved quality and colour, enamel painting with two coats, all leads and lifts etc., complete and placing in position as per the specification and drawings and as directed by Site Engineer. ( angle only suppliedby department )
providing water mixed macadam 1;1 proportion using quarry dust and 40mm metalmixed with machine adding required water for road and bell mouth including cost of allmaterials ,labour,well consolidation with power roller lead,lift,etc complete
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification.
Supplying and fixing in position of MS grill gate including cost of all materials lead, lift, etc. as per type design drawing with proper locking arrangements as directed by the engineer at site including cost of painting with two coats of enamel paint over with one coat of red oxide.
Supplying and laying 50 mm Dia GI pipe with ISI make including cost of GI pipe coupling labour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete
painting and writing the name of substation in the wing wall both in English & Tamil with artist painter including cost of all material, labour for fixing, transportion, lead, lift, etc., complete.
Providing groutpocket holes includig cost of all labour charges, lead and lift etc., complete.
Supplying and fixing of PVC end cap of 20mm size of approved quality cost of all materials, labour for laying and making holes, lead, lift, etc., complete for water supply arrangements to earth pit.
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements.. 32mm dia
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements.. 25mm dia
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements..20mm dia
Supplying and fixing inposition of GM gate valve best quality such as leader, zeolite, zenith including cost of all special fixtures lead, lift,etc., complete.32 mm dia GM Gate valve
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
G KANNAN
K.S.MANJU
K DHINAKARAN
petchimuthu
bharaniengineeringworks
JERALIN JERISH
A.H.CONSTRUCTIONS
ASAITHAMBI.M
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_192006.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .