Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
12 Jun 2026, 6:00 pm5d left
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Ist installment for construction of community hall near Devasthan Baba Kaliveer Village Prangla,Pyt. Matto Block khour under CDF 2026-27. (2nd Call)
2026_RDPR_311569_2
e-NIT No. 60-REWJ of 2026 dated 04-06-2026
Open Tender
Civil Works
Executive Engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH 0515
₹9,800
5 Jun 2026
5 Jun 2026
13 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes cables etc. (not exceeding 1.5m in width) and for shafts wells , cesspits and the likenot exceeding10sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m , including getting out excavated earth and disposal of surplus excavated earth as directed with in lead 50mtrs neatly dressed in A.K.O.S. | 14.51 | cum. | 479.3 | ₹6,954.64 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.62 | cum. | 4,826.5 | ₹7,818.93 |
| 3 | P/L in position Cement conc. 1:1.5:3 mix for RCC Work using 20 mm N/Size Agg. For Column/Beams/Slab excluding the cost of centring & shuttering all work upto plinth level. | 9 | cum. | 7,788.4 | ₹70,095.6 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.27 | cum. | 9,395.7 | ₹21,328.24 |
| 5 | Steel reinforcement for RCC work including straightening,cutting, bending and placeing in all position with complete binding. | 1,135.66 | KG | 123.2 | ₹1,39,913.31 |
| 6 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. | 7 | cum. | 5,733.6 | ₹40,135.2 |
| 7 | Foundtion & Plinth | 66.91 | sqm. | 286.35 | ₹19,159.68 |
| 8 | COLUMNS | 22.3 | sqm. | 742.55 | ₹16,558.86 |
| 9 | Brickwork with common burnt clay (non modular bricks of class designation 7.5in foundation and plinth including curing in 1:6 mix mortar including extra for brickwork with common burnt clay bricks/cement conc. Bricks in super structure above plinth level upto floor five level. | 17.4 | cum. | 9,027.2 | ₹1,57,073.28 |
| 10 | Carriage of SAND constructed material 7 km | 9 | cum. | 232.06 | ₹2,088.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1008780.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid