Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-Finance | ₹16.6 L | L1 | Accepted-Finance Lowest |
Tender Value
₹19.6 L
EMD Value
₹19,600
Closing Date
31 Mar 2026, 6:00 pmClosed
CEO ZP THANE
CEO Office Z P Thane
Renovation of Well at Shirpur, Tal. Murbad Dist.Thane
2026_THANE_1291052_1
E-TENDER NOTICE NO 01/EE/RWSD/ZPTHANE/ 2025-26/MKSS 3rs CALL
Open Tender
Civil Works
Percentage
Murbad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹19,600
2 Jul 2026
28 Mar 2026
1 Apr 2026
28 Mar 2026
31 Mar 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismentlingthe existing structure/ Removing lime or lean cement concrete including stacking the spoils as directed with alll eads, liftsetc, complete. | |||||
| 2 | Excavation for foundation in earth soil of all types, sand, gravel & soft murum including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete.
a) Lift 0 to 1.50 M. | 1 | Cum | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete.
a) Lift 1.50 to 3.00 M | 1 | Cum | - | - |
| 4 | Excavation for foundation in hard murum with boulders including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete.
a) Lift 3.00 to 4.50 M | 1 | Cum | - | - |
| 5 | Excavation for foundation in soft rock old lime masonary foundation including trimming & leveling the bed by chiselling where necessary & removing the excavated material & stacking it in measurable heaps within a distance of 50 m from the area & lifts as below, normal dewatering, excluding the backfilling etc complete. b) Lift 4.50 to 6.00 M | 1 | Cum | - | - |
| 6 | Excavation for foundation in hard rock by controlled blasting, including trimming & leveling the bed by chiselling where necessary & removing the excavated material & stacking it in measurable heaps within a distance of 50 m from the area & lifts as below, normal dewatering, excluding the backfilling etc complete.
b) Lift 6.00 to 7.50 M | 1 | Cum | - | - |
| 7 | c) Lift 7.50 to 9.00 M | 1 | Cum | - | - |
| 8 | d) Lift 9.00 to 10.00 M | 1 | Cum | - | - |
| 9 | e) Lift 10.50 to 12.00 M | 1 | Cum | - | - |
| 10Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
nit1mkssmerged.pdf
Tender Documents • 1.36 MB
BOQ_2219293.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].