Tender Value
₹2.0 L
EMD Value
₹3,960
Closing Date
25 Aug 2026, 6:00 pmDue today
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_321283_7
2ND CALL e-NIT No. 112 REW UDHAMPUR of 2026-27 Dated 17-08-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,960
18 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil | 1.53 | cum | 479.3 | ₹733.33 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.1 | cum | 7,788.4 | ₹8,567.24 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.02 | cum | 9,395.7 | ₹9,583.61 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 191.6 | Kg | 123.2 | ₹23,605.12 |
| 5 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 79.09 | Sqm | 24.12 | ₹1,907.65 |
| 6 | P/L Aggregate 40 mm Dry | 6.09 | cum | 2,809.45 | ₹17,109.55 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.89 | cum | 6,591.25 | ₹19,048.71 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 0.56 | cum | 5,733.6 | ₹3,210.82 |
| 9 | Providing and laying 60mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 79.09 | sqm | 816.15 | ₹64,549.3 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 8.12 | sqm | 286.35 | ₹2,325.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1072211.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].