Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC Seleted through the transparent lottery | |
| 2 | L1₹9.3 LRejected-AOC | L1 | Rejected-AOC Not Seleted through the transparent lottery | |
| 3 | L1₹11.4 LRejected-AOC | L1 | Rejected-AOC Not Seleted through the transparent lottery | |
| 4 | L1₹11.4 LRejected-AOC | L1 | Rejected-AOC Not Seleted through the transparent lottery | |
| 5 | L1₹11.4 LRejected-AOC | L1 | Rejected-AOC Not Seleted through the transparent lottery |
Tender Value
₹11.4 L
EMD Value
₹11,400
Closing Date
24 Jul 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER MAIN DAM DIVISION, BURLA
O/o- SUPERINTENDING ENGINEER MAIN DAM DIVISION, BURLA
Two phase cleaning of bushes and grass along with cutting and uprooting the tree from RD 21500 ft. of 3rd Gap to RD 31450 ft. (beginning of 4th Gap) of Left dyke for the year 2026-27
2026_CEBBU_135765_8
MDD-e-05/2026-27
Open Tender
Civil Works - Others
Percentage
240 days
BURLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,400
Yes
28 Sept 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
24 Jul 2026
15 Jul 2026
15 Jul 2026 - 24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning all types of grasses, shrub jungles, small bushes and cleaning the work site by removing the rubbish and dumping the same away from the work site with all leads, lifts and delifts including cost of all labours, T&P etc. complete and as per direction of Engineer-in-charge. | 0.29 | Sqm | - | - |
| 2 | Earth work excavation in ordinary soil in borrow area with all leads, lifts and delifts including rough dressing and breaking clods to maxium 5cm to 7cm and laying in layers not exceeding 0.30 M in depth with cost of all labours and T&P etc .complete as per direction of Engineer-in-charge. | - | Cum | 0.2 | - |
| 3 | Removing old revetment in approns and repacking with old hard granie existing stone 30cm and above size available in the existing slope including with all leads, lifts and delifts with cost of all labours and T&P etc. complete as per direction of Engineer-in-charge. (Labour charges only) | - | Cum | 1 | - |
| 4 | Cutting and uprooting trees including removal and making good to the damages to ground, trees upto 1.50 mtr. girth with all leads, lifts and delifts including cost of all labours, T&P etc. complete and as per direction of Engineer-in-charge. | - | Nos | 1 | - |
stage.html
html • 0.13 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_601543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Bid-08.pdf
Tender Documents • 1.10 MB
BOQ_601543.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .