Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹14,482.60 (9.40%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MRP ENTERPRISES | ASHWATH MARINE INFRA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Forming Temporary Canal by excavation of sand, silt, other loose soil, ash using heavy machineries and disposing the earth & ash to 2km away from site including cost of labours, machineries, lead, lift, etc., complete. | 515.7 | M3 | 99,530.1 ₹1,17,445.52 Lowest | 1,08,812.7 ₹1,28,398.99 |
| 2.00 | Supplying and Laying of 600 mm dia RCC Hume Pipe, 2” thickness including cost of required specials, cost of all materials, taxes, duties, labour, lead, lift, solvent, transporting charges, laying charges to proper grade and alignment etc., complete as directed by the Engineer at site. | 20 | Rm | 54,600 ₹64,428 Lowest | 59,800 ₹70,564 |
Tender Value
Refer Docs
EMD Value
₹1,600
Closing Date
19 Nov 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Forming Temporary Canal from CWPH 1 to outfall near Compound Wall at TTPS
2025_EB_619812_1
CE SE C TTPS 290 2025 26
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,600
Yes
3 Mar 2026
4 Nov 2025
20 Nov 2025
4 Nov 2025
19 Nov 2025
4 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_741071.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .