Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC IDUVAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | 1 | Accepted-AOC ok | |
| 2 | 2₹2.1 L+₹420 (0.20%)Rejected-AOC | 2 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | DHAKSHA CONSTRUCTION L2 | Ramachandran L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting light or sandySoil or silt from infilteration wells below water level including the charges of speacial T&P etc., complete complying with standard specification. | 8 | m3 | 17,600 ₹17,600 | 17,024 ₹17,024 Lowest |
| 2.00 | Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 2 | m3 | 360 ₹360 | 312 ₹312 Lowest |
| 3.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 1 | m3 | 320 ₹320 | 313 ₹313 Lowest |
| 4.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 15,200 ₹15,200 | 15,172 ₹15,172 Lowest |
| 5.00 | Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 4 | M2 | 1,600 ₹1,600 | 1,568 ₹1,568 Lowest |
| 6.00 | P.C.C.1:3:6 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 16,040 ₹16,040 Lowest | 16,040 ₹16,040 Lowest |
| 7.00 | Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 3 | m3 | 25,500 ₹25,500 | 25,266 ₹25,266 Lowest |
| 8.00 | Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 300 | Kg | 30,000 ₹30,000 Lowest | 30,000 ₹30,000 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 4 | m3 | 44,800 ₹44,800 Lowest | 46,760 ₹46,760 |
| 10.00 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1 | m3 | 9,060 ₹9,060 | 9,057 ₹9,057 Lowest |
Tender Value
₹2.7 L
EMD Value
₹2,700
Closing Date
12 Mar 2024, 3:00 pmClosed
EXECUTIVE OFFICER
KETTI TOWN PANCHAYAT KETTI POST
Maintenance of GLR at Yellanalli
2024_DTP_443864_1
424/2023
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
60 days
KETTI TOWN PANCHAYAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,700
Yes
13 Oct 2025
7 Mar 2024
12 Mar 2024
7 Mar 2024
12 Mar 2024
7 Mar 2024
7 Mar 2024 - 12 Mar 2024
Desilting light or sandySoil or silt from infilteration wells below water level including the charges of speacial T&P etc., complete complying with standard specification.
Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:3:6 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:5 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Painting two coats using best emulsion and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying of G.I pipes and G.I specials to proper gradient and alighnment and testing the pipe with water and the rate including cost and conveyance of all charges etc., complete. 50 MM PIPE
Laying and jointing G.I pipes and G.I specials to proper gradient and alighnment and testing the pipe with water and the rate including cost and conveyance of all charges etc., complete. 50 MM PIPE
Labour charges for cutting and threading G.I pipes and the rate including cost and conveyance of all charges etc., complete.Cutting 50 MM PIPE
Threading 50 MM PIPE
DHAKSHA CONSTRUCTION (BID ID -1041175)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .