Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-Finance | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹4.9 L+₹53,242.39 (12.2%)Accepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹6,100
Closing Date
5 Apr 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 3 Nos including static balancing of fan blades painting of gear box base frame channel structures fan blades hub and arm sleeves grills and hand rails etc in cooling tower Stage II
2022_EB_225529_1
CE / MTPS-I / SE / M-I / CA / OT. 262 /2021-22
Open Tender
Power/Energy Projects/Products
Works
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹6,100
Yes
7 Apr 2022
14 Mar 2022
6 Apr 2022
14 Mar 2022
5 Apr 2022
14 Mar 2022
Amount
Charges for dismantling the existing hub hood, fan blades and hub with arm sleeves assembly from the gearbox and lead outside the fan stack
Charges for leading the hub with the respective arm sleeves, fan blades assembly & hub hood inside the fan stack and assembling the hub, arm sleeves, fan blades assembly and hub hood over the gearbox one by one.
Charges for complete dismantling of gear box internals one by one, cleaning, inspection & renewal of gear box internals if necessary, reassembling, aligning of drive shaft assembly and re-commissioning of I.D fan gearboxes.
Charges for renewal of worm shaft bearing (Both end) after dismantling the existing worn-out / damaged worm shaft bearing.
Charges for renewal of wheel shaft bearing(Both end) after dismantling the existing worn-out / damaged wheel shaft bearing.
Assembling the blades with the respective arm sleeves (after Weighing the individual blades and respective arm sleeves) separately and fixing the hub assembly with blades to the balancing kit mounted in the Cooling Tower-IV
Static balancing of the fan blade assembly.
Dismantling of fan blades and hub assembly from the balancing kit one by one after marking proper identification.
Charges for transporting of hub, arm sleeves and fan blades (8 Nos./ set) from cooling tower-top to ground floor and lifting the same to 12 m elevation of fan stack floor.(Necessary Transport Vehicle will be provided by TANGEDCO)
Charges for cleaning and painting of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars and FRP fan blades with one coat of Epoxy red oxide primer and Two coats of first quality epoxy grey paint including the cost of paint.
Charges for removing the existing grills & leading from inside fan stack to outside fan stack, cleaning and re fixing the painted grills at its existing position properly with tag welding inside the fan stack.
Charges for cleaning and painting with two coats of 1st quality Heat resistant Aluminium paint over the grills, front & rear side gear box base frame channel structure, hand rails and gear box oil pipe line provided inside the fan stack.
Cost of Paint Epoxy red oxide primer for SL.No.10
Cost of Two coats Paint Epoxy grey paint for SL.No.10
Cost of Paint Epoxy Thinner for SL.No.10
Cost of cutting Gas for Sl.No.11
Cost of Heat resistant Aluminium paint for SL.No.12
Consumable and T&P Cost for SL.No.1 to 5 ,8,9 &11
SS ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .