Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹37.9 L+₹1.9 L (5.21%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ashok and Co L2 | M/S KALSI ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Schedule A Part-I (B/R) Works
Demolition of brick work or stone/ boulder Masonry, built in cement mortar including all quoins, pillars etc complete all as specified and directed. | 7.5 | Cum | 100 ₹750 Lowest | 100 ₹750 Lowest |
| 2.00 | Material & Labour Brick work with sub class 'B' bricks built in CM 1:6 straight or curved on plan exc 6 m mean radious . and complete all as specified and directed. | 7.5 | Cum | 4,000 ₹30,000 Lowest | 6,000 ₹45,000 |
| 3.00 | Taking down cement plaster on brick or stone walls, etc., including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and directed. | 770 | Sqm | 10 ₹7,700 Lowest | 10 ₹7,700 Lowest |
| 4.00 | M & L for Rendering 15 mm thick on other than fair faces of walls of brick work or concrete surfaces in cement mortar 1:6 compound finished even and smooth without using extra cement complete all as specified and directed. | 380 | Sqm | 150 ₹57,000 Lowest | 200 ₹76,000 |
| 5.00 | M & L for Rendering 15 mm thick on fair faces of walls of brick work or concrete surfaces in cement mortar 1:4 with water proofing compound finished even and smooth without using extra cement complete all as specified and as directed.
Note:- (i) water proofing compound on only top layer of plaster (ie 5mm thick)
(ii) Qty of WPC shall be 200ml per cement bag or per manufacturer instructions
(iii) WPC shall be measured and paid separately) | 480 | Sqm | 150 ₹72,000 Lowest | 200 ₹96,000 |
| 6.00 | M & L for Supply only liquid water proofing compound complete all as specified and directed. | 15.6 | Litre | 50 ₹780 Lowest | 50 ₹780 Lowest |
| 7.00 | Material & Labour Preparation of newly plastered wall surfaces and applying two coats of distemper oil emulsion over one coat of birla white putty 3mm thick preparatory to distempering complete all as specified and directed.
Note: The painting is to be done using smart painting tools and technique as mentioned in Particular specification. Tenderer shall take this aspect in consideration before quoting his rates and no claim on account of misunderstanding or any thing else shall be admissible/acceptable at any later stage | 480 | Sqm | 70 ₹33,600 Lowest | 80 ₹38,400 |
| 8.00 | Material & Labour for priming new surface of wall with alkal iresistant priming paint of and applying two coats of cement base paint complete all as specified and directed.
Note: The painting is to be done using smart painting tools and technique as mentioned in Particular specification. Tenderer shall take this aspect in consideration before quoting his rates and no claim on account of misunderstanding or any thing else shall be admissible/acceptable at any later stage | 380 | Sqm | 80 ₹30,400 | 40 ₹15,200 Lowest |
| 9.00 | Taking down Chowkats or frames n. exceeding 1.5 Sqm each (Without taking off shutters from the frame) complete all as specified and directed. | 15 | Each | 200 ₹3,000 | 100 ₹1,500 Lowest |
| 10.00 | Taking down Chowkats or frames exceeding 1.5 Sqm but not exceeding 4.00 Sqm each (Without taking off shutters from the frame) complete all as specified and directed. | 25 | Each | 200 ₹5,000 | 100 ₹2,500 Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
2 Jul 2026, 6:00 pmClosed
GE NAGROTA
GE NAGROTA
COMPREHENSIVE MAINT AND PERIODICAL SERVICES FOR STN HQ REASI AND MINOR UNITS AND REPAIR/REPLACENENT OF LT PANELS, CABLES, EARTHING POLES AND OVERHEAD CONDUCTOR OF SILA GRN UNDER AGE REASI OF GE NAGROTA
2026_MES_767649_1
CANO GEN/TOKEN-33/2026-2027
Open Tender
Civil Works
Item Rate
240 days
GE NAGROTA
Class D Category a(i) and b(i)
8 documents required · 8 mandatory
₹500
GE NAGROTA
₹1 L
Yes
16 Jul 2026
30 May 2026
7 Jul 2026
30 May 2026
2 Jul 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule A Part-I (B/R) Works
Demolition of brick work or stone/ boulder Masonry, built in cement mortar including all quoins, pillars etc complete all as specified and directed. | 7.5 | Cum | - | - |
| 2 | Material & Labour Brick work with sub class 'B' bricks built in CM 1:6 straight or curved on plan exc 6 m mean radious . and complete all as specified and directed. | 7.5 | Cum | - | - |
| 3Taking down cement plaster on brick or stone walls, etc., including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and directed. | |||||
| 4 | M & L for Rendering 15 mm thick on other than fair faces of walls of brick work or concrete surfaces in cement mortar 1:6 compound finished even and smooth without using extra cement complete all as specified and directed. | 380 | Sqm | - | - |
| 5 | M & L for Rendering 15 mm thick on fair faces of walls of brick work or concrete surfaces in cement mortar 1:4 with water proofing compound finished even and smooth without using extra cement complete all as specified and as directed.
Note:- (i) water proofing compound on only top layer of plaster (ie 5mm thick)
(ii) Qty of WPC shall be 200ml per cement bag or per manufacturer instructions
(iii) WPC shall be measured and paid separately) | 480 | Sqm | - | - |
| 6 | M & L for Supply only liquid water proofing compound complete all as specified and directed. | 15.6 | Litre | - | - |
| 7Material & Labour Preparation of newly plastered wall surfaces and applying two coats of distemper oil emulsion over one coat of birla white putty 3mm thick preparatory to distempering complete all as specified and directed. Note: The painting is to be done using smart painting tools and technique as mentioned in Particular specification. Tenderer shall take this aspect in consideration before quoting his rates and no claim on account of misunderstanding or any thing else shall be admissible/acceptable at any later stage | |||||
| 8Material & Labour for priming new surface of wall with alkal iresistant priming paint of and applying two coats of cement base paint complete all as specified and directed. Note: The painting is to be done using smart painting tools and technique as mentioned in Particular specification. Tenderer shall take this aspect in consideration before quoting his rates and no claim on account of misunderstanding or any thing else shall be admissible/acceptable at any later stage | |||||
| 9 | Taking down Chowkats or frames n. exceeding 1.5 Sqm each (Without taking off shutters from the frame) complete all as specified and directed. | 15 | Each | - | - |
| 10 | Taking down Chowkats or frames exceeding 1.5 Sqm but not exceeding 4.00 Sqm each (Without taking off shutters from the frame) complete all as specified and directed. | 25 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_860990.xls
BOQ • 1.56 MB
TENDER33.pdf
Tender Documents • 4.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .