Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 CrAccepted-Finance | ₹18.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹23.5 CrAccepted-Finance | ₹23.5 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹29.2 CrAccepted-Finance | ₹29.2 Cr | L3 | Accepted-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Firm did not submit the required documents as per tender |
Tender Value
Refer Docs
EMD Value
₹70 L
Closing Date
10 Jul 2023, 5:00 pmClosed
Gereral manager
Govt Opium and Alkaloid Works Neemuch
The Shutdown work on turnkey basis (Removal of old system and supply, Installation, testing and commissioning (S.I.T.C.) of new system ( AHU, Evaporator, Reactor, Tray Dryers, Vessels, pipelines and etc.) at GOAW, Neemuch, M.P.)
2023_DREV_757105_1
I(20)008/P/E/SD/2020
Open Tender
Machineries/ Mechanical Engg Items
90 days
Govt Opium and Alkaloid Works Neemuch
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹70 L
Yes
Govt Opium and Alkaloid Works Neemuch
3 Aug 2023
9 Jun 2023
12 Jul 2023
9 Jun 2023
10 Jul 2023
9 Jun 2023
20 Jun 2023
ITEM NAME :
Hydraulic & Ultrasonic test of steam jackets and Replacement of steam jackets
Replacement of vacuum Lines , header 6 inch As per Appendix-I
Replacement of chilled Waterlines As per Appendix-II
Replacement of cold waterlines As per Appendix-III
Tubular Level Gauges
Condenser tube replacement
Temperature controller & indicating system
S.S. Dosing Tank & it’s system
NUTCH & it’s connected piping & pumping System (Ex – 16, 380 liters, dedicated unit for Gums & Resins of Opium)
Centrifuge & it’s piping System
S.S. Tray dryers and it’s ducting system
S.S. Ribbon Blender
S.S. Tubular Sight Glass
Installation of FLP Temperature Indicators (Available in works)
S.S. 316 welding for Extractors
Cooling tower (New)
Chilling unit (New) for water
Unit for manufacturing of Synthetic Codiene
EX-2A, Chilling System
S.S. 316 Storage Tank
Acetic Acid Line
Un-used vessels
Unit of Evaporator; EV-3
Modification of tray dryer
Jacket for settler
Crystallizer for C.P.
Nutch and connecting piping system
Nutch for additional C.P.
500 lts. Alcohol distillation unit
Complete System as per GMP (AHU)
Excel Plants & Equipment Pvt. Ltd.
K M INFRA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid