Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.0 LAccepted-AOC WARD NO 5 TENGAPARA P O P S DIST KOKRAJHAR PIN 783370 | KOKRAJHAR | ASSAM | 783370 | ₹93.0 L | L1 | Accepted-AOC Work order Allotted |
| 2 | L1₹93.0 LRejected-Finance C O LT JOGENDRA BASUMATARY NAHARBARI MAZBAT P O P S MAZBAT DIST KAMRUP METRO ASSAM PIN 784507 | MAZBAT | KAMRUP METRO | ASSAM | 784507 | ₹93.0 L | L1 | Rejected-Finance Work order not Allotted |
| 3 | L1₹93.0 LRejected-Finance | ₹93.0 L | L1 | Rejected-Finance Work order not Allotted |
| 4 | L1₹93.0 LRejected-Finance | ₹93.0 L | L1 | Rejected-Finance Work order not Allotted |
| 5 | L2₹1.0 Cr+₹10.3 L (11.1%)Rejected-Finance TANGLA UDALGURI ASSAM | UDALGURI | ASSAM | 784113 | ₹1.0 Cr+₹10.3 L (11.1%) | L2 | Rejected-Finance Work order not Allotted |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
8 Mar 2023, 12:00 pmClosed
CHD, Irrigation, BTC
CHD, Irrigation, BTC, Kokrajhar
RCC Lining of Canal of Akaldonga FIS under PMKSY_HKKP for the year 2021-22
2023_BoTC_29365_28
CHDI/ ET/2022-23/10
Open Tender
Civil Works
Works
365 days
sukla
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,100
₹2.1 L
Yes
8 Aug 2023
17 Feb 2023
8 Mar 2023
17 Feb 2023
8 Mar 2023
18 Feb 2023
Amount
Construction of RCC Lining( For 600 m of canal length) Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing
(57-A-ii)Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)
(10) Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.)
(28) Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
(65) Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
(64-A-ii) Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.)
(67-ii)12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4
(23) Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Gautam Brahma
PRAFULLA KUMAR BASUMATARY
PURNESWAR NARZARY
Pabitra Boro
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .