| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹18.0 L+₹2.2 L (14.0%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer | |
| 3 | L3₹18.1 L+₹2.3 L (14.3%)Rejected-Finance | L3 | Rejected-Finance L3 Tenderer | |
| 4 | L4₹18.1 L+₹2.3 L (14.4%)Rejected-Finance | L4 | Rejected-Finance L4 Tenderer | |
| 5 | L5₹19.0 L+₹3.1 L (19.9%)Rejected-Finance | L5 | Rejected-Finance L5 Tenderer |
Tender Value
₹19.1 L
EMD Value
₹20,000
Closing Date
12 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Creating Clean and Green Villages 8 Works in Lathur Block in Chengalpattu District Having package No.36
2022_RDTN_238301_1
RC No 4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works - Buildings
Item Rate
90 days
Lathur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹20,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
5 Jul 2022
Amount
PART I: roviding fencing and water Supply fecilities to MTP Moringo site @ Cheyyur Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.4.57 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART II: roviding fencing and water Supply fecilities to MTP Moringo site @ Kadalur Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.2.83 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART III: roviding fencing and water Supply fecilities to MTP Moringo site @ Nedumaram Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.3.20 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART IV: roviding fencing and water Supply fecilities to MTP Moringo site @ Kodur Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.1.62 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART V: roviding fencing and water Supply fecilities to MTP Moringo site @ Nelvoypalayam Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.3.50 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART VI: roviding fencing and water Supply fecilities to MTP Moringo site @ Ammanur Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.1.42 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART VII: roviding fencing and water Supply fecilities to MTP Moringo site @ Thattambattu Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.1.00 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
PART VIII: roviding fencing and water Supply fecilities to MTP Moringo site @ Thattambattu Panchayat in Lathur Panchayat Union. Estimate Amount : Rs.1.00 Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cost and Supply of RCC Fencing Post including Cost and conveyance of all labour charges etc Complete.
Barbed Wire - 10 Gauge - Two ply and four pronged including Cost and conveyance of all labour charges etc Complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.SRIRAMULU
V.DHEENATHAYALAN
S.RADHAKRISHNAN
M/s.SHANMUGAVEL CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .