Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹31.8 L Quoted ₹32.3 L | L1 | Accepted-AOC Quoted rate are reasonable |
| 2 | L2₹41.7 LRejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | ₹41.7 L | L2 | Rejected-Finance Greater Than L1 |
| 3 | L3₹42.8 LRejected-Finance COLABA MUMBAI | ₹42.8 L | L3 | Rejected-Finance Greater Than L1 |
| Sl No | Description | Qty | Unit | Escon Elevators Pvt Ltd L2 | Monarch Enterprises L3 | shakti engineering and electrical works L1 |
|---|---|---|---|---|---|---|
| 1.00 | Providing services for operation of electrically operated lift having capacity of 1360 Kg / 20 passenger with three shift per day with one lift attendent(LIFT OPERATOR) each shift of 08 hrs for three shifts (from 0600 to 1400 hrs, 1400 to 2200 hrs and 2200 to 0600 hrs) (including Sunday's & Holiday's) . Location - Kasturi Hospital. (Total =03 operator/Day)
(a) The lift operator shall adhere to the following points while carrying out his duties :-
(i) Keep the lift car neat & clean.
(ii) Check stoppage of lift at all the floors.
(iii) Ensure functioning of emergency alarm system
(iv) Guarding/security of lift & its allied items.
(v) Look after & care all items of the lift.
(vi) Keep a complaint register which shall be made available for endorsement of complaint if any by users
(vii) Report to the Engr-in-Charge of any abnormality in working of lift. (vii) Due to supply distrubtion/cutoff ,DG operating and change over at sub stn kasturi for street light operating responsibility of the operator. | 11 | Per month | 82,100 ₹9.0 L | 83,226 ₹9.2 L | 62,700 ₹6.9 L |
| 1.10Note for item No 1 :- Rates quoted by the contractor shall be inclusive for the following items :- (a) Contractor shall provide two set of uniform, shoe with name plate, Etc (b)The log sheets will be maintained by the contractor in each installations contractor shall provide log book, Attendance register , plant running record book , and rate quotated by the contractor shall deemed to be included this quotated rate. (c) The site documents such as Log sheet, Attendance etc will be checked daily by JE, Weekly by Engineer in charge & Monthly by GE. (d) All installation and machinery equipement and other items belonging to the E&M installtion including safety shall be responseiblity of manpower employed by the contractor.(e) minor stores required shoulded be provided by the contractor.(f) Major stores required for rectification of complaints will be supplied by contractor as per schedule part- A items. (g) Any fault on cable line or Lift system will be resloved by contractor emergency basis at day or Night in presence of E-in charge otherwise action will be taken agianst contractor by department and If contractor is not given any response within one hours of any fault then department will be applied Rs 5000.00 charges every per hours after not response by the contractor. | ||||||
| 1.20Note for item No 1 Cont. (h) Contractor shall provide the all type of T & P,vehicle,ladder,grass cutting machine and safety items such as electric proof shooes and hand gloves,body harnese/safety belt to technecian for attending & rectification fault complaints. (j) The contractor will be responsible for up keep the Lift in neat and tidy condition and in a presentable manner . The surrounding of the DG set area with grass/tree cutting as routing basis will also be maintained neat and clean grasseegation. The quoted rates shall include the up keep of surrounding area the installation out side periphery up to 06 mtr/ installations grass/ shurb cutting & plantation of seassonal flowers to an area of entire installations and in case the contractor fails to upkeep the the installations , He shall be liable to penalty @ Rs 500 per day for not up keep of the installations.(k) The rate quoted for items of outsourcing shall not be less than minimum wages as notified by Government of India/ Concerner state /Local body , which ever is higher also not less than applicable rates for contribution of employee towards Employees provident Fund (EPF), contribution towards Employees state Insurances corporation (ESIC), contribution of bonus and labour welfare cess (LWC) under respective headings/sub-items. | ||||||
| 2.00 | Comprehensive, preventive and periodical maintance of 01 No . electrically operator/technecian Olumps make strecher cum passenger lifts of capacity 1360 Kgs carrying 20 passengers suitable for serving G+2 floors (total 3 landings) with electric power opearted doors, auto electric levelling device complete with ARD facility installed at INHS Kasturi to be maintained round the clock as described here-in after in reliable, safe and efficient operating condition by regularly examine lubricating and adjust the mechanical and electrical driving equipment governer, sleeve shaft assembly bearing / contacts & governor jaws,limit switches (car & hall mechanical buttons, car & hall position indicators, car direction indicators and all other car and landing signal fixtures, deflectors, car and counter weight guide rails and buffers, equipment and carry out planned maintenance in a systematic and controlled manner using techniques and expertise consultancy including replacement of spares parts as and when required all as directed and specified to the entire satisfaction of Enginee-in-Charge.Note- Vintage of Lift 19 April 2001 | 11 | Per month | 32,166 ₹3.5 L | 32,605 ₹3.6 L | 24,856 ₹2.7 L |
| 2.10Note for item No 2 (i) The tenderer shall have to replace the u/s materials with OEM materials only. (ii) The comprehensive maintenance include weekly, fortnightly, monthly, quarterly, half yearly, inspection/testing/ preventive maintenance replacement of un serviceable parts/material including labour, transportation. (iii) The complaints shall be attended forthwith as the complaint/ failure from the time of receipt of same. Rate quoted shall be inclusive of T & P required for carrying out repairs, stationery for maintenance of record, uniform to mechanic & helper etc is deemed to be included in the rates quoted. Contractor must maintain, maintenance register for the work carried out and the same will be checked by the Engr-in-Charge at the time to make any payment. (iv) Contactor shall rectify the defects with in 24 hours after receipt of complaints, otherwise the complaint will be rectified by the other agency and the expenditure incurred will be recovered from the contractors dues. The penalty for not attending the complaints shall be recovered at Rs. 5000/- per day till proper functioning of lift. (v) Old material will be submitted to AGE E/M Store yard by the contractor. | ||||||
| 2.20Note for Item No 2 Cont. (vi) A complaint register will be maintained by contractor and the contractor will obtain the complaint from JE/AGE (E/M) office on every working day at 0800 hrs or inform by telephonically by Dept any time . After attending the complaint contractor will obtain the signature from rep of User/ AGE/GE every day as a token of complaint attended. (vii) The Schedule A consists of comprehensive maintenace of lifts at INHS Shivaji. (viii) Lift mechanic shall be well experienced in lift / elevators repair and maintenance. (ix). Contractors shall carryout weekly, fortnightly, monthly quarterly, half yearly inspection and submit the same to Engineer-in-charge without fail. (xi) All spares shall be deemed to be included in quoted rate. (xi) The contractor shall ensure proper functioning of safety devices. (xii) Contractor Shall provide the mobile Number and two eamil IDs for regular communication and intimation of complaints /defects officialy. | ||||||
| 2.30Note for Item No 2 Cont. Following checking are deemed to be included in the rates quoted by the contractor under comprehensive and maintenance and to repair if found defective/Unserviceable. (a) CAR CABIN : (I) Repairs/replacement of acrylic roof cover,car panel,floor indicator,fan,light fitting (ii) Contractor is responsible for maintaining the car cabin neat and clean. Necessary cleaning to car cabin shall be done by the contractor on daily basis (b) CONTROLLER : (i) Checking fuses of controller and mains, replace if any found defective. (iii) Checking the conditon of breake/breake drum , brake coil and replacement if required. (iv) Checking flexible leads to relays to make them serviceable. (iv) Checking flexible leads to relays to make them serviceable. (c) AC Motor : (I) Lubricate bearings with suitable lubricants. (ii) Clean ventilation passages on weekly basis. (iii) Carryout the insulation test and continuity test of motor on quarterly basis and make them in satisfactory condition. (iv) Checking the alignment of motor shaft and realigment of shaft (d) Governor : (I) Lubricate bearing on weekly basis with suitable lubricants. (ii) Checking that the levers work smoothly (iii) hecking that electrical contact opens before rope get locked | ||||||
| 2.40Note for Item No 2 Cont. (e) Ropes : (I) Checking the condition of hoist and governor ropes (ii) Lubricate rope in case of non self lubricating ropes on weekly basis. (iii) Checking the dia of rope and record in maintenance book on quarterly basis for its proper functioning. (f) Hoist Way : (I) Lubricate guides and guide shoes on weekly basis with suitbale lubricants. (ii) Checking that the bufffers are in proper, position and measure and record counter weight buffer clearance with car at the top (iii) Checking the rope fastening at the car and counter weight (iv) Checking guide clamps and adjusted (v) Checking to upper and lower limit switches for proper connection after physical inspection get the lift to over travel by holding from the controller and see that the switches operate properly (vi) Checking condition of travelling cables and termination at junction boxes. (g) Machine Room : (I) Checking and adjusting of overload relay and phase failure relay (ii) Checking power wiring termination in switch motor controller and power switching relays (iii) Checking/ lubrication of all equipment on weekly basis (v) Cleaning the relay contacts, replacement of contact. | ||||||
| 2.50Note for Item No 2 Cont. (h) Gear Box : (I) Inspect for stray noises . (ii) Checking axial play of work shaft . (iii) Lubricate bearing and top up oil in gear box when its required. (j) Brakes : (I) Cleaning of oil surface and trace source of oil leakage and rectify the leakage problems. (ii) Adjust clearance between shoes and drum on monthly basis (k) Retiring Car and Locks : (I) Checking operation of car and lock from the top at each landing checking that retiring car solenoid is not getting a over heated and that movement of car is smooth. (ii) Checking that all locks are functioning properly, mechanically and electrically after opening the covers, checking all set screws and springs and replace if necessary. The lever should lock the brake properly. (iii) Checking that the retiring car does not touch the lock roller at the landing which is being passed .(iv) Checking the door closer safety, clean and adjust if necessary . (v) Checking the car gear switch operates properly . (vi) Lubricate top track and door motor and linkage. (vii) Checking the landing door and can be operated by emergency keys . (viii) Repair/replacement of retiring car solenoid locks doors closer safety switch . | ||||||
| 2.60Note for Item No 2 Cont. (l) General ; (I) Checking the car frame for bends or cracks and correct if required. (ii) Checking and carrying out insulation resistance test half yearly basis for the follwing :- (a) All power circuit cables and incoming cables. (b ) Switch and feed upto controller (c) Between different power relays. (d) Power card in the traveling cables (e) Motor (iii) Checking operation of the car over speed safety gear by moving the levers manually landing so that the safety locks up properly. (iv) Checking that sheaves are tight on the shaft also checking with hammer sounding for cracks, check sheave bearing clean and re-lubricate. Adjust for proper axial play. (v) Unload car (s) checking the worn gear lash and adjust by removal of sheaves as required. (vi) Checking of motor bearing, clean and lubricant (vii) Checking that the gear coupling belts are tight (viii) Checking oil seals of gear box and fill fresh oil (ix) Contractor is responsible for maintenance of lift well/pit/shaft/machine room indry and clean condition at all times. Any entry of water needs to be pumped out immediately and rates quoted is inclusive of necessary pumping arrangement .A pump should be kept in store at all time to meet the emergency No extra payment will be done in this account. Failing which Rs 10000/- recovered as penality per failure due to above reason. (xx) Contractor has to carry out annual testing of the lift by lift Inspector of State.All arrangements and cost fees for Inspection of lift are deemed to be included in quoted rates. | ||||||
Tender Value
₹38.0 L
EMD Value
₹76,000
Closing Date
15 Sept 2025, 6:00 pmClosed
Gaurav Tiwari, IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
MANNING AND OPERATION FOR LIFT AND COMPREHENSIVE MAINTANANCE OF ELECTRICALLY OPERATED LIFTS AT INHS KASTURI AND MAINTENANCE OF CRANES AT INS SHIVAJI LONAVLA and REP MAINT OF MOTORISE SHUTTER AT OTM BLDG AT INS SHIVAJI LONAVLA
2025_MES_714694_2
GE/LONAVLA/8317/E8
Open Tender
Civil Works
225 days
GE (I) (NAVY) LONAVLA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE (I) (NAVY) LONAVLA
₹76,000
Yes
17 Jan 2026
12 Aug 2025
17 Sept 2025
12 Aug 2025
15 Sept 2025
27 Aug 2025
12 Aug 2025 - 26 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid