| 1 | 1₹64.7 LAccepted-AOC C BLOCK 4G YUGA KALPATARU NO 18 PILLAYAR KOIL STREET PADIKUPPAM ROAD KOYAMBEDU CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | ₹64.7 L | 1 | Accepted-AOC Tender Coated as per Estimated Amount |
| 2 | 2₹68.0 LRejected-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹68.0 L | 2 | Rejected-Finance Tender Coated above Estimated Amount |
| Sl No | Description | Qty | Unit | V MEENAL AND CO L2 | SRI SELLIAMMAN AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing bituminous road surface and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 2,778.6 | Sqm | 24.5 ₹68,075.70 | 23 ₹63,907.80 |
| 2.00 | Providing, Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage fo mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 of MORT & H specifications for Patches. | 694.65 | cum | 2,514.2 ₹17.5 L | 2,394 ₹16.6 L |
| 3.00 | Providing and applying prime coat over WMM surface 7 Kg of bitumen Emulsion (SS - II)per 10 sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the requried quanity of bitumen as tack | 4,631 | Sqm | 87.5 ₹4.1 L | 83 ₹3.8 L |
| 4.00 | Providing and laying 50mm compacted thickness bituminous macadem using 0.42Cum of 26.5-11.2mm metal and 0.10cum of 11.2-2.80mm metal and 0.18cum of 2.80mm metal and below with 38Kgs of bitumen for premixing 10 sqm including cost and conveyance of all mate | 231.55 | cum | 9,182 ₹21.3 L | 8,745 ₹20.2 L |
| 5.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 115.78 | cum | 11,842 ₹13.7 L | 11,279 ₹13.1 L |
| 6.00 | Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete | 50.52 | cum | 897 ₹45,316.44 | 854 ₹43,144.08 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% | 1 | GST Amount | 10,37,205.46 ₹10.4 L | 9,87,336.78 ₹9.9 L |
Tender Value
₹65.3 L
EMD Value
₹66,000
Closing Date
28 Jan 2026, 3:00 pmClosed
The Block Development officer (VP)
St Thomas Mount Panchayat union Office
Providing BT Road to Pozhichalur Bus Stand to Pammal Signal Office via Dr.Radha Krishnan Road in Pozhichalur Panchayat at Punithathomaiyar Malai Panchayat Union. 14th CFC VP Fund Estimate Amount Rs 65.35 Lakhs
2026_RDTN_646688_1
0019/2026/B2, dt. 14.01.2026,
Open Tender
Civil Works - Roads
120 days
POZHICHALUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹66,000
Yes
19 Feb 2026
24 Jan 2026
28 Jan 2026
24 Jan 2026
28 Jan 2026
24 Jan 2026
Picking the existing bituminous road surface and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Providing, Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage fo mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 of MORT & H specifications for Patches.
Providing and applying prime coat over WMM surface 7 Kg of bitumen Emulsion (SS - II)per 10 sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the requried quanity of bitumen as tack
Providing and laying 50mm compacted thickness bituminous macadem using 0.42Cum of 26.5-11.2mm metal and 0.10cum of 11.2-2.80mm metal and 0.18cum of 2.80mm metal and below with 38Kgs of bitumen for premixing 10 sqm including cost and conveyance of all mate
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_775178.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TENDER.pdf
Tender Documents • 0.54 MB
BOQ_775178.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid