| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Finance | -0.02% | ₹19.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.7 LAdmitted-Finance | +6.58% | ₹20.7 L | L2 | Admitted-Finance |
| 3 | L3₹21.3 LAdmitted-Finance | +9.85% | ₹21.3 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not As per nit |
Tender Value
₹19.4 L
EMD Value
₹24,300
Closing Date
6 Apr 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Heightening of RCC boundary wall from NE yard gate to north side corner under ROCP.
2026_ECL_357649_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/818 Dt-27.03.2026
Open Tender
Civil Works - Others
30 days
Rajmahal OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹24,300
11 May 2026
27 Mar 2026
8 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
27 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 2Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | |||||
| 3Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 4Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | |||||
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | |||||
| 612 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | |||||
| 7Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) | |||||
| 8Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_370510.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid