Tender Value
₹55.7 L
EMD Value
₹1.1 L
Closing Date
6 Aug 2026, 4:00 pmClosed
Executive Engineer R and B Division Khaltsi
Office of the Executive Engineer R and B Division Khaltsi
Upgradation of Link Road to Achinathang Gongma with BT. Under District Plan
2025_PWD_17571_6
42 of R and B Khaltsi of 2025-26
Open Tender
Civil Works - Roads
Percentage
60 days
Khaltsi
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Executive Engineer R and B Division Khaltsi
₹1.1 L
25 Aug 2026
27 Jul 2026
8 Aug 2026
27 Jul 2026
6 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 76.45 | Cum | 445.86 | ₹34,086 |
| 2 | Dumping stone including cost of stones in Horizontal on level (Including Plum) | 40.28 | Cum | 953.03 | ₹38,388.05 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.25 | Cum | 5,725.33 | ₹58,684.63 |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 coarses and : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.63 | Cum | 5,730.39 | ₹15,070.93 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.35 | Cum | 6,606.08 | ₹2,26,918.85 |
| 6 | Random rubble masonry with hard stone laid dry in foundation, plinth & walls
Laid without bond stone | 150.75 | Cum | 4,010.9 | ₹6,04,643.18 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : Walls (anythickness) including attached pilasters, butteresses, plinth and string courses etc. | 186.3 | Sqm | 635.45 | ₹1,18,384.34 |
| 8 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 156 | Sqm | 486.19 | ₹75,845.64 |
| 9 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including
collars/spi got jointed withstiff mixture of cement mortar in the proportion of 1:2
(1 cement : 2 fine sand) including testing of joints etc. Complete 600 mm dia. R.C.C. pipes. Including cost of pipe and carriage upto site complete Job | 12 | Mtr | 7,864.41 | ₹94,372.92 |
| 10 | Carriage of material from source to site of work by Mechnical Transport including loading unloading and stacking. a) Cement an avg lead 40Km | 12.01 | MT | 502.74 | ₹6,037.91 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_45805.xls
BOQ • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .