As per NIT
Engineering, Supply, Erection, Testing and Commissioning of 2x100 MVA, 220/33KV, 220kV GIS and 33kV AIS, GSS at Pahala along with 220 KV T/L from existing 220/132/33KV GIS at Balianta and construction of 02 numbers of Bay extension at Balianta GIS on Turnkey contract basis.
CPC-34/2026-27::1
CPC-34/2026-27
Open Tender
Works
CPC, Bhubaneshwar
₹29,500
₹2.8 Cr
3 Jun 2026
3 Jun 2026
31 Aug 2026
4 Jun 2026
31 Aug 2026
Checklist for Bid Submission
1 Certificate regarding Certificate of Incorporation To be submitted in case company To be submitted in Soft Copy.
2 Soft copy of Attachments & Bid Form Duly Filled Excel Sheet of Attachment and Bid Form to be uploaded in Soft Copy along with Bid. To be submitted in Soft Copy.
3 Power of Attorney (POA) Duly notarized (on Stamp Paper of requisite value), indicating that the person(s) signing the bid has(ve) the authority to sign the bid. In case of bid submitted by a Joint Venture two (lead + other) partners, if allowed as per stipulated Qualification Requirements in Annexure-A (BDS), bidder shall submit. Power of Attorney for Joint Venture and Joint Venture Agreement as per given format Submission of Hard copy in ‘Original’and uploading of Scanned Copy
4 Bid Security The bid security shall, at the bidder’s option, be in the form of a crossed bank draft in favour of OPTCL or a bank guarantee from a reputed bank selected by the bidder. Alternatively, same can be submitted as online payment through OPTCL ONLINE PAYMENT “www.tenderwizard.com/OPTCL”, a link of which is provided on the. The copy of ‘Online Payment Acknowledgement – Suppliers’ generated subsequent to the payment shall be submitted along with hard copy part of the bid. The format of the bank guarantee shall be in accordance with the form of bid security included in the Bidding Documents. Bid security shall be valid upto 240 days from the date of Bid Opening. The Bid Security shall be in favour of Odisha Power Transmission Corporation Limited payable at Bhubaneswar. Submission of Hard copy and uploading of Scanned Copy
5 Bidding Document Fee Bid document cost for amount as specified in BDS- Hard copy of document related to online payment of bid document cost as indicated in BDS . Copy of the payment proof may be uploaded online on the portal. Submission of Hard copy and uploading of Scanned Copy
6 Tender Processing Fee Tender Processing Fee for amount as specified in BDS- Hard copy of document related to online payment of Tender Processing Feeas indicated in BDS. Copy of the payment proof may be uploaded online on the portal. Submission of Hard copy and uploading of Scanned Copy
7 Attachment-8: Manufacturers Authorization Form (if applicable) To be submitted on Company's Letterhead. Signed and stamped with company seal by a full time Director/ CEO/ Chairman-cum-Managing Director. Submission of Hard copy and uploading of Scanned Copy
8 Attachment-14: Integrity Pact To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
9 Attachment-18: Safety Pact To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
10 Attachment 20: Declaration of Key Managerial Person jointly with Power of Attorney holder Signed by CEO/Managing Director/Company Secretary/ Director/ CFO/ any of the partner in case of partnership firm/ any other officer entrusted with substantial powers of the management of the affairs of the company/firm and POA Holder To be submitted in Soft Copy.
11 Attachment 23: Compliance to the process of E-Reverse Auction. On Company's Letterhead To be submitted in Soft Copy.
12 Attachment-24: Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1. (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture) On Company's Letterhead To be submitted in Soft Copy.
15 Attachment-27: Certification by the Bidder as per order no. F.No.6/18/2019-PPD dated 23/07/2020 issued by Public Procurement Division, Department of Expenditure, Ministry of Finance, Government of India (DoE Order) in line with ITB 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture) Company's Letterhead To be submitted in Soft Copy.
16 Attachment 28: Power of Attorney by Joint Venture partners To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
17 Attachment 29: Joint Deed of Undertaking by Joint Venture partners To be submitted on a non-judicial stamp paper of Rs. 100/-. (in two originals, Signed on each page by Power of Attorney Holder and duly witnessed) Submission of Hard copy in ‘Original’ and uploading of Scanned Copy
18 Documents for Qualifying Requirement (QR) In support of meeting the qualifying requirements (QR) such as copy of letter of award/ work order, completion certificate, copy of audited balance sheet for five years etc., shall be uploaded by the bidder along on the portal as part of technical bid To be submitted in Soft Copy.
NOTE: This checklist is not exhaustive and issued for the purpose of reference Only. In case of any ambiguity, the provisions of Bidding Documents shall prevail.
Annexure-II to Section-V (SCC)
The successful Bidder is required to furnish data towards Latitude, Longitude, Altitude and Photos of the Towers of Transmission Line , UG cable deatils/ Feeders / Substation as per the following Formats prior to handing over of the project to OPTCL, for updation of same in GIS Application of OPTCL. This will be treated as an integral part of the project hand over process.
SPECIFICATION NO.:SGM-CPC- e-Tender-Pahala-34/2026-27.
“Engineering, Supply, Erection, Testing & Commissioning of 2x100 MVA, 220/33KV GIS at Pahala along with 220 KV T/L (Total Line Length=9.94 RKms approximately) from existing 220/132/33KV GIS at Balianta and const. of 02 nos. of Bay extension at Balianta GIS on Turnkey contract basis.
Template-1 data sheet for tower details (Transpose the rows into columns before data entry)
Template-2 data sheet for Feeder Details (Transpose the rows into columns before data entry)
Template-3 data Sheet for Sub Station Details (Transpose the rows into columns before data entry)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
detail.html
html • 0.07 MB
TenderNotice34.pdf
pdf • 0.07 MB
Volume-I_00- Bidding Document for bid_OPTCL_34_2026-27.docx
docx • 0.76 MB
Volume-I_01- IFB_Invitation for Bid_OPTCL_34_2026-27.docx
docx • 0.10 MB
Volume-I_02 Section - II ITB -Instruction to Bidder_OPTCL_34_2026-27.docx
docx • 0.14 MB
Volume-I_03- Section-III-BDS _Bid data Sheet_OPTCL_34_2026-27.docx
docx • 0.08 MB
Volume-I_04-Annexure-A (BDS)_Qualification of bidder_OPTCL_34_2026-27.docx
docx • 0.09 MB
Volume-I_05-Annexure-B to BDS_e-Reverse auction_OPTCL_34_2026-27.docx
docx • 0.06 MB
Volume-I_06-Annexure-C to BDS_Sample format for e-Reverse auction_OPTCL_34_2026-27.doc
doc • 0.04 MB
Volume-I_07-Section - IV GCC -General Condition of Contract_OPTCL_34_2026-27.docx
docx • 0.24 MB
Volume-I_08- Section-V-SCC -Special Condition of Contract_OPTCL_34_2026-27.docx
docx • 0.06 MB
Volume-I_09- Annexure-I to Section-V (SCC)_List of Name of Nationilised and Private Bank_OPTCL_34_2026-27.docx
docx • 0.02 MB
Volume-I_10- Appendix-I to Section-V (SCC)-Environmental Management Plan_OPTCL_34_2026-27.doc
doc • 0.74 MB
Volume-I_11-Section - VI -Forms and Procedures incl Terms of payment_OPTCL_34_2026-27.docx
docx • 0.35 MB
Volume-I_12-General Information to bidder-Clauses for Bid Outright rejection_34_2026-27.docx
docx • 0.02 MB
Volume-I_13-Vol-III_10-Checklist_OPTCL_34_2026-27.xlsx
xlsx • 0.01 MB
Volume-I_15- Annexure-II to Section-V(SCC)-GIS Application data_34_2026-27.xlsx
xlsx • 0.01 MB
SCOPEOFWORKFOR_SS34202627.pdf
pdf • 0.79 MB
ScopeofworkforTransmissionLine_34202627.pdf
pdf • 0.57 MB
E6- CIVIL WORKS.pdf
pdf • 3.29 MB
E0-COVER PAGE & CONTENTS.pdf
pdf • 0.22 MB
E1-GENERAL CLAUSE.pdf
pdf • 0.65 MB
E2-GENERAL TECH. CLAUSE.pdf
pdf • 1.07 MB
E3-SYSTEM DATA - R1-13.02.2026.pdf
pdf • 0.61 MB
E4-METEROLOGICAL DATA.pdf
pdf • 0.39 MB
E5-DESIGN OF SUBSTATION .pdf
pdf • 0.69 MB
E12-CURRENT TRANSFORMER-R 2.1-30.03.2026 SIGNED.pdf
pdf • 1.51 MB
E7-SWITCH YARD STRUCTURE.pdf
pdf • 0.54 MB
E8-DRG,TEST CERT,O&M MANUALS.pdf
pdf • 0.56 MB
E9-ELECT EQUIP INST & COMMISSIONING.pdf
pdf • 0.52 MB
E10-GENERAL EQPMT & SUBSTATION ACCESSORIES .pdf
pdf • 1.05 MB
E11-CIRCUIT BREAKERS-13.02.2026 SIGNED.pdf
pdf • 1.43 MB
E14-STATION TRANSFORMER.pdf
pdf • 0.62 MB
E15-EHV SURGE ARRESTER TS R2 -13.02.26 signed.pdf
pdf • 1.25 MB
E16-A-IVT TS REV-03-13.02.26 signed.pdf
pdf • 1.07 MB
E16-B-CVT TS REV-3-13.02.2026 signed.pdf
pdf • 1.04 MB
E13-ISOLATORS R2 13.02.2026 signed-1.pdf
pdf • 0.78 MB
E18- 48V VRLA Battery and SMPS Charger.pdf
pdf • 1.81 MB
E19-DISTRIBUTION BOARD-R-2 (27.05.26).pdf
pdf • 1.77 MB
E17-A-VRLA BATTERY TS REV-0-13.02. 26 signed.pdf
pdf • 0.82 MB
E17-B-BATTERY CHARGER TS R1-13.02.26 signed.pdf
pdf • 0.99 MB
E20-B-HARDWARE FITTINGS, CLAPMS_CONNECTORS.pdf
pdf • 2.17 MB
E22-AIR CONDITIONER.pdf
pdf • 0.39 MB
E20-A-CONDUCTOR- R2-30.03.2026 SIGNED.pdf
pdf • 1.68 MB
E-25 TESTING Eqipments.pdf
pdf • 1.78 MB
E23-CONTROL, POWERL CABLES- R1-13.02.2026 signed.pdf
pdf • 2.59 MB
E24-SUBSTATION LIGHTING.pdf
pdf • 0.93 MB
E26-A-TRANSMISSION LINE.pdf
pdf • 1.22 MB
E26-B-TOWER DESIGN.pdf
pdf • 0.92 MB
E27-OPGW & OPTIC FIBRE EQUIPMENT.pdf
pdf • 1.67 MB
E28-A-DIESEL GENERATOR-82.5KVA_160KVA.pdf
pdf • 0.16 MB
E28-B-DIESEL GENERATOR-250KVA_500KVA.pdf
pdf • 1.01 MB
E30-GAS INSULATED SWITCHGEAR- R1 - 13.02.2026 SIGNED.pdf
pdf • 2.41 MB
E31-TS-33 -132-220 KV XLPE CABLE.pdf
pdf • 1.51 MB
E29-FIRE FIGHTING SPEC-Final.pdf
pdf • 1.57 MB
E33-C-SOLID CORE POST INSULATORS- R1-13.02.2026 signed.pdf
pdf • 0.84 MB
E33-D-PORCELAIN LONG ROD INSULATOR_R1 s.pdf
pdf • 1.51 MB
E32- DPLC & RTU.pdf
pdf • 0.53 MB
E33-A-DISC INSULATORS.pdf
pdf • 1.13 MB
E33-B-COMPOSITE LONGROD INSULATORS.pdf
pdf • 1.42 MB
E37-SAS & CR PANEL TS - R4 - 23.06.2026.pdf
pdf • 2.00 MB
E38-TRANSFORMER TS UP TO 400KV.pdf
pdf • 2.70 MB
E35-TS Fiber Optic Terminal Equipment FOTE.pdf
pdf • 1.04 MB
E43-HTLS CONDUCTORS-3A.pdf
pdf • 0.91 MB
E39-REACTORS.pdf
pdf • 2.01 MB
E40-765KV TRANSFORMER.pdf
pdf • 2.09 MB
E41-TESTING INSTRUMENTS, T & P, OFFICE FURNITURE.pdf
pdf • 0.15 MB
FormatofInsuranceSuretyBondforEMD.pdf
pdf • 0.65 MB
CorrigendumNo5_TimeExtn.pdf
pdf • 0.16 MB
CorrigendumNo4_TimeExtn.pdf
pdf • 0.16 MB
AddendumNo3_Insurancebondformat.pdf
pdf • 0.16 MB
AddendumNo2_Volume_I_Replaced1.pdf
pdf • 0.16 MB
AddendumNo2_Volume_I_Replaced.pdf
pdf • 0.16 MB
CorrigendumNo3_TimeExtn.pdf
pdf • 0.16 MB
AddendumNo1Documentupload.pdf
pdf • 0.16 MB
AddendumNo1_Documentupload.pdf
pdf • 0.16 MB
CorrigendumNo2_TimeExtn.pdf
pdf • 0.16 MB
CorrigendumNo1_TimeExtn.pdf
pdf • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].