Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹474.36 (0.11%)Rejected-AOC | ₹4.2 L+₹474.36 (0.11%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | PALANISAMY GIRIVEL L2 | svasit Engineers L1 |
|---|---|---|---|---|---|
| 1.00 | Removal and Relaying of RCC Cover Slabs the existing drain including all labours etc., complete | 2.5 | m2 | 520 ₹1,300 | 512 ₹1,280 Lowest |
| 2.00 | Desilting the existing drain including all labours etc., complete | 11.99 | m3 | 100 ₹1,199.5 | 97 ₹1,163.51 Lowest |
| 3.00 | Dismantling the existing damaged PCC drain wall including all labours etc., complete | 8.5 | m3 | 490 ₹4,166.47 | 486 ₹4,132.46 Lowest |
| 4.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 84 | m3 | 125 ₹10,500.25 | 123 ₹10,332.25 Lowest |
| 5.00 | Plain Cement concrete 1:4:8 mix (one cement, four sand, eight metal) using 40mm size Hard Broken stone etc complete | 13.2 | m3 | 5,310 ₹70,065.45 | 5,306 ₹70,012.67 Lowest |
| 6.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29m high for plane surfaces for drain, culverts etc., using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.5cm spaced at about 90cm centre to centre and supported by Casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete as directed. | 280 | m2 | 270 ₹75,600 Lowest | 270 ₹75,600 Lowest |
| 7.00 | Plain concrete 1:3:6 (one cement, two sand and four aggregate) using 20mm ISS HBG metal including cost and conveyance of all material to work site and labor charges for mixing,laying,compacting and curing etc, complete as per ss | 37.3 | m3 | 6,010 ₹2,24,173 Lowest | 6,010 ₹2,24,173 Lowest |
| 8.00 | Plastering in Cement Mortar 1:5 Mix With 12mm Thick | 70 | m2 | 271 ₹18,970 Lowest | 271 ₹18,970 Lowest |
| 9.00 | Conveying the excavated earth, silt, brickwork, RR masonry etc from the site to 15km distance including loading and unloading etc complete | 83.6 | m3 | 165 ₹13,794 | 163 ₹13,626.8 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
8 Jan 2025, 3:00 pmClosed
Assistant commissioner, west zone
west zone, coimbatore corporation
Reconstruction of Storm water Drain at VOC Street Eastern side N to S in ward no 45 of West Zone.
2024_MAWS_515431_31
E6/WESTZONE/2024
Open Tender
Civil Works
Works
90 days
west zone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
18 May 2026
2 Jan 2025
9 Jan 2025
2 Jan 2025
8 Jan 2025
2 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_614018.xls
BOQ • 0.32 MB
SWD.pdf
Tender Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .