Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | -24.60% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹5,999.98 (2.65%)Admitted-Fee/PreQual/Technical/Finance JAMMU JAMMU AND KASHMIR | JAMMU | JAMMU AND KASHMIR | 180001 | -22.60% | ₹2.3 L+₹5,999.98 (2.65%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹26,399.92 (11.7%)Admitted-Fee/PreQual/Technical/Finance | -15.80% | ₹2.5 L+₹26,399.92 (11.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.5 L+₹27,797.91 (12.3%)Admitted-Fee/PreQual/Technical/Finance | -15.33% | ₹2.5 L+₹27,797.91 (12.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹9,000
Closing Date
11 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O CSC NEAR MASJID SHARIF CHINAR COLONY AT MEHMOODABAD A BLOCK SHAHABAD
2026_RDPR_323318_53
ENIT104of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹9,000
14 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | e/w in excavation in foundation by manual means in trenches for foundation (not exceeding 1.5m in width), depth upto 1.5m inc. disposal of excavated earth upto 1m from cutting edge all kinds of soil. | 18.33 | cum | 479 | ₹8,780.07 |
| 2 | providing and laying of dry stome solling/rbm inc. all carriages | 4.06 | cum | 1,024 | ₹4,157.44 |
| 3 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M7.5 mix. (1:4:8) using 40mm NSA | 1.07 | Cum | 5,202.9 | ₹5,567.1 |
| 4 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) all work upto plinth level | 3.39 | Cum | 5,733.6 | ₹19,436.9 |
| 5 | brickwork with common burnt clay fps(non modular) bricks of class designation 75 in foundation and plinth in CM (1:6) inc. all carriages complete job. | 6.76 | cum | 7,571.55 | ₹51,183.68 |
| 6 | extra for brick work above plinth level upto floor v level | 5.13 | cum | 1,455.65 | ₹7,467.48 |
| 7 | rcc work in beams, suspended floors,roofs having slope upto 15 degree landings,balconies,shelves,chajjas,lintels,bands,plain window sills,stair cases and spiral stair cases upto five level inc. curing but excluding the cost of centering and shuttering finishing and reinforcement with (1:2:4) m15 mix and 20 mm nominal size aggregates | 1.85 | cum | 9,821.85 | ₹18,170.42 |
| 8 | reinforcement for rcc work inc. straightening,cutting,bending,placing in position and binding all complete.tmt bars | 185 | kgs | 115.3 | ₹21,330.5 |
| 9 | cenetering and shuttering inc. propping etc and removal of formwork for roof, slab inside,slab,steps offset,septic tank,soakage pit. | 13.7 | sqm | 718.2 | ₹9,839.34 |
| 10 | long,short walls and steps | 20.25 | sqm | 286.35 | ₹5,798.59 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1089063.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .