Loading…
Loading…
Tender Value
₹19.5 L
EMD Value
₹33,000
Closing Date
27 Jul 2026, 12:00 pmDue tomorrow
Executive Officer
N P Dibiyapur
Construction Work of Foot Overbridge in ward Ramkrishn Nagar
2026_DOLBU_1170495_3
Letter 295/NPD/2026 Dated 15-07-2026
Open Tender
Civil Works
Lump-sum
Dibiapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,200
EO
₹33,000
18 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground ,for which payment shall be made separately and stacking of servicebla | 36 | Cum | 95.93 | ₹3,453.48 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of sail. | 72 | m3 | 189.53 | ₹13,646.16 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of Skm also Including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 32.4 | m3 | 510 | ₹16,524 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5 | m3 | 1,546.37 | ₹7,731.85 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level: 1:4:8 (1 Cement 4 coarse sand: 8 graded stone aggregate 40 m nominal size) | 4.29 | qtl | 4,960.03 | ₹21,278.53 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and | 13.84 | qtl | 8,377.51 | ₹1,15,944.74 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: | 157.5 | m3 | 699.95 | ₹1,10,242.13 |
| 8 | Steel reinforcemt for rcc work including straightning cutting begning placing in position and | 55.74 | m3 | 7,852.89 | ₹4,37,720.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2196410.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].