Tender Value
₹1.2 Cr
EMD Value
₹2 L
Closing Date
30 Jun 2026, 4:00 pmClosed
Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
HESCOM/2026-27/EL/WORK_INDENT1216/CALL-2
HESCOM/2026-27/EL/WORK_INDENT1216/CALL-2
Open
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have executed work of installation and commissioning of minimum of One No. 5MVA and above higher capacity power transformers of 33/11KV and above voltage class with associated switchgears and ODS on Total Turnkey or Partial turnkey or labour Contract basis in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis /self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note: Please note that the date of issuance of the work completion or performance certificates must be at least one year after the actual date of work completion.
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 35.64Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving work of installation and commissioning of 5MVA and above higher capacity power transformers 33/11KV and above voltage class of value not less than Rs. 59.40 Lakhs (50% of the amount put to Tender) in any State/Central Govt./ Distribution Companies/PSUs in the last Five Financial Years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)..As a proof of documentary evidence Award copies and work completion/Performance certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV. Note: Please note that, Award cost and Executed cost must be mentioned in the work completion/Performance certificates.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹2,980
₹2 L
7 Sept 2026
18 Jun 2026
1 Jul 2026
22 Jun 2026
22 Jun 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2026-27/EL/WORK_INDENT1216/CALL-2 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Rs.in Lakhs
Note:Works completed during the period from (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 6967312.62 6967312.62
2 Labour charges+ Decommissioning (Exclusive of GST) 1462053.23 1462053.23
3 Civil Engineering Charges (Exclusive of GST) 1156430.47 1156430.47 2.806226956
5 Area Specific Loading @ 12% on labour charges 0 175446.3877 138771.66 314218.04
Contractors Profit @ 10% on Sl No. Sl No. 4 & 5 696731.26 163749.96 129520.21 990001.44
% age of tender compenents included 236.00
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK Basis (5 MVA Power Transformer will be supplied by departmentally)
Part : A Material Portion
Sl. No. Particulars Unit Qty Unit Rate Rate Amount
1 Power Transformer: 5 MVA, 33/11 kV Transformer with all fittings and accessories, OLTC, RTCC, First filling of oil and 10 % Spare oil (As per ESCOM's CSR- 2025-26 33KV Material. page No- 69 of 81 SL.No-1, Item No-1.01 ,Material Code-1.01)( Supplied Departmentally) Nos 0 8381013.60 6597322.00 0.00
2 Current Transformer: 0.00
a) 33kV class CT with 0.2 accuracy class, 200 - 100/1-1-1A for Transformer. (As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-6, Item No-2.01) Nos 3 45000 57030 171090.00
3 33KV SF-6/ Breakers: 0.00
66 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi-pneumatic/pneumatic type operating mechanism and mounting structure etc., as per technical specification. (As per KPTCL SR 2025-26, Page No- 14, SL.No-278 Nos 1 730000 645000 645000.00
33/11kV Transformer Panel (Simplex) ( KPTCL SCHEDULE OF RATES 2023-24, Pg No. 41, 16.1.7) Note: Rate is not given in the CSR 2023-24 hence rate given to 33/0.433 kV Transformer Panel is considered for this) Nos 1 648560.00 540467 540466.67 159
5 Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00 0.00
a) 30 kV Metal Oxide with surge counter Arrestor class : Discharge Class 3 (Station Medium Duty (SM)) - for Transformer & UG Cable(As per ESCOM's CSR- 2025-26 33KV Material. page No- 81 SL.No-18, Item No-3.01) Nos 3 11918.00 11583 34749.00
b) 11 kV Lightning Arrester, Metal oxide, 10 kV, 5 kA Polymeric Type with ground disconnector( As per ESCOM's CSR- 2025-26 33KV Material. page No- 13 SL.No-184 Item No-19.02) Set 3 1786 1735 5205.00
6 Mounting Structures:Mounting Structures for equipments made out of fabricated galvanised angle iron for GOS / CT's / PT's / LA's / NCT / HI PI etc with galvanised Bolts & Nuts as per approved drawing. [KPTCL SCHEDULE OF RATES 2023-24, Pg43, Sl No. No. 18.1] 0.00
S.M. Rail and M.S. angle iron for Transformer plinth ( 2 nos. of 3m long) SM rail and 65x65x6 mm angle iron 8mtr long 0.2 MT each. ((Extracted from SL No. 78 of KPWD SR 2023-24, Volume - 1)) MT 0.2 68000.00 56666.67 11333.33 2.266 0.877 0.043 0.92 2.5076
7 Insulators and Hardware 0.00
a) 33 kV, 70KN Polymer Insulator (Ball & Socket type)( As per ESCOM's CSR- 2025-26. page No- 82 SL.No-25 Item No-6.03) Nos. 36 519.00 390 14040.00
b) 33 kV Polymer Pin Insulator [ESCOM SR 2025-26 Pg No.120, Sl No. 24, Item No. 6.02] Nos. 18 854.40 756 13608.00
c) Strain Clamps, 3 Bolt type for 70/90 KN Disc Insulator [ ESCOM SR 2025-26, PG. No.138 , Sl No. 8, Item No. 50.5.8] Nos 12 741.00 1336 16032.00
d) Single Suspension Clamps with arcing horn for Coyote Nos 12 1843.00 1367 16400.00 132000
e) T - Clamp for Coyote conductor with hot dipped galvanized bolts, nuts and washers( As per ESCOM's CSR- 2025-26. page No- 7 SL.No-75 Item No-10.07) Nos 6 576 426 2556.00
f) Pad -Clamps for Coyote ACSR As per ESCOM's CSR- 2025-26. page No- 7 SL.No-77 Item No-10.09 Nos 6 848 734 4404.00
g) Post Insulators clamp suitable for Coyote ACSR conductor 127/76mm As per KPTCL SR- 2025-26, No- 5, SL.No-74) Nos 6 991.00 846 5075.00
h) Eye Hook (Flat Type) for fixing Clamp (ESCOMs SR 2025-26, SL No: 410 Item No. 43.3) Nos 6 102.00 103 618.00
i) Solid Core Bus Post Insulator 33 kV As per KPTCL SR- 23-24, No- 11, SL.No-186) Nos 6 3663.00 3060 18360.00
8 33 kV, 800 A, 25 kA Isolators, double break with manual operating mechanism, with solid core insulator, terminal connector suitable for Al. tube/conductor, marshalling box etc., complete as per technical specification Upright without Earth Switch (Live Point Height 4750 mm) [KPTCL SCHEDULE OF RATES 2023-24, PgNo. 57, Sl . No. 9.14.3 & erection PgNo. 119, Sl. No. 17.A.i] Sets 2 95590.00 79658.33 159316.67
9 11 kV SWITCH GEAR : (KPTCL SCHEDULE OF RATES 2023-24, Page No: 27 SL No:4.2.) 0.00
11 kV PCVCB, 500 MVA, 25 kA, 1600 A incomer 800 A feeder Set 0.00
Incomer Panel (As per KPTCL SR- 2025-26, No- 12, SL.No-215), Set 1 831915.00 732583 732582.50
Feeder Panel (As per KPTCL SR- 2025-26, No- 12, SL.No-216), Set 5 640512.00 564033 2820166.67
Feeder Panel for Capacitor Bank (As per KPTCL SR- 2023-24, No- 12, SL.No-217), Set 0 749349.00 659875.00 0.00
10 11 kV, 400 Amps Double Break GOS (Dwg No. BESCOM/GM/QS&S/22 Dtd 24.11.2018)[ESCOMs SR 2025-26,Sl No. Pg No ; 54, 215, Item No.24.04] set 7 20500 20500 143500.00
11 kV, 200 Amps Single Break Polymer Type Post Insulators GOS ) [ESCOMs 2025-26,Sl No. 213, Pg No ; 54, Item No.24.02] No 5 9063 9063 45315.00
H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - GI. [ESCOMs SR 2025-26,Sl No. 218, Pg No ; 55, Item No.24.07] set 5 5052 5052 25260.00
Earth bonds (Copper) to GOS handles 300mm long, [KPTCL SCHEDULE OF RATES 2023-24 Pg No. 43, Sl No. 19.5] Nos. 12 469 469 5628.00 16 16 128 17.18120805 18
Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00 24 6
11 11 kV Lightning Arrester, Metal oxide, 10 kV, 5 kA Polymeric Type with ground disconnector (Extracted from CDS-24 of ESCOMs SR 2025-26) Each 18 5205 5205 93690.00
11 kV Lightning Arrester, Metal oxide, 10 kV, 5 kA Polymeric Type with ground disconnector (As per ESCOM's SR-2023-24 Page No.8 of 5 SL.No.174 Each 18 1786 1786 32140.80
12 Conductors 0.00
Coyote ACSR Conductor with 1.5% Sag As per ESCOM's CSR- 2025-26 33KV page No- SL.No- Item No-22.8)(Extracted from KPTCL SR) km 0.8 155000 135537 108429.60 72 3.6 64.8 108
9 Mtr. Long, 145kg RCC pole for ODS ( As per ESCOM's CSR- 2025-26 33KV Material. page No- 3 SL.No-1 Item No-1.01) Nos 12 7531 6276 75312.00 1742
11 kV side Station structures: Beam out of Channel 100 x 50 with arrangements for stringing power conductor on 11 kV side. 0.00
1B1 7.45 Mtr long (GI) section size 100x50mm As per Circular 2764-65 dtd 5.08.2023 of CEE T& P, KPTCL, B'lore [KPTCL SCHEDULE OF RATES 2023-24 weight of Beam Pg. No.246 Sl No. IIBi-18X0.071MT=1.2852 MT KPTCL SCHEDULE OF RATES 2023-24 Pg No. 43, Sl No. 18.2] No 1.2852 124000 106667 137088.00 0.0714 1.2852 1.071 67.05 19.278
1B2 4 Mtr long (GI) section size 100x50mm As per Circular 2764-65 dtd 5.08.2023 of CEE T& P, KPTCL, B'lore [KPTCL SCHEDULE OF RATES 2023-24 weight of Beam Pg. No.246 Sl No. IIBii-8X0.038MT=0.3024 MT KPTCL SCHEDULE OF RATES 2023-24 Pg No. 43, Sl No. 18.2] No 0.3024 124000 106667 32256.00 0.0378 0.3024 0.3024
14 D.P.Structures: 0.00 1.5876
D.P. Structures with 9 mtrs long RCC poles with hardware consisting of double power X-arms, horizonontal cross brace, cross braces, back cleat, strain plate, bolt & nuts, painted with two coats of metal primer and aluminium paint, etc As per ESCOMs SR- 2023-24 No- 10 of 50, SL.No-214) Set 5 6164 7374 36870.00
11kV, 45 kN polymeric insulatorESCOMs SR- 2023-24 No- 5 of 50, SL.No-56 No.s 36 201.6 0.00
15 a) Control Cable with Accessories: (With glands/lugs/ferruels) 0.00
i) 19 Core 2.5 Sq.mm. (As per KPTCL SR-2023-24,As per KPTCL SR- 2025-26, No- 10, SL.No-181) Mtrs 450 585.00 591 265873.50
ii) 4 Core 6 Sq.mm (COMMON SR 2018-19. 11kV material SL No 614.It.No 64.12) Mtrs 250 247.00 206 51395.00 54
iii) 4 core 2.5 Sq.mm (As per KPTCL SR-2023-24, Mtrs 250 153.00 149 37290.00 216
iv) 2 core 2.5 Sq.mm (As per KPTCL SR-2023-24, Mtrs 100.0 99.00 93 9250.00
17 Supplying (as per approved design and drawing) 0.00
a) Caution/Danger Board. As per ESCOMs SR- 2025-26, No- 52, SL.No-710) Nos 8 157 131 1048.00
b) Name Plates for equipment/Earth Pit(As per present market rate due to non availability of rates in the current SR) Nos 10 250.00 250 2500.00
18 Station yard lighting (outdoor): including Civil works complete. 0.00
a) Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT > 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire > IK08. Power Factor >0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency>1301m/w, nominal CRI >75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. LED Floodlight 100W [PWD Electrical Page 45. Sl No. 11.92] Nos 10 7347.18 7347.18 73471.76 1000
b) 2 Core , 6 Sq. mm, 1.1KV class armoured Al. Cable including PVC pipes for Yard Lighting completeMaterial Page No: 4 of 28, Sl No.1,item no.1.12.2,Material Rate Rs.120.32 Mtrs 300 155 129 38678.20 70 4.347826087 5.115089514
c) Supplying and fixing of metal clad industrial plugs and sockets 32 Amps. for Yard Lighting complete [PWD Electrical SR Page 8. Sl No. 3.13.2]. Nos. 5 548.08 457 2283.67
d) Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.[PWD Electrical Page 16, Sl No.5.18.4] Nos. 1 739 616 615.83
e) 8 mtr long RCC poles for station yard lighting .(ESCOMs SR-2023-24, Sl No.(1)(d) of M & LC) No 10 8129 8129 81290.00
Total Rs. Station (Materials) 6967312.62
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
Part : B Electrical Erection Portion
Sl. No. Particulars Unit Qty Unit rate Rate as per SR 2025-26 Total Labour Cost
1 ERRECTION OF POWER TRANSFORMERS
a a)Moving the Transformer to the plinth. Maximum allowable distance is 50 metre (More than 50 metre, approval of D(T) has to be obtained)[KPTCL SCHEDULE OF RATES 2023-24, Pg No.116,No,9a] Mt/ mtr 300 80.00 67 20000.00 720 134
b b) i) Assembly 1Nos of 5 MVA. Power transformers parts like bushing, radiators, conservators, tank, filling oil into transformer for total weight of the transformer. ( 1 X 13.4MT=13.4MT) )[KPTCL SCHEDULE OF RATES 2023-24, Pg No.116,No,9b] MT 15 1134.00 945 14175.00 1000
c ii) Filtration of oil using filter set of the contactor to bring the insulation value to IE specifications. ( 1 X 6500L=6500L))[KPTCL SCHEDULE OF RATES 2023-24, Pg No.116,No,9d] Ltr 6500 7.00 6 37916.67
d Wiring of Transformer marshalling box, bucholtz relay, fixing thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/Firm Engineers for 5 MVA to 6.3/8 MVA Tr. [KPTCL SCHEDULE OF RATES 2023-24, Pg No.116,No,(9)(f)(i)] per transfor mer 1 6708.00 5590 5590.00
e d)Fabrication of Transformer railing and embedding in Transformer plinth (Rails to be supplied by the Agency) [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 116, Sl No,10] Set 1 1897.00 1581 1580.83
f Testing & Commissioning of 33/11 kV, 5 MVA Power Transformers Inspection of wires and ferrules. Inspection of wiring of protective devices, cooling fans, oil flow pumps, OLTC, RTCC, bushing etc., [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 117, Sl No,12a] per transfor mer 1 14180.00 11817 11816.67 11719.00826 14062.80992 14062.80992
g Testing : 1. Ratio Test, 2. SC Test, 3. Excitation Current Test/ Highpot Test, 4. Magnetic Balance Test 5. Vector Group Test 6. Induced High Voltage Test 7. OLTC Operation - Local and Remote 8. Protective Devices Operation Checks 9. Stability Checks : For Differential & REFR Protection 10. Winding Resistance Test 11. Insulation Resistance Test 12. Tan-Delta and Capacitance Test 13. Transformer mounted protective Devices 14. Sweep Frequency Response Analysis for 33/11 kV, 5 MVA Power Transformers. [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 117, Sl No,12b] per transfor mer 1 34007.00 28339 28339.17 28104.95868 33725.95041 33725.95041
2 Current Transformer: 0.00 0 0
a Erection of CTs and PTs and wiring including movement from the point of unloading to the point of erection. (As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.: 14 (a) Rs-2199.00 Set 1 2199.00 1833 1832.50 1817.355372 2180.826446
Assisting in Testing and Commissioning. (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 (b) Rs-768.00 Set 1 768.00 640 640.00 634.7107438 761.6528926
b Testing & Commissioning of current transformer, Wiring: Indentification of wires ferrulling Crimping of lugs Connections up to marshalling box and Control panel Current Tranformers (KPTCL SCHEDULE OF RATES 2023-24, Page No:118 SL No:14c .) Set 1 2837.00 2364 2364.17 2344.628099 2813.553719
c Testing and Commissioning of CT: Insulation resistance, polarity,ratio, excitation, Core identification, tan-delta & capacitance test. (KPTCL SCHEDULE OF RATES 2023-24, Page No:118 SL No:14c .) Set 1 11264.00 9387 9386.67 9309.090909 11170.90909
d Erection of NCTs and PTs and wiring including movement from the point of unloading to the point of erection. (As perKPTCL CSR 23-24, Labour, Page No: 118, Sl No.:15(a) Rs-733.00 Set 1 733.00 611 610.83 605.785124 726.9421488
Assisting in Testing and Commissioning. (As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.:15(c) Rs-99.00 Set 1 99.00 83 82.50 81.81818182 98.18181818
Testing and Commissioning of NCTs: Insulation Resistance, Polarity, Ratio, Excitation, Core Identification, Tan-Delta and Capacitance Test) (KPTCL SCHEDULE OF RATES 2023-24, Page No:118 SL No:15b .) Set 1 4545.00 3788 3787.50 3756.198347 4507.438017
3 Control Panels 0.00 0 0.00 0 0
a) Erection of control panels, auxilary panels, carrier cabinets etc., alignment and fixingproperly to foundation base including movement from the point of unloading to the point oferection.,((As per KPTCL SR-2023-24 Labour,Page No-120, Sl.No-23, Item No-(a) Rs-4191) Per panel 1 4191.00 3493 3492.50 3463.636364 4156.363636
b Assisting in testing and commissioning of panel (with SAS) (KPTCL SCHEDULE OF RATES 2023-24 Pg. No.121 Sl No. 23(d)] Per panel 1 10149.00 8458 8457.50 8387.603306 10065.12397
c Testing & Commissioning: C&R Panels Wiring & Testing (KPTCL SCHEDULE OF RATES 2023-24 Pg. No.121 Sl No. 23(d)] 0 0.00 0 0
i Wiring of C&R panels: Identification, ferruling, crimping, termination of wires in C&R panels (with SAS) Per panel 1 15224.00 12687 12686.67 12581.81818 15098.18182
ii Testing of C&R panels: Testing for insulation level, testing of relays, control perations for closing tripping etc., interlock. Alarm annunciation & indication checks (with SAS) Per panel 1 36425.00 30354 30354.17 30103.30579 36123.96694
4 Mounting Structure 0.00
Erection alignment & assembly of fabricated steel lattice structure. Pedestal structure & Mounting structures for GOS, CTs, PTs, Las etc., (As per KPTCL SR 23-24, Labour, Page No: 116, Sl No.: 8, (b) , Rs-5723.00 0.00
2)33KV Current Trasformers - (0.142 MT + .007MT = 0.149MT) MT 0.149 5723.00 4769 710.61 0.149
3)33KV Voltage Trasformers - (0.142 MT + .007MT = 0.149MT) MT 0.149 5723.00 4769 710.61 0.149
6) High P.I. Support for Transformers - (0.142 MT + .007MT = 0.149 MT) MT 0.149 5723.00 4769 710.61 0.149
S.M. Rail and M.S. angle iron for Transformer plinth ( 2 nos. of 3m long) SM rail and 65x65x6 mm angle iron 8mtr long 0.2 MT each. (Markaet Rate) MT 0.2 5723.00 4769 953.83
5 Erection of 11 kV Switchgear 0.00
a Erection, alignment and fixing to the foundation, indoor/outdoor 11 kV switchgear panel/unit including movement from the point of unloading to the point of erection 0.00
i 11 kV Indoor / Outdoor Switchgear (1Bank+3 feeders) (As per KPTCL SR 23-24, Labour, page No: 121, Sl.No:24 a (i) ) Rs-2081/-) Per panel 5 2081.00 1734.00 8670.00
ii 11 kV Kiosk (1Bank+3 feeders) (As per KPTCL SR 23-24, Labour, page No: 121, Sl.No:24 a (i) ) Rs-2081/-) Per panel 5 2081.00 1734.00 8670.00
iii 11 kV outdoor switchgear. As per KPTCL SR 23-24, Labour, page No: 122, Sl.No:24 b (i) ) Rs-941.00 Per panel 5 941.00 784 3920.83
iv 11 kV Kiosk [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 121, Sl No. 24.b ii] Per panel 5 941.00 784 3920.83
b Testing & Commissioning: Wiring: Identification of wires, ferruling, crimping & termination of wires for annunciation, etc., Testing of relays, CTs, PTs & Breaker for operation 0 0.00
i For single 11 kV panel outdoor type/kiosk [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 122, Sl No. 24.c iv] Per panel 1 18974.00 15812 15811.67 15680.99174
ii For each additional 11 kV panel outdoor type/kiosk [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 122, Sl No. 24.c v] Per panel 4 14231.00 11859 47436.67
6 Busbar Formation: Main bus/cross bus (all the three phases in a segment ) of using Coyote-single conductors with fixing of insulator spacers levelling of string conductors to the required height above the equipment, including providing jumps to interconnect different segments of the main bus using Single Coyote conductor. [KPTCL SCHEDULE OF RATES 2023-24, Pg No. 122, Sl No. 25.c ] per bay 1 7364.00 6137 6136.67
7 Erection of 33kV Isolators 0.00
a Assembling, Errection, alignment and wiring including movement from the point of unloading to the point of errection, (Upright) [ As per KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 A(i) ,) Rs-1319.00 ) set 2 1319 1099 2198.33
b Assisting in testing and commissioning (Upright) ( KPTCL CSR 23-24, Labour, Pg No:119 , Sl No.: 17 E(i) ,) Rs-191/- set 1 191 159 159.17
c ii) 11KV Class isolators (11kV, 400 Amps Double Break GOS-1 No's,(As per ESCOM SR- 2025-26, Labour, Pg No:58 Sl No.: 37 ,itme no: 2.09) (Rs - 288) (Total - 1082+288=1370) set 9 1298.40 1370.00 12330.00
d ii) 11KV Class isolators (11kV, 200 Amps Single Break GOS-1 No's), As per ESCOM SR 2023-24, Sl No. 97, Item No.13.01] set 4 805 671 2683.33
e Errection of H frame [ESCOM SR 2023-24 Sl No. 37, Item No.2.09] set 4 323 269 1076.67
f Fixing of Solid core insulator.[KPTCL SCHEDULE OF RATES 2023-24, Pg No. 119, Sl No. 19] per stack 3 111 93 277.50
8 Errection of Lighting Arrestors: 0.00
a Errection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection. 33 kV Class .[KPTCL SCHEDULE OF RATES 2023-24, Pg No. 119, Sl No. 18] Set 1 333 278 278.00
b 11 kV Lightning Arrester, Metal oxide, 10 kV, 5 kA Polymeric Type with ground disconnector Set 6 119 99 594.00
9 Errection of D.P Structure. 0.00
a D.P. Structures hardware consisting of double power X-arms, horizonontal cross brace, cross braces, back cleat, strain plate, bolt & nuts, painted with two coats of metal primer and aluminium paint, etc as per drawing .(G.I). [As per ESCOM SR 2023-24, Sl.N:5a of M & LC] Set 4 5392 3682 14728.00
10 Errection of 11KV ODS: 0.00
a Errection of 9 mtr RCC pole [As per ESCOM SR 2023-24, Sl.N:1b of M & LC] No.s 10 1742 1742 17420.00
b Erection alignment & assembly of Station Structure, as per the direction of site Engineer (KPTCL SCHEDULE OF RATES 2023-24 Pg. No.116 Sl No. 8 (a)] MT 1.5876 5723 4769 7571.26 0.0714 0.09176328
11 Laying of Control Cables: 0.00
Laying of control cables from equipments to control panels/Annunciation desk, Necessary termination at both ends with ferrules, lugs etc., as per the instructions of Engineer incharge of work. (KPTCL SCHEDULE OF RATES 2023-24 Pg. No.120 Sl No. 22 (b)] Rmtr 1050 15.00 1050 1102500.00
12 a) Caution/Danger Board. (As per ESCOM SR- 2025-26, Labour, Pg No:60 Sl No.: 63 ,itme no:5.15) Nos 8 85.00 71.00 568.00
1 Name Plates for equipment/Earth Pit (KPTCL SCHEDULE OF RATES 2023-24.Pg no 113, Sl No. 3b) Nos 10 85.00 71.00 710.00
13 Station yard lighting (outdoor): including Civil works complete. 0.00
e) 8 mtr long RCC poles for station yard lighting (As per ESCOMs SR 2023-24 Sl No. 1C of M & LC) No 5 1425.00 1187.50 5937.50
Total Rs. Station (Erection Labour) 1462053.23
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
PART- A1-(CIVIL WORKS)
Sl No. Item Description Unit Quantity Unit Price (Rs) Unit Price (Rs) Total Price (Rs)
i Base concreting For 11/9.5/9/8 M Pole (500x650x150 mm)
ii Pole concreting (without coping) Nos. 32 312.00 260 8320.00 80 30 1.5 45
iii Coping for Poles 150 mm around pole for an height of 300 mm for RCC/PSCC Pole (400x400x300 mm) Nos. 32 312.00 260 8320.00
B2 Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineerin-charge of works as per the standard procedure.[KPTCL SCHEDULE OF RATES 2023-24, Pg No. 158, Sl No.1 of Specific civil works] Cmt 350 1773.00 1478 517125.00 200
B3 Earthwork in surface excavation in ordinary soil or levelling and lowering the ground manually (other than foundation of buildings, culverts, road drains amd trenches of pipe line and cables) and removing the excavated stuff to a distance not exceeding 50 mtr and lift upto 1.5 mtr, excavated surface levelled and neatly dressed, disposed earth to be levelled after breaking of clods and neatly dressed as per specifications, (1 Tower=1.8*1.8*3.75=12.15 CUM) (12.15*14=170.10 CUM) [ KPWD SR 2023-24, PG. No.6, Item No. 1.4.3] Cmt 65.4 376.00 313 20492.00
B4 Concreting: 0 0.00 12 12.8
a PCC: M10 concrete 1:3:6: (1.5x1.5x..2=0.45. Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates) as per specification. .(0.45x14=6.3) [ KPWD SR 2023-24, PG. No.15, Item No. 2. 1.4] Cmt 15.98 6,217.00 5181 82789.72 36 5.7
b M20 Concerte: (0.95*.0.95*3.75=3.38Cum per Pole). Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P.No.15, Item No.2.2.1.) (3.38*14=47.32 CMT) [ KPWD SR 2023-24, PG. No.15, Item No. 2. 2.1] Cmt 54.6 6,287.00 5239 286058.50 6 72.96 216.96 0.1 21.696
c Copping-M20 Concerte:. Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P.No.15, Item No.2.2.1.) (0.95*0.95*0.3*14=3.790Cum per Pole) [ KPWD SR 2023-24, PG. No.15, Item No. 2. 2.1] Cmt 4.8 6,287.00 5239 25148.00 3
d Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (25Kg perx14=350 KGS ) [ KPWD SR 2023-24, PG. No.18, Item No. 2. 11.h] Kg 1922.85 79.01 66 126605.25 9 12
f Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications. (Total excavation per tower-Concrete qty 12.15-3.83=8.32 Cmt ( per Tower)x 14 Towers=116.48 CMT [ KPWD SR 2023-24, PG. No.07, Item No. 1. 10] Cmt 45.99 160.00 133 6132.00 6 30
Total Cost of Civil Engineering Works 1156430.47
SINGLE LINE DIAGRAM OF EXISTING 33/11KV OF 1*5MVA AT 33/11KV SUB-STATION GULLAPUR
(PT)POTENTIAL TRANSFORMER
33KV ISOLATOR 33KV CB
(CT) CURRENT TRANSFORMER
5MVA TRF-1 and TRF-2
Lightning Arrester
PT 33KV ISOLATOR PT Muss 110/33KV
CAPACITOR BANK-1 F-1 Mavinamane Feeder F-2 Arbail Feeder F-3 Doranageri Feeder F-4 Halavalli Feeder
Junior Engineer (ELE) Asst Executive Engineer (ELE).
33/11KV MUSS 33KV S&L SUB-DIVISION HESCOM SIRSI.
HESCOM Gullapur.
SINGLE LINE DIAGRAM OF 33/11KV PROPOSED OF 1*5MVA TO ADDITIONAL 1*5MVA AT 33/11KV SUB-STATION GULLAPUR
(PT)POTENTIAL TRANSFORMER.
33KV/11KV ISOLATOR.
33KV ISOLATOR Replacementing 33KV SF-6 CB .
(CT) CURRENT TRANSFORMER.
5MVA to 8MVA TRF-1 and TRF-2.
LIGHTNING ARRESTER.
NEW (4 Nos )11KV BREAKERS.
PT 33KV ISOLATOR 33KV ISOLATOR PT
NEW BUS COUPLER.
33KV CB New 33KV CB
33KV CT 33KV CT
5MVA TRF-1 New 5MVA TRF-2
33KV CB 11KV BANK-1 CB
11KV CT BUS COUPLER 11KV CT
CAPACITOR BANK-1 F-1 Mavinamane Feeder F-2 Arbail Feeder F-3 Doranageri Feeder F-4 Halavalli Feeder PROPOSAL FEEDEDS
Junior Engineer (ELE) Asst Executive Engineer (ELE).
33/11KV MUSS 33KV S&L SUB- DIVISION HESCOM SIRSI.
HESCOM Gullapur.
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '9 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "9 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
10 work done.xls
Others - 10 work done • 0.03 MB
1 NIT INDENT 1216 call 2.doc
Others - 1 NIT INDENT 1216 call 2 • 0.14 MB
8 technical specification 1216 call 2.doc
Others - 8 technical specification 1216 call 2 • 0.58 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
4 section iii GCC INDENT 1216 call 2.doc
Others - 4 section iii GCC INDENT 1216 call 2 • 0.14 MB
3 section ii ITB 1216 call 2.doc
Others - 3 section ii ITB 1216 call 2 • 0.11 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
2 section 1 IFB 1216 call 2.doc
Others - 2 section 1 IFB 1216 call 2 • 1.41 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
5 section iv ECC INDENT 1216 call 2.doc
Others - 5 section iv ECC INDENT 1216 call 2 • 0.09 MB
6 section v SCC INDENT 1216 call 2.doc
Others - 6 section v SCC INDENT 1216 call 2 • 0.11 MB
11 5MVA Gullapur.xlsx
Others - 11 5MVA Gullapur • 0.99 MB
9 tender capacity.xlsx
Others - 9 tender capacity • 0.01 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
7 Annexures 1216 call 2.doc
Others - 7 Annexures 1216 call 2 • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .