Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC AMEYA PLOT NO 8 KURTARKAR NAGARI SHANTINAGAR PONDA | NORTH GOA | GOA | 403001 | ₹3.3 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹3.4 Cr+₹10.0 L (3.01%)Rejected-Finance BLDG NO 03 SF 3 SF 4 TECHNO CIDADE CHOGM ROAD ALTO PORVORIM BARDEZ GOA | NORTH GOA | GOA | 403524 | ₹3.4 Cr+₹10.0 L (3.01%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SHIVAM INFRATECH L1 | BAGKIYA CONSTRUCTIONS PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :All kinds of soil | 353.77 | m3 | 300 ₹1,06,131 Lowest | 310 ₹1,09,668.7 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 82.38 | m3 | 2,200 ₹1,81,236 Lowest | 2,400 ₹1,97,712 |
| 3.00 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | 61.79 | m3 | 6,800 ₹4,20,172 Lowest | 7,170 ₹4,43,034.3 |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 311.84 | m2 | 500 ₹1,55,920 Lowest | 520 ₹1,62,156.8 |
| 5.00 | Centering & shuttering including Strutting, Propping & removal of forms for :Staircases (except spiral staircases) excluding landing | 54.31 | m2 | 350 ₹19,008.5 Lowest | 370 ₹20,094.7 |
| 6.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : columns, pillars, piers. | 86.14 | m2 | 600 ₹51,684 Lowest | 640 ₹55,129.6 |
| 7.00 | Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | 322.23 | m2 | 450 ₹1,45,003.5 | 440 ₹1,41,781.2 Lowest |
| 8.00 | Centering & shuttering including Strutting, Propping & removal of forms for :Suspended floors, roofs landings, shelves & their supports | 457.48 | m2 | 650 ₹2,97,362 Lowest | 700 ₹3,20,236 |
| 9.00 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level v)M-30grade of concrete | 206.34 | m3 | 9,000 ₹18,57,060 Lowest | 9,500 ₹19,60,230 |
| 10.00 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 30,951 | Kg | 100 ₹30,95,100 Lowest | 110 ₹34,04,610 |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
12 Jul 2024, 5:00 pmClosed
Member Screatary
Gsuda, 6TH FLOOR, SHRAMASHAKTI BHAVAN, PATTO PLAZA, PANAJI GOA.
Construction of Golden Jubliee building of Ponda Municipal Council in Sy no.9/6 and 9/7 at Sadar, Ponda Goa (Balance work).
2024_GSUDA_15970_1
40/3/GSUDA/ETENDER/25/2425/416
Open Tender
Civil Works
Item Rate
365 days
Ponda
Please Refer Tender Document
3 documents required · 3 mandatory
₹15,000
₹6.3 L
3 Nov 2025
21 Jun 2024
18 Jul 2024
21 Jun 2024
12 Jul 2024
21 Jun 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .