| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹26.7 Cr+₹3.5 Cr (15.1%)Admitted-Finance 610 PP TOWERS C 1 2 3 NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | L2 | Admitted-Finance | |
| 3 | L3₹33.1 Cr+₹9.9 Cr (42.5%)Admitted-Finance PLOT NO 462 KULDEEP SONI PLOT NO 462 PACE CITY II SECTOR 37 GURUGRAM 122001 PACE CITY II SECTOR 37 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical 355 85 GALI NO 16 ASHOK VIHAR PHASE II BHIM GARH KHERI ASHOK VIHAR PHASE II GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | - | Rejected-Technical Not Acceptable |
| Sl No | Description | Qty | Unit | ADVANCE VENTILATION PVT. LIMITED L2 | Air Perfection L1 | Anemo Projects Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00Supply of HVAC System including Design,engineering, procurement of materials and bought out components, manufacture, fabrication,inspection, factory testing, painting, packing, supply including all commissioning spares, special tools and tackles, first fill of refrigerants, lubricants and all consumables, erection material & documentation transportation to site, unloading at site, storage, preservation at site, installation at site, hook-up, pre-commissioning, site testing, balancing, commissioning, performance guarantee run and handover of the HVAC systems for the following list of buildings; | ||||||
| 1.00 | AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY CONTROL ROOM (CR-2) | 1 | Lumpsum | 1,50,17,399 ₹1,77,20,530.82 | 1,02,35,000 ₹1,20,77,300 Lowest | 1,59,41,934.1 ₹1,88,11,482.24 |
| 1.00 | AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY CONTROL ROOM (CR-3) | 1 | Lumpsum | 2,58,03,221 ₹3,04,47,800.78 | 2,51,35,000 ₹2,96,59,300 Lowest | 3,66,40,831.03 ₹4,32,36,180.62 |
| 1.00 | AIR CONDITIONING AND VENTILATION SYSTEM FOR LOCAL CONTROL ROOM (LCR) | 1 | Lumpsum | 57,27,494 ₹67,58,442.92 | 33,84,509 ₹39,93,720.62 Lowest | 67,34,486.92 ₹79,46,694.57 |
| 1.00 | AIR CONDITIONING AND VENTILATION SYSTEM FOR SATELLITE RACK ROOM (SRR-9) | 1 | Lumpsum | 1,37,00,668 ₹1,61,66,788.24 | 96,35,000 ₹1,13,69,300 Lowest | 1,55,45,172.71 ₹1,83,43,303.8 |
| 1.00 | AIR CONDITIONING AND VENTILATION SYSTEM FOR SATELLITE RACK ROOM (SRR-10) | 1 | Lumpsum | 1,16,28,623 ₹1,37,21,775.14 | 90,98,419 ₹1,07,36,134.42 Lowest | 1,44,58,636.14 ₹1,70,61,190.65 |
| 1.01 | AIR CONDITIONING AND VENTILATION SYSTEM FOR NREP MAIN SUBSTATION (SS-10) | 1 | Lumpsum | 5,54,72,166 ₹6,54,57,155.88 | 5,23,01,900 ₹6,17,16,242 Lowest | 7,64,70,895.08 ₹9,02,35,656.19 |
| 1.01 | AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY SUBSTATION (SS-13) | 1 | Lumpsum | 1,74,97,943 ₹2,06,47,572.74 | 1,14,20,718 ₹1,34,76,447.24 Lowest | 1,66,57,825.99 ₹1,96,56,234.67 |
| 1.01 | AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION (SS-14) | 1 | Lumpsum | 2,48,92,378 ₹2,93,73,006.04 Lowest | 2,70,67,550 ₹3,19,39,709 | 3,11,15,275.07 ₹3,67,16,024.58 |
| 1.01 | AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION (SS-17) | 1 | Lumpsum | 1,16,63,925 ₹1,37,63,431.5 | 1,25,52,908 ₹1,48,12,431.44 | 89,81,989.18 ₹1,05,98,747.23 Lowest |
Tender Value
Refer Docs
EMD Value
₹9.0 L
Closing Date
15 Feb 2024, 3:00 pmClosed
SEKAR HIRUDHAYAM
TECHNIP ENERGIES INDIA LTD, CHENNAI
HVAC SYSTEMS FOR CR, SS, SRR AND OTHER BUILDINGS (EPCM) FOR NUMALIGARH REFINERY EXPANSION PROJECT
2024_NRL_789844_1
TP/082176C/NRL/PQ/115
Open Tender
Mechanical Tools and Equipment
Supply
390 days
NUMALIGARH
PLEASE REFER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹0
₹9.0 L
Yes
12 Apr 2024
11 Jan 2024
16 Feb 2024
11 Jan 2024
15 Feb 2024
29 Jan 2024
Supply of HVAC System including Design,engineering, procurement of materials and bought out components, manufacture, fabrication,inspection, factory testing, painting, packing, supply including all commissioning spares, special tools and tackles, first fill of refrigerants, lubricants and all consumables, erection material & documentation transportation to site, unloading at site, storage, preservation at site, installation at site, hook-up, pre-commissioning, site testing, balancing, commissioning, performance guarantee run and handover of the HVAC systems for the following list of buildings;
AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY CONTROL ROOM (CR-2)
AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY CONTROL ROOM (CR-3)
AIR CONDITIONING AND VENTILATION SYSTEM FOR LOCAL CONTROL ROOM (LCR)
AIR CONDITIONING AND VENTILATION SYSTEM FOR SATELLITE RACK ROOM (SRR-9)
AIR CONDITIONING AND VENTILATION SYSTEM FOR SATELLITE RACK ROOM (SRR-10)
AIR CONDITIONING AND VENTILATION SYSTEM FOR NREP MAIN SUBSTATION (SS-10)
AIR CONDITIONING AND VENTILATION SYSTEM FOR UTILITY SUBSTATION (SS-13)
AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION (SS-14)
AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION (SS-17)
AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION (SS-18)
AIR CONDITIONING AND VENTILATION SYSTEM FOR MRSS CONTROL BUILDING
VENTILATION SYSTEM FOR MRSS 220KV GIS BUILDING
AIR CONDITIONING AND VENTILATION SYSTEM FOR MRSS 33KV GIS BUILDING
VENTILATION SYSTEM FOR FIRE WATER PUMP HOUSE
Description of Work / Item(s)
Supply of HVAC System including Design,engineering, procurement of materials and bought out components, manufacture, fabrication,inspection, factory testing, painting, packing, supply including all commissioning spares, special tools and tackles, first fill of refrigerants, lubricants and all consumables, erection material & documentation transportation to site, unloading at site, storage, preservation at site, installation at site, hook-up, pre-commissioning, site testing, balancing, commissioning, performance guarantee run and handover of the HVAC systems for the following list of buildings as per BOQ 1 ITEM 1.1 TO 1.14
ADVANCE VENTILATION PVT. LIMITED
Anemo Projects Pvt Ltd
ADVANCE VENTILATION PVT. LIMITED
Air Perfection
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .