| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,310Accepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹49,090+₹4,780 (10.8%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹59,810+₹15,500 (35.0%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
₹60,000
EMD Value
₹1,000
Closing Date
28 May 2020, 12:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
INDIRA NAGAR, BANDA
Erection of LT Lines and Sub-Station in Ganga Nagar and Palhari under Sugam Yojana under EUDD, Banda
2020_DVVNL_454495_2
104/SE/EDCB/2019-20
Open Tender
Electrical Works
Item Rate
60 days
BANDA
AS PER ANNEXURED
2 documents required · 2 mandatory
₹1,180
DVVNL
₹1,000
O/O SE, EDC, BANDA
10 Mar 2021
19 May 2020
28 May 2020
19 May 2020
28 May 2020
19 May 2020
25 May 2020
Amount
The work of ERECTION/EXTENSION of LT Lines & 63 KVA Sub-Station on 8.5 Mtr. long PCC Pole with ACSR Weasel/ABC Conductor in various places as Ganga Nagar, (Tindwari Road) & Palhari (Near Nahar) under SUGAM YOJANA YEAR 2018-19 as per passed package no. 21 & 22/BND/BP/2018-19 at EDSD, CHILLA ROAD, BANDA under EUDD, BANDA, including safe carriage of all required material from E.S.C., BANDA to work site and work site to E.S.C., BANDA, alongwith its loading, unloading & dragging at the respective ends, details of the work as given below :-
Cartage of 8.5 Mtr. long PCC poles
Cartage of line material
Cartage of 63 KVA Transformer
Erection of newly erected 8.5 Mtr. long PCC poles as single support structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual.
Erection of newly erected 8.5 Mtr. long PCC poles as double pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual.
Concreting/Grouting of newly erected 8.5 Mtr. long PCC poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge.
Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual.
Erection & Fixing of earthing rod complete as per RESSPO manual.
Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasel Conductor on the erected pole as per direction of supervising engineer/RESSPO manual.
Laying, sagging, stringing, binding, spreading and jumpering etc. of ABC Conductor of size 3x95+1x70+1x16/ 3x50+1x35+1x16 Sqmm. on the erected poles as per direction of supervising engineer/RESSPO manual.
Laying, stringing, binding and termination of LT PVC Cable size 3.5x35 mm2 on newly erected D/P as per direction of supervising engineer/RESSPO manual.
Fixing of LT Distribution Box with fitting of all accessories as per RESSPO manual.
Installation of 63 KVA Transformers on the newly erected double pole structure in proper alignment as per direction of Engineer incharge/RESSPO manual.
Erection & Fixing of MS Base Angle with fitting of all accessories as per RESSPO manual.
Erection & Fixing of Top Channel with fitting of all accessories as per RESSPO manual.
Erection & Fixing of Dropper Channel with fitting of all accessories as per RESSPO manual.
Erection & Fixing of T-Off Channel with fitting of all accessories as per RESSPO manual.
Erection & Fixing of Danger Board with fitting of all accessories as per RESSPO manual.
Erection & Fixing of 11 KV Fuse Set with fitting of all accessories as per RESSPO manual.
Vijaylaxmi Arthmovers
M/S KAMDGIRI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .