Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 33 BAJANAI KOVIL STREET PERANAMPAKKAM SEMMIYAMANGALAM CHETPET TALUK TIRUVANNAMALAI DISTRICT 606 904 | SEMMIYAMANGALAM | TIRUVANNAMALAI | TAMIL NADU | 606904 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹33.4 L
EMD Value
₹34,000
Closing Date
10 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Tiruvannamalai District Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayats at VEPPAMPATTU Panchayat of Peranamallur Block in Package No. TVM/2021-22/2214
2022_RDTN_239531_1
Roc.No.1250/2022/A13 Dt.22.06.2022 214
Open Tender
Civil Works
Lump-sum
180 days
Peranamallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,000
24 Aug 2022
5 Jul 2022
10 Aug 2022
5 Jul 2022
10 Aug 2022
5 Jul 2022
Amount
Part I : Renovation of Village Kulam near Periyandavar kovil (Inlet & Outlet Channel , Baby Pond Lining wall , Bhathing Ghat) in Veppampattu Panchayat.
Desilting :Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Having width of 3.0-10.0m
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Construction of Bhathing Ghat :Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Baby Pond Lining wall Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Inlet & Outlet : Earthwork excavation in all classes of soil as per SS 20A
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Part II : Providing CC pavement at Veppampattu colony (71m) in Veppampattu Panchayat.
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision for Bitumen Pad
Part III : Providing CC pavement with Retaining wall From Panchayat office to Waiting shed (124m) in Veppampattu Panchayat.
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:3:6 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision for Bitumen Pad
Part IV : :Providing CC Pavement with culvert at Kannikoil road (102m) in Veppampattu Panchayat.
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision for Bitumen Pad
RC slab culvert :Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc completed.,el including cost conveyan
C.C.1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc complete.,
Reinforced cement concrete 1:1½:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Toward Centering charges including cost and conveyance of all materiasl to site and all labour charges complete.,
Side face
Bottom face
Part V : Providing Threshing floor near Vepampattu eri in Veppampattu Panchayat.
Earth work excavation and depositing on bank with initial lead and lift and complete for foundation retaining wall alround
CC 1:4:8 mix using 40mm ISS Metal including cost and conveyance etc complete for foundation
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete
CC 1:3:6mix using 40mm ISS Metal including cost & conveyance
Supplying and filling in foundation and basement with filling sand including water consolidating etc.,
CC 1:2:4 mix using 20mm ISS Metal including cost & conveyance
Brick work in cement mortar 1:5 using country bricks of size10mm thick and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Provision for Bittumen Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Rishika Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .