Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC | ₹18.2 L | L1 | Accepted-AOC Quoted less than Tender Value |
| 2 | L2₹18.4 LRejected-AOC | ₹18.4 L | L2 | Rejected-AOC Quoted more than Tender Value |
| 3 | L3₹19.8 LRejected-AOC S A | ₹19.8 L | L3 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L3 | M/S KBB Construction L2 | BEEMJI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Vellore District Construction of 30000 Litres Capacity OHT Tank (12.00m Staging Height) at Karungali in Karungali Panchayat at Anaicut Block 15th CFC (DP) JJM 2025-26 Package No 01 | ||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 55.13 | cum | 267.89 ₹14,768.78 | 247.95 ₹13,669.48 | 240 ₹13,231.20 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 2.3 | cum | 1,784.52 ₹4,104.40 | 1,651.68 ₹3,798.86 | 1,500 ₹3,450 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 6.91 | cum | 5,574.33 ₹38,518.62 | 5,159.38 ₹35,651.32 | 5,000 ₹34,550 |
| 5.00Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | ||||||
| 6.00 | Items 1.50 m to 4.50m below GL | 7.58 | cum | 9,693.97 ₹73,480.29 | 8,972.36 ₹68,010.49 | 8,000 ₹60,640 |
| 7.00 | Items 0 m to 1.50m below GL | 1.75 | cum | 9,550.7 ₹16,713.73 | 8,839.75 ₹15,469.56 | 9,000 ₹15,750 |
| 8.00 | Items 0.0 to 4.50m Above GL | 2.83 | cum | 9,693.97 ₹27,433.94 | 8,972.36 ₹25,391.78 | 9,100 ₹25,753 |
| 9.00 | Items Above 4.51m to 7.32 m | 2.23 | cum | 9,832.92 ₹21,927.41 | 9,100.97 ₹20,295.16 | 9,200 ₹20,516 |
| 10.00 | Items Above GL 7.33m to 10.98m | 2.53 | cum | 10,115.15 ₹25,591.33 | 9,362.19 ₹23,686.34 | 9,500 ₹24,035 |
Tender Value
Refer Docs
EMD Value
₹39,420
Closing Date
12 Feb 2026, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER
THE BLOCK DEVELOPMENT OFFICER,ANAICUT
Vellore District Construction of 30000 Litres Capacity OHT Tank (12.00m Staging Height) at Karungali in Karungali Panchayat at Anaicut Block 15th CFC (DP) JJM 2025-26 Package No 01
2026_RDTN_645927_1
A2/2500/2024 ACT JAN 07-26
Open Tender
Civil Works
180 days
THE BLOCK DEVELOPMENT OFFICE, ANAICUT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹39,420
5 May 2026
22 Jan 2026
12 Feb 2026
22 Jan 2026
12 Feb 2026
22 Jan 2026
Vellore District Construction of 30000 Litres Capacity OHT Tank (12.00m Staging Height) at Karungali in Karungali Panchayat at Anaicut Block 15th CFC (DP) JJM 2025-26 Package No 01
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Items 1.50 m to 4.50m below GL
Items 0 m to 1.50m below GL
Items 0.0 to 4.50m Above GL
Items Above 4.51m to 7.32 m
Items Above GL 7.33m to 10.98m
Items 10.98 m to 14.64 m above GL
14.64 m 18.30m above GL
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
For Plan surface Below GL
From 0.00 -3.30m
From 5.30m to 6.30 m
From 8.30m to 9.30m above G.L
From 11.30 m to 12.30m
Curved Surface -Upto 0-3.30m height
From 5.31-6.30m Height
Square column -Below GL
8.31 to 9.30m ht
10.31 to 11.30m ht
Painting two coats over new plastered using approved cement paint including cost and conveyance of all materials to site and all labour charges etc comoplete
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Supplying , Fabricating,Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc. , Complete complying with stanard specification.
Supplying and Fixing of RCC inner access Ladder in RCC 1:11/2:3mix etc. , Complete complying with stanard specification.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by Departmental Officers
Providing Cut stone slab in CM 1:3 mix and as directed by Departmental Officers
Providing Manhole cover of size 0.60x0.60 m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm Ms angle fixed along edges and as directed by Departmental Officers
65m dia GI Pipe for inlet connection& outlet
65mm dia GI Pipe for over flow and rain water harvesting pipes
50mm dia GI Pipe for scour pipes
65mm dia GM Gate valve
50mm dia GM Gate valve
50 mm dia Flange set
Lifting charges for pipe connection
75mm dia pvc thread coupler
65mm dia pvc thread coupler
65mm dia GI Tee
65mm dia GI coupling
65mm dia GI flange set
65mm dia GI Elbow
50 mm dia GI Elbow
65mx 50mm dia GI Reducer
75mm x 63mm PVC Reducer
90mm x 75mm PVC Reducer
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
63mm PVC Pipe 6KSC
90mm PVC Pipe 6KSC
Earth work excavation and deposting on bank with intitial lead and lift in all soil (Lx 0.60 x0.90)
Laying and jointing of PVC pipe into trench
Refilling the Excavated earth in pipe line trench including all labour charges etc complete
Provision for Fencing Arrangement
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supply anf Fixing of RCC Pole
Chain Link - 2” x 2” using 10 Gauge Galvanised Iron Wire (of all sizes)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Steel Gate
Provision for Community soakpit/rainwater arrangements
Name Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_774255.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_774255.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid