Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC 3 147 KPN NAGAR MELTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | ₹3.5 L Quoted ₹3.0 L | 1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical 34 4 CHELLAPPAN STREET KARUMALAIKOODAL METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | K.DHANASEKARAN ENGG. CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Removal of insulation of HP/IP control valve, cleaning and disposal of removed insulation including transportation. | 10 | Nos | 4,830 ₹48,300 |
| 2.00 | Re- insulation of HP/IP control valve, painting, claddings aluminum sheet & cleaning. Including transportation. | 10 | Nos | 4,830 ₹48,300 |
| 3.00 | Plastering the cement on the insulation of HP/IP Control valves and finishing. Transporting the cement from central store to work spot. | 10 | Nos | 1,538 ₹15,380 |
| 4.00 | Removal and Re-insulation of LPT Gland steam pipes:
Removal of LP front & Rear gland steam pipes insulation, re-insulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc. | 4 | Nos | 14,510 ₹58,040 |
| 5.00 | Removal and Re insulation of Ceramic blanket in and around ESV, IV, transfer pipe, spindle leak off lines and flange & stud heating chamber area in main Turbine. | 300 | m2 | 371 ₹1.1 L |
| 6.00 | Cost for Epoxy light grey base with accel
(Insulation paint) | 30 | Ltrs | 400 ₹12,000 |
| 7.00 | Charges for Consumables and T&P’s item for Sl.No:1 to 5 | 1 | LS | 7,040 ₹7,040 |
Tender Value
Refer Docs
EMD Value
₹3,300
Closing Date
20 Mar 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM I Removal and Re insulation of HP IP control valves Gland steam pipes ESVIV and HPTIPT transfer pipe lines during Breakdown Maintenance work of Main Turbine in Unit I to IV for the period of one year during 2025 26 as and when required
2025_EB_530592_1
CE / MTPS-I / SE / M-I / TM /OT. 318 / 2024-25
Open Tender
Power/Energy Projects/Products
365 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,300
Yes
21 May 2026
6 Mar 2025
21 Mar 2025
6 Mar 2025
20 Mar 2025
6 Mar 2025
Amount
Removal of insulation of HP/IP control valve, cleaning and disposal of removed insulation including transportation.
Re- insulation of HP/IP control valve, painting, claddings aluminum sheet & cleaning. Including transportation.
Plastering the cement on the insulation of HP/IP Control valves and finishing. Transporting the cement from central store to work spot.
Removal and Re-insulation of LPT Gland steam pipes: Removal of LP front & Rear gland steam pipes insulation, re-insulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc.
Removal and Re insulation of Ceramic blanket in and around ESV, IV, transfer pipe, spindle leak off lines and flange & stud heating chamber area in main Turbine.
Cost for Epoxy light grey base with accel (Insulation paint)
Charges for Consumables and T&P’s item for Sl.No:1 to 5
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_631663.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid