Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88,880Accepted-Finance | L1 | Accepted-Finance Lowest bid found in order | |
| 2 | L2₹90,000+₹1,120 (1.26%)Accepted-Finance | L2 | Accepted-Finance Other than Lowest bid | |
| 3 | L3₹1.5 L+₹61,120 (68.8%)Accepted-Finance | L3 | Accepted-Finance Other than Lowest bid |
Tender Value
Refer Docs
Closing Date
16 Feb 2024, 12:00 pmClosed
GAURAV PANT
GE 874 EWS C/O 56 APO
SOIL INVESTIGATION AND SOIL DATA COLLECTION FOR PROVN OF 01 WP SHED 50 MT INCLUDING WATER STORAGE TANK 2.25 KL AND ALLIED INFRASTRUCTURE AT 28 AMN COY CHAKKIGAM
2024_MES_640120_1
3009/A/17/E3
Open Tender
Miscellaneous Works
Works
60 days
KUPWARA
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
Exempted
19 Feb 2024
1 Feb 2024
17 Feb 2024
1 Feb 2024
16 Feb 2024
1 Feb 2024
1. Soil investigation and soil data collection for design for "Provn of 01 x WP Shed (60 MT) incl water storage tank (2.25 KL) and allied infrastructure at 28 Amn Coy (Chakkigam)". Determination of safe bearing capacity of soil by mean of boring 100 to 150mm dia holes upto 15 mtr depth/ Refusal and performing standard penetration test (SPT) at suitable interval or in case, gravelly/ boulder/ rocky strata encountered before 1.5 mtr depth then open pit upto 2 mtr to 5 mtr depth and CDPT as per IS will be concluded upto 15 Mtr or till refusal collection of disturbed/ undisturbed soil samples at various depth or bore holes for laboratory testing i.e grain size analysis attenberg limits, natural density, water contents specific gravity, triaxial shear, free sweel index cohension and angle of friction, determination of harmful chemical etc, evaluation of safe bearing capacity and strength as per IS 2131-1981. QTY 02 Nos BORE HOLES. (a) Transportation charges for equipment and machinery (lumpsum). (b) Submission of 03 copies of report of soil investigation and other details including marking of bore hole location on site plan in triplicate- 01 Nos. (c) The report should be give the proposed type of foundation like isolated footing, Raft footing, combined footing or Mat footing if shallow foundation is proposed. Depth of rectangular or square footing may be brought out in the report. (d) Report should exclusively bring out the depth of water table as per the groung data and liquefaction potential for the strata. (e) In case deep foundation is proposed type of pile fdn end/friction may be brought out with proposed depth for each type. *Following aspects/points may pl be included in test report of bore holes (i) In soil test report recommendation of SBC should be given for all the bore holes for min three depth i.e 1.5m, 2.0m & 2.5m. (ii) Recommendation for footing type & SBC shall be worked out for minimum foundation as under 1.5x1.5m, 1.5x2.5m, 2.0x2.5m, 2.0 x 3.0m. (iii) All testing shall be carried out as per relevant and latest IS code provisions. (iv) Photographic record of geo-exploration and testing shall also be part of record. (v) Depth of ground water table in peak monsoon & peek summer i.e (highest & lowest) and seasonal variation of water table should be mentioned in report. (vi) Recommendation of filling under flooring. (vii) Recommendation with respect to liquefaction potential of soil in case of saturated or partially satured loose/uncompact sandy soil. (viii) Swelling index & swelling pressure in respect of BC soil & its depth/layer.
Research and Engineer Enterprises
RASHID CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_716568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .