Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | L1 | Accepted-AOC due to L1 | |
| 2 | L2₹5.4 Cr+₹27 L (5.24%)Rejected-AOC 1256 URBAN ESTATE 126102 | JIND | HARYANA | 126102 | L2 | Rejected-AOC due to L2 | |
| 3 | L3₹5.6 Cr+₹43 L (8.35%)Rejected-AOC 108A FRIENDS COLONY NEAR M M PUBLIC SCHOOL RAJEEV NAGAR MANDI DABWALI DISTT SIRSA 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | L3 | Rejected-AOC due to L3 |
Tender Value
₹5.2 Cr
EMD Value
₹10.4 L
Closing Date
2 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PRADEEP KUMAR KUMAR
EE PHE Division No. 1 Nuh (P)
Upgradation of existing 3.60 MLD STP based on MBBR Technology with Anoxic tank Activated sludge tank i.e completion of Tertiary Treatment Plant.
2023_HRY_270399_1
2023E6900FB1 BBDD 4E42 967F F5146C8FCE15560PUH
Open Tender
Civil Works
Works
365 days
Nuh
1)Agency must be enlisted with PHED Haryana2) Agency must have experience for execution of work for similar nature with a certified copy from concerned officer not below the rank of Executive Engineer or equivalent
8 documents required · 8 mandatory
₹20,000
₹10.4 L
Yes
8 Sept 2023
1 Apr 2023
2 May 2023
1 Apr 2023
2 May 2023
1 Apr 2023
Amount
Sewage Treatment plant
Up gradation and commissioning after conversion of existing 3.60 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set and transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Jobgipur Road Nuh town Distt. Nuh. (a) Entire Civil works as per DNIT (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
Up gradation and commissioning after conversion of existing 3.60 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set and transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Jobgipur Road Nuh town Distt. Nuh. (b) Entire mechanical, electric and instrumentation works as per DNIT – Existing mechanical equipment, Electric and instrumentation equipment any other works contingent thereto (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
(c) Repair of existing structures (As per Annexure – I) (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
RAJEEV KUMAR GOEL CONTRACTORS
M/s Sourabh Construction Pvt. Ltd.
stage.html
html • 0.05 MB
technical_343677.pdf
PDF • 0.69 MB
techsummary_343677.pdf
PDF • 0.69 MB
finance_343677.pdf
PDF • 0.69 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_343677.pdf
PDF • 0.69 MB
270399.pdf
PDF • 2.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .