Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -4.98% | ₹10.3 L | L1 | Admitted-Finance |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
4 Feb 2026, 6:00 pmClosed
The Executive Engineer PWD Dn. Sheo
The Executive Engineer PWD Dn. Sheo
Construction of Saray (Pandal) at Grib Nath ji Temple Gram Panchayat Sheo(Barmer)
2026_CEPWD_534243_1
EE PWD SHEO NIT 07/2025-26
Open Tender
Civil Works
90 days
BARMER
Please refer tender Documents
5 documents required · 5 mandatory
₹500
The Executive Engineer PWD Dn. Sheo
₹22,000
Yes
6 Feb 2026
2 Feb 2026
5 Feb 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:3 ( 1-Cement : 3-Sand).
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :Cement Mortar 1:3 ( 1-Cement : 3-Sand).
Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing First sort.
Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand.
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc.
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for Columns, pillars, posts and struts etc.
Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix
Add extra for Providing M-40 grade concrete Interlocking Blocks in place of M-30 grade.
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. M20 grade Nominal Mix / Design Mix
Add extra for providing richer mixes respectively at all floor levels Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix.
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Providing and fixing Marble stone flooring table rubbed, 15-18 mm thick over 20mm (Av.) thick base of CM 1:4 (1 cement : 4 coarse sand) jointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete.Makrana 'Adanga'.Upto to 1500 Cm2 Tiles
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.89 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 1.71 MB
Tendernotice_4.pdf
PDF • 6.64 MB
BOQ_952027.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid