Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.1 LAdmitted-Finance NAGAR PANCHAYAT KHERAGARH DISTRICT AGRA U P | AGRA | UTTAR PRADESH | 282001 | -39.99% | ₹37.1 L | L1 | Admitted-Finance |
| 2 | L2₹39.5 L+₹2.4 L (6.43%)Admitted-Finance | -36.13% | ₹39.5 L+₹2.4 L (6.43%) | L2 | Admitted-Finance |
| 3 | L3₹41.2 L+₹4.1 L (11.0%)Admitted-Finance | -33.40% | ₹41.2 L+₹4.1 L (11.0%) | L3 | Admitted-Finance |
| 4 | L4₹41.3 L+₹4.2 L (11.3%)Admitted-Finance | -33.21% | ₹41.3 L+₹4.2 L (11.3%) | L4 | Admitted-Finance |
| 5 | L5₹41.5 L+₹4.4 L (11.8%)Admitted-Finance 6 1 SHREE RAM HOUSE CHURCH ROAD CIVIL LINES AGRA | AGRA | AGRA | UTTAR PRADESH | -32.88% | ₹41.5 L+₹4.4 L (11.8%) | L5 | Admitted-Finance |
Tender Value
₹61.8 L
EMD Value
₹5.1 L
Closing Date
29 Apr 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Hariparvat Zone, Room No. 88 Road construction work from Kasturi Devi residence to Bhagat Singh residence in Vinayak Nagar. CMNSY
2026_DOLBU_1133189_1
30-03-2026/NAGAR NIGAM AGRA/29-04-2026/07
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam
₹5.1 L
7 Aug 2026
4 Apr 2026
29 Apr 2026
4 Apr 2026
29 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W cutting in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. | - | cum | - | - |
| 2 | Cartage of Earth and Malva up to 8km Distance including loading & unloading etc. all complete. | - | cum | - | - |
| 3 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. | - | cum | - | - |
| 4 | Supply and laying polythene over GSB etc. all complete. | - | sqm | - | - |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering, finishing and but excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retarder for setting of concrete/improve workability without impairing strength and durability as per direction of engineer-in-charge. Note- cement concrete considered in this item is @ 330kg/cum. Excess or less cement used as per design mix is payable or recoverable separately up to plinth level. | - | cum | - | - |
| 6 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | - | qtl | - | - |
| 7 | Supply and mixing 3.5 kg and or as specified by the manufacturer hardener in tremix concrete per sqm. | - | sqm | - | - |
| 8 | Supply and fixing of black granite stone board and approved standard matter with brick work, plaster & paint etc. all complete. | - | Job | - | - |
| 9 | Sub Total (A) | - | Rs | - | - |
| 10 | Add / Deduction For Estimate Figure Amount Match | - | Rs | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_2115515.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .