| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC 94 26 IIND FLOOR KALPATARU 94 26 VIJAY PATH 94140 JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | ₹5.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹11.9 L+₹6.2 L (108.6%)Rejected-Finance | ₹11.9 L+₹6.2 L (108.6%) | L2 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | QMS INDIA LIMITED L1 | SHRI SAINATH ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | M&L to carryout enegy audit of entire stn electricity supply system comprising of sub station, water supply installation, DG Set, AC plant etc as given below including all mechanical sy stem by a certified energy auditor approved by BEE. Each E/M equipment such as Transformer, AC Plant, Voltage Stablizer, DG Set, Pump set should be monitesed with power analizer conditon as for 24 hours in one go for working day & holiday both including complete all as specified & ndirected by Engr-in-Charge.
(a) Transformer - 72 Nos
(b) DG set- 42 Nos
(c) Voltage stabilizer- 39 Nos
(d) AC plant- 5 Nos
(e) Pump and motor- 16 Nos
(f) Water supply installation- 04 Nos
Notes : Contractor is advised to visit the Stn before Quating the tender to get a proper idea about the prevailing site Condition and To get a proper idea of Scope of Work. It is requested to go through the PS clause at page No. 79 to 86. | 1 | Each Job | 5,70,000 ₹5,70,000 Lowest | 11,89,252 ₹11,89,252 |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
26 Feb 2026, 6:00 pmClosed
GE (AF) Utarlai
GE (AF) Utarlai PB No. 11 Barmer 344001
PROVN OF ENERGY AUDIT AT AIR FORCE STATION UTARLAI
2026_MES_748095_2
8676/E8
Open Tender
Civil Works
Item Rate
270 days
Utarlai
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Utarlai
₹12,000
Yes
29 Apr 2026
12 Feb 2026
27 Feb 2026
12 Feb 2026
26 Feb 2026
19 Feb 2026
M&L to carryout enegy audit of entire stn electricity supply system comprising of sub station, water supply installation, DG Set, AC plant etc as given below including all mechanical sy stem by a certified energy auditor approved by BEE. Each E/M equipment such as Transformer, AC Plant, Voltage Stablizer, DG Set, Pump set should be monitesed with power analizer conditon as for 24 hours in one go for working day & holiday both including complete all as specified & ndirected by Engr-in-Charge. (a) Transformer - 72 Nos (b) DG set- 42 Nos (c) Voltage stabilizer- 39 Nos (d) AC plant- 5 Nos (e) Pump and motor- 16 Nos (f) Water supply installation- 04 Nos Notes : Contractor is advised to visit the Stn before Quating the tender to get a proper idea about the prevailing site Condition and To get a proper idea of Scope of Work. It is requested to go through the PS clause at page No. 79 to 86.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TENDERDOCUMENTS.pdf
Tender Documents • 0.62 MB
BOQ_842693.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .