| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAdmitted-Finance | ₹20.9 L | L1 | Admitted-Finance |
| 2 | L2₹26.9 L+₹6.1 L (29.0%)Admitted-Finance | ₹26.9 L+₹6.1 L (29.0%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| Sl No | Description | Qty | Unit | CHANDERA BUILDERS L1 | M/S CHAITANYA CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|
| 1.00 | Part A for 25 HP Sewage TrolleyHiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | shifts | 5,02,200 ₹5,92,596 Lowest | 6,21,000 ₹7,32,780 |
| 2.00 | Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | shifts | 3,32,100 ₹3,91,878 Lowest | 4,18,500 ₹4,93,830 |
| 3.00 | Part B for 50 HP Sewage TrolleyHiring & Running of 50 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | shifts | 5,02,200 ₹5,92,596 Lowest | 6,48,000 ₹7,64,640 |
| 4.00 | Hiring of 125 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | shifts | 4,32,000 ₹5,09,760 Lowest | 5,94,000 ₹7,00,920 |
Tender Value
₹13.2 L
EMD Value
₹26,500
Closing Date
31 Aug 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Installation of different ratings Sewage Pumping Set/Trolley with all allied accessories on hiring basis at any location under Uttam Nagar Constituency, AC-32.
2026_DJB_297506_1
NIT No. 1 (2026-27)EE(EnM)M-15
Open Tender
Civil Works
Works
90 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
DJB Account No. 50448339804
₹26,500
19 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Part A for 25 HP Sewage TrolleyHiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | shifts | 80 | ₹21,600 | 18% |
| 2 | Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | shifts | 80 | ₹21,600 | 18% |
| 3 | Part B for 50 HP Sewage TrolleyHiring & Running of 50 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | shifts | 80 | ₹21,600 | 18% |
| 4 | Hiring of 125 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | shifts | 80 | ₹21,600 | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_396328.xls
BOQ • 0.24 MB
corrr.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .