Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.1 L+₹73,517 (2.89%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹27.1 L+₹1.7 L (6.68%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
31 Oct 2022, 4:00 pmClosed
SE OMC I BTPS ANPARA
SE OMC I BTPS ANPARA
Preventive Routine and Overhauling Breakdown Maintenance and General Upkeep of CW Pumps System of 2x500 MW BTPS Anpara
2022_RVUNL_728328_1
05/CAD/BTPS/2022-2023
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
ANPARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
DY CAO CFA AND BO BTPS ANPARA
₹49,000
13 Dec 2022
15 Sept 2022
2 Nov 2022
15 Sept 2022
31 Oct 2022
15 Sept 2022
15 Sept 2022 - 31 Oct 2022
Amount
Part-(A)
Preventive Routine Maintenance and general upkeep of C.W. Pumps, Lub. Water Pump, piping, Valves, NRVs, Tanks, etc. of unit 4 & 5.
Operation up-keeping routine maintenance of of EOT Crane of C.W. Pump House in general shift. From (8.30 hrs. to 17.30 hrs) including one hour lunch time.
Operation of EOT cranes besides above hrs. in emergency, during holiday and Sunday on overtime basis as per site requirement.
Part-(B)
Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) without repair/replacement of Retaining Ring as per scope of work.
Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) with repair/replacement of Retaining Ring as per scope of work.
Decoupling, Alignment, Coupling of Pump with its motor in addition to O/H of pump as and when required (On request of Electrical Maintenance Division)
Servicing of Gearbox of Butterfly valves of C.W. Pumps.
Part-(C)
Complete overhauling/ Breakdown maintenance (in case of failure of pump due to any reason) of C. W. Pumps by carrying out the following work as detailed in scope of work. Including following works. (a)Decoupling of motor, dismantling of coupling of the pump. (b) Dismantling of Thrust bearing and pump, after dismantling of cooling pipes. (c) Cleaning, checking & revisioning /changing of worn out parts/components. (d) Assembling of the pump. (e) Alignment of the pump with motor after clearance from motor side.(f) Coupling of motor after proper alignment. (g) Commissioning of pump set
Epoxy painting on inside/outside surface of C.W. Pumps elements with all associated pipe line/valve etc. including supply of epoxy paint as per technical specification details.
Replacement of Spherical Roller Bearing/ Maintenance work of NRR/ any type of breakdown maintenance work in which dismantling of CW Pump up to discharge elbow is required.
Replacement of expansion bellow/Butterfly valves (Ist & IInd Isolation valve) of CW Pump discharge line as per scope of work.
TECHCON ENGINEERS
M/S SCINTECS PROCESS CONTROL
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .