CWE Bathinda
HQ CWE Bathinda, Bathinda Military Station
PREVENTIVE COMPRESSIVE MAINT OF CENTRAL AC PLANT AND PACKAGE AC PLANTS AT VARIOUS LOCATION UNDER GE (U) BATHINDA AT BATHINDA MIL STN
2021_MES_460093_1
CWE BTD 8215/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Bathinda
AS PER NIT
7 documents required · 7 mandatory
₹1,000
GE (Utility) Bathinda
₹1.1 L
Yes
21 Sept 2021
15 Jul 2021
20 Sept 2021
15 Jul 2021
18 Sept 2021
6 Sept 2021
16 Jul 2021 - 24 Jul 2021
Amount
M&L for Annual comprehensive maint, Preventive and routine maint of following chilling machines (a) FAD Missile Shed No 04 - 04 Nos Chilling Units (b) FAD Missile Shed No 05 - 04 Nos Chilling Units (c) FAD Missile Shed No 06 - 04 Nos Chilling Units (d) FAD Missile Shed No 07 - 04 Nos Chilling Units (e) FAD Missile Shed No 08 - 04 Nos Chilling Units (f) FAD Missile Shed No 09 - 04 Nos Chilling Units (g) FAD Missile Shed No 10 - 04 Nos Chilling Units (h) EME Wksp No 01 (138 Fd Wksp) - 02 Nos Chilling Units (j) EME Wksp No 02 (190 Fd Wksp) - 02 Nos Chilling Units (k) EME Wksp No 03 (280 Fd Wksp) - 03 Nos Chilling Units Total - 35 Nos of Chilling Units Make : M/s Blue Star of screw type compressor, 11/12.5 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for Annual comprehensive maint, Preventive and routine maint of 03 Nos chilling machines Make : M/s Blue Star of screw type compressor, 3x100 TR each at 174 MH Area, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for Annual comprehensive maint, Preventive and routine maint of Package type AC Plant unit (DX type) of capacity 3x13.7 TR at UAV 'I' Level, including outdoor unit Hermetically sealed compressor, safety devices, cooling thermostat, humidity stat kit Make : M/s Blue Star incl control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for Annual comprehensive maint, Preventive and routine maint of Ductable Package type AC Plant factory assembled of capacity 3x5.5 TR at UAV Hanger air cooled type with all accessories and controls each compressor Make : M/s Blue Star incl control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for Annual comprehensive maint, Preventive and routine maint of Cold Storage Plant factory assembled of capacity 4x4 TR at 174 MH air cooled type with all accessories and controls each compressor Make : M/s Blue Star incl control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room following location, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments -
(a) FAD Missile Shed No 04
(b) FAD Missile Shed No 05
(c) FAD Missile Shed No 06
(d) FAD Missile Shed No 07
(e) FAD Missile Shed No 08
(f) FAD Missile Shed No 09
(g) FAD Missile Shed No 10
(h) EME Wksp No 01 (138 Fd Wksp)
(j) EME Wksp No 02 (190 Fd Wksp)
(k) EME Wksp No 03 (280 Fd Wksp)
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room at 174 MH of capacity 3x100 TR, as per manufacturer's instruction, complete all as directed.
M&L for Annual comprehensive maint, Preventive and routine maint of 03 Nos chilling machines Make : M/s Voltas of reciprocating compressor, 3x40 TR each at 61 WEU, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for Annual comprehensive maint, Preventive and routine maint of following chilling machines 3 Nos Chilling Machines Make : M/s Voltas of screw type compressor, 3x25 TR each at 17 SIU, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel, complete all as directed to entire satisfaction of Engineer-in-charge.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at 40 Ton Central AC Plant Room at 61 WEU, as per manufacturer's instruction, complete all as directed.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room at 17 SIU of capacity 3x25 TR, as per manufacturer's instruction, complete all as directed.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Package AC Plant at 10 Corps Signal Unit of capacity 3x18 TR, as per manufacturer's instruction, complete all as directed.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant at 10 TAC of capacity 3x5.5 TR, as per manufacturer's instruction, complete all as directed.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Package AC Plant at 10 Corps IIT of capacity 3x7.5 TR, as per manufacturer's instruction, complete all as directed.
Material and labour for de-scaling 2x100 TR Central AC Plant DX type (Sagat Singh Auditorium) and cleaning of chocked pipe water circulating lines including service valves,condenser (Heat Exchanger) to cooling tower ,circulating concentrated de-scaling solution (Concentrated hydrochloric acid) mixed with water in suitable proportion till the complite deposites/scale is removed or 24 hours whichever is later & as ordered, Circulating through pump,servicing of valves,cooling tower,water spray assemble ,cleaning with suitable size of drill rod ,wire brush including dismantling and connecting all desmantled components in proper position after srevicing/overhauling etc replacement of packing gasket 3mm thick,Nuts,Bolts with washer,testing of water line for leakage,complete all as specified and derected by Engineer-in Charge.
M&L for dismantling of electric driven horizontal induction motor of capacity 2.0 HP of any type and make, by engaging sufficient man power and suitable T&P to ensure safety of pump-motor as well as working persons including disconnecting of electric connections, dismantling of motor, taking out the burnt windings, cleaning and washing of slots and rewinding the same with copper winding wire of existing gauge and quantity (as per original manufacturer design) including replacement of all damaged parts i. e. bearings, bush, thrust plate, thrust bearing, connector plate, insulating materials such as insulating sheets insulating paper (Class "F"), sealing compounds etc and reassembling the motor after varnishing, heating/drying, greasing of moving parts etc and reinstallation of the motor in original location, checking the alignment, making proper electric connection, testing for smooth operation, complete all as directed. Note : (i) The cost of winding wire and all replaced defective parts are deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. (ii) The cost of transportation (to and fro) and other necessary equipment shall be arranged/brought by contractor to complete the job at site or at repair shop and no extra cost shall be paid to the contractor in this effect.
All as per srl item no 26 here-in-above but for 3.0 HP capacity.
All as per srl item no 26 here-in-above but for 5.0 HP capacity.
All as per srl item no 26 here-in-above but for 7.5 HP capacity.
All as per srl item no 26 here-in-above but for 10.0 HP capacity.
All as per srl item no 26 here-in-above but for 15.0 HP capacity.
All as per srl item no 26 here-in-above but for 20.0 HP capacity.
All as per srl item no 26 here-in-above but for 25.0 HP capacity.
M&L for complete overhauling of condenser/chiller centrifugal pumpset of 25.00/20.00/15.00 HP by engaging sufficient man power and suitable T&P to ensure safety of pump-motor as well as working persons including disconnecting suction & discharge water lines and removing of electric connection, dismantling the U/S pumpset from MS foundation, detaching the pump, opening the pump, remelting the shaft and filling of metal at decayed portions including all kind of machine works i.e. welding, turning, polishing etc as required to make the shaft of required shape and size, as original, balancing the shaft and refitting in pump body; complete replacement of impeller set with new; replacement of Cushy foot anti vibration pad with and incl carrying out complete repair / replacement of damaged parts i.e. bearings, bush, gland plate, gland packing, coupling assembly etc and reassembling the pump after greasing of moving parts and reinstallation of the pump with motor in original location using new MS stud, nut, bolt, washer and other packing material etc; checking the alignment; reconnecting the suction and delivery pipes, making proper electric connection, testing and commissioning for smooth operation at optimum efficiency, complete all as directed.
All as per srl item no 34 here-in-above but for 10 / 7.5 HP capacity.
All as per srl item no 34 here-in-above but for 5/02 HP capacity.
Repair & maintenance of oil pump of 18 Ton compressor SMC-6-65 Model Accel make by opening and dismantling all parts of oil pump for overhauling, cleaning and washing all parts in petrol to the entire satisfaction of Engineer-in-Charge and reassembling including replacement of 2 nos bearing bushing one split pin and all gear wheel set complete all as specified and directed as per manufactures instructions.
Disconnecting and dismantling of open type compressor of central air conditioning plant and reinstalled in its position with correct alignment after necessary overhauling, cleaning, repair, servicing, testing and commissioning of reciprocating open type compressor of capacity 18 Ton (Make: Accel model No SMC- 6-65), replacement of unserviceable parts (as ordered) and charging of compressor oil and refrigerant (Freon-22) complete to the entire satisfaction of Engineer-in-Charge. NOTE : (i) The spare parts required for replacement shall be measured and paid separately as supply only under srl item no. 39 to 65. (ii) All spare parts shall be of make ACCEL. (iii) Compressor oil and refrigerant will be issue by departmant. for SMC-6-65 model compressor.
Supply only the following items :- Note :- The items as mentioned below is for 65 mm dia bore compressor Model No SMC-6-65.
Dowty ring
Head/Side Cover Gasket with discharge flange gasket
Oil Level Gasket with gasket for glass and circular Nut
Main Bearing without collar 0.75 mm
Shaft Seal cover with gasket
Shaft Seal Assembly complete
Spring Retainer with soring for shaft seal, thrust collar,'O' ring for seal, slide ring and carbin ring
Oil Pump Assembly complete with bushing for oil pump, gear wheel set, 'O' ring for oil pump, Coupling and Pin for coupling
Bracket with pin for bracket and spacing washer
Lock Nut for crank shaft incl washer and key
Connecting Rod complete incl bearing of size 0.75 mm, bushing, connecting rod bolt and castel nut
Piston Assembly complete with Piston Pin, Piston Ring Set
Cylinder Liner Assembly (Freon) with suction valve ring plate (0.8 mm), buffer ring spring, suction valve ring retaining plate, guide for ring liner, liner gasket
Discharge Valve Assembly (Freon)
Oil Pressure Regulating Valve Aseembly
Oil Charging Valve Assembly
Safety Valve Assembly with spring
Service Valve Assembly
Spindle for Service Valve with Lock Washer
Manual Capacity Valve Assembly with Nipple
Oil Strainer Assembly
Gasket Set Complete (6 Cylinder)
Solonoid Valve Assembly (Make : Rotex)
Coil for Solonoid Valve (Make : Rotex)
Crank case Heater Element
Crank Case Heater Assembly
M&L in replacement, for PVC fins Box suitable for cooling tower of 200 TR capacity, FRP induced draft type (Model : CM-12), complete all as directed. Make : Mihir/Paharpur
M&L for complete cleaning of cooling tower incl taking out the cooling fan motor with blade cleaning the blade woth caustic soda, removing the top cover, taking out sprinkler set cleaning the holes of sprinkler, removing the fills, replacing the broken/damaged fills, cleaning the fills, cleaning the pipeline and strainers, with pressure motor and reassembling all the parts and make the cooling tower fully functional. Note : (a) The stores required for making the cooling tower will be measured and paid separately. (b) The quoted rate includes the labour cost of replacement of the stores
Supply only the following
(a) Sprinkler Set
(b) GI Clamps
(c) Turn Buckles
(d) Tintion rod
(e) Sprinkler Head
(f) Branch Pipe
M/s Kataria Construction Company
Aman Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .