Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC | L1 | Accepted-AOC Lowest Value |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
14 Feb 2024, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE SEDC Salem
SE SEDC Salem
Works Contract in respect of East Division Except Yercaud Section
2024_EB_418113_1
SE/SEDC/WC.NO.046/2023-24 dt.30.01.2024
Open Tender
Electrical and Maintenance Works
Works
365 days
Yercaud
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
19 Jun 2024
3 Feb 2024
15 Feb 2024
3 Feb 2024
14 Feb 2024
4 Feb 2024
Amount
Excavation of pole pit up to 27”(8.0m) pole.
Stay pit 4.5” to 5” depth.
Excavation of pole pit up to 9.14 Mtr pole.
Hard rock without Blasting.
RCC poles/Metal pole up to 8.00m (27’).
RCC poles/Metal pole up to 9.14.m(30’).
Erection of stay set complete.
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2.
LT 3 Phase cross arm.
LT single Phase cross arm.
HT /LT TI Fitting.
Fixing of HT Pin Insulators (11/22/33KV).
Fixing of HT 11KV stain disc.
Fixing of HT 22KV stain disc.
Fixing of LT Pin Insulators.
Fixing of LT Shackle.
Fixing of knob.
Earthing of Pole with pit including burying looping and binding.
Paving of conductor ,Stringing, binding, Jumpering etc., 7/4.09 mm ACSR (per Km).
7/3.35mm ACSR 7/3.15mmAAAC (per Km).
7/2.59mm ACSR & 7/2.50mm AAAC (per Km).
Erection of Transformer structure complete in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel,belting angle Including Concreting ( Except erection of transformer).
Erection of Single Pole Structure.
Transporting Below 8 Kms.
Transporting above 8 Kms. For additional Km (Irrespective of weight in tonnage).
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m.
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m.
Loading of poles upto 27".
Loading of poles upto 30".
Loading of metal poles (All sizes).
Un Loading of poles upto 27".
Un Loading of poles upto 30".
Unloading of metal poles (All sizes).
Unloading of materials.
Leading and Stacking of materials.
Flat Guarding including fixing of 2 Nos. Cross arms.
HT Guarding.
Releasing of Single Phase service wire and refixing.
Releasing of Three Phase service wire and refixing.
Erection of street light including Fixure fitting.
Mass concreting including materials (Cement+River sand / M. sand and blue metals and Watering).
Sleeve concreting including materials (Cement+River sand / M. sand and blue metals and Watering).
Dismantling of Transformer structure complete.
Dismantling of pole (9.0m and above).
Dismantling of pole (7.5mtr & 8mtr).
Dismantling of pole from pole pit (9.0m and above).
Dismantling of pole from pole pit (7.5mtr & 8mtr).
Dismantling of HT Pin Insulator.
Dismantling of HT TI Fitting.
Dismantling of11 KV disc.
Dismantling of 3 PH X arm.
Dismantling of Tapping X arm, V X arm & Guarding X arm.
Dismantling of 1 PH X arm.
Dismantling of Alu Knob.
Dismantling of LT pin Insulator.
Dismantling of LT Shackle Insulator.
Stay set complete Dismantling.
Dismantling of 7/4.09 mm ACSR conductor (km).
Dismantling of 7/3.35 mm ACSR conductor (Km).
Dismantling of 7/2.59 & 7/2.11 mmACSR conductor (Km).
Dismantling of street light.
Loading and unloading of Transformer upto 100 KVA.
Loading and unloading of Transformer above 100 KVA upto 200 KVA.
Loading and Unloading of HT Metering set.
Erection of New Transformer all Capacities (with Jumpering).
Erection of HT Metering set.
Replacement of failed Transformers all capacities.
Fencing of Distribution Transformer structure at road side fabrication and Erection.
Erection of New earth pipe by replacing the corroded earth pipe.
Releasing of grill from poles.
Re-stringing of HT/LT line ACSR 7/4.09 sqmm(for all sizes of conductors in Km).
Re-stringing of HT/LT line ACSR 7/3.35 sqmm & AAAC 7/3.15 sqmm (for all sizes of conductors in Km).
Re-stringing of HT/LT line ACSR 7/2.59 sqmm & AAAC 7/2.50 sqmm (for all sizes of conductors in Km).
Engaging of JCB / Crane For first 2 Hrs.
Engaging of JCB / Crane For every addition Hrs. `
Cutting of Coconut leaves (per tree).
Clearing of branches of trees.
Drilling of hole in channel only 3/4'' & 1''.
Cutting of Channel.
T.I Fitting welding with Clamps.
Labour charges for alteration of Back Clamps/Stay Clamps to suit for the works.
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .