| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 CrAccepted-AOC | ₹26.2 Cr | L1 | Accepted-AOC Awarded being the L1 bidder. |
| 2 | L2₹28.7 CrRejected-Finance NEAR RAILWAY STATION WARD NO 4 PO BELPAHAR DIST JHARSUGUDA STATE ODISHA PIN 768217 | BELPAHAR | JHARSUGUDA | ODISHA | 768217 | ₹28.7 Cr | L2 | Rejected-Finance Rejected not being the L1 bidder. |
| 3 | L3₹32.0 CrRejected-Finance | ₹32.0 Cr | L3 | Rejected-Finance Rejected not being the L1 bidder. |
| 4 | L4₹32.7 CrRejected-Finance AT P O P S BELPAHAR DIST JHARSUGUDA | BELPAHAR | JHARSUGUDA | ODISHA | ₹32.7 Cr | L4 | Rejected-Finance Rejected not being the L1 bidder. |
| 5 | L5₹33.1 CrRejected-Finance | ₹33.1 Cr | L5 | Rejected-Finance Rejected not being the L1 bidder. |
Tender Value
₹41.1 Cr
EMD Value
₹50 L
Closing Date
8 Aug 2022, 5:00 pmClosed
Sri Sambit Pattnaik
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438494886.9437485368. 0663-2542779.
Construction of concrete pavement from Brajrangbali Chowk to new Y-curve Siding under Lakhanpur OCP of Lakhanpur Area.
2022_MCL_250887_1
MCL/Samb/Civil-TC/e-Tender /22-23/09 dt.21.07.22
Open Tender
Civil Works - Roads
2035 days
Lakhanpur OCP of Lakhanpur Area MCL
Please refer Tender documents.
5 documents required · 5 mandatory
₹50 L
13 Oct 2022
22 Jul 2022
10 Aug 2022
22 Jul 2022
8 Aug 2022
23 Jul 2022
22 Jul 2022 - 1 Aug 2022
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
Cement Concrete Pavement - Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work, 80 mm dia nominal bore.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost ofcentering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Excavation for Structures - Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 : Ordinary soil. Manual Means : upto 3 m depth.
Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 : PCC Grade M15.
Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 : RCC Grade M25. With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications: RCC Grade M25 : Height upto 5m, With Batching Plant, Transit Mixer and Concrete Pump
Furnishing and Placing Reinforced/Pre-stressed cement concrete in super-structure as per drawing and Technical Specification and as per relevant clauses of sections 1500, 1700 & 2300 in RCC Grade M 30. Using Batching Plant, Transit Mixer and Concrete Pump. For solid slab super-structure, 20-30% of (a+b+c) : Height upto 5m.
Reinforced Cement Concrete Crash Barrier - Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design and dimensions in the approved drawing and at locations directed by the Engineer, all as specified. M 20 grade concrete.
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification and as per relevant clauses of section 1700.
Reinforced cement concrete approach slab (Grade of concrete M-30) including reinforcement and formwork complete as per drawing and Technical specification and as per relevant clauses 1500, 1700 and clause 2704 of specifications.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as per relevant clauses 305 of specifications and as per appendix 6 of IRC-78. Granular material.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications.
Drainage Spouts complete as per drawing and Technical specification and as per clause 2705 of specifications.
Filler joint: Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.
Filler joint: Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder.
Total impact of GST for the purpose of CTC
ASHOK BRICKS INDUSTRIES PVT LTD
M/s N. C. Nahar
Shree Balaji Engicons Limited
BBV-AKM JV
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid