Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | ₹2.3 Cr | L1 | Accepted-Finance Amongst the bidder M/s L R Enterprises Quoted amount is found to be lowest. hence, considered has L1 |
| 2 | L2₹2.4 Cr+₹6.1 L (2.61%)Accepted-Finance | ₹2.4 Cr+₹6.1 L (2.61%) | L2 | Accepted-Finance Amongst the bidder M/s BSL Enterprises Quoted amount is found to be Second lowest. hence, considered has L2 |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
7 Mar 2024, 3:30 pmClosed
Executive Engineer, Bomdila Division PWD, A.P
office of The Executive engineer, Bomdila Division , PWD,A.P, PO- Bomdila, District West Kameng.
C/o Road from RR Hill to BRTF Road ahead of Bomdila Bye Pass, West kameng District.
2024_PWDAP_1764_1
BDL/TandA-40/2023-24/201,dtd 01/03/2024
Open Tender
Civil Works – Roads
Item Rate
730 days
Bomdila
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
EE PWD BOMDILA
₹2.5 L
05/03/2024
11 Mar 2024
2 Mar 2024
8 Mar 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
5 Mar 2024
Amount
SH:- JUNGLE CUTTING
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.(i) By Manual Means (B)In area of thorny jungle
SH:- FORMATION CUTTING
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
Haulage of materials by tipper exluding the cost of loading and unloading on hill roads[ lead = 7.50 Km]
M/s B.S.L Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1908.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .