Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
16 May 2023, 3:00 pmClosed
Addl. Collector (Dev.) / Project Director DRDA
DRDA Krishnagiri
Krishnagiri DT Mathur Block Under MGSMT 2022-2023 strengthening of the 3 Roads Package No TN 04 KRI 13
2023_RDTN_300899_1
RocNo_1433_2023_R3_06_04_23
Open Tender
Civil Works - Roads
Item Rate
180 days
Mathur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.0 L
DRDA Krishnagiri
3 Jul 2023
11 Apr 2023
16 May 2023
11 Apr 2023
16 May 2023
11 Apr 2023
10 May 2023
Amount
1.Strengthening of the Road from Reddipatty-Korappanaickampatty Road KM 0/0-0/6 H/o.Vanipatti (R-230) (Using Plastic Waste) Rs. 19.78 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking Existing BT Surface Including All Labour Charges and Materials Etc., Complete
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for H.M Stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 Nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre at approved locations to control speed, marked with white strips of road marking point
Providing for chevron signs 960cm Octogin (Curves)
Provison for Name Board Cum Citizen Information Board and Maintanance Board
Provision for Sign Board
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
02.Strengthening of the Road from Mathur Byepass Road to Eachampallam Road Km 0/0-1/250 Rs. 39.45 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking Existing BT Surface Including All Labour Charges and Materials Etc., Complete
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/ WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., r it.
Providing And Laying Bituminous Concrete Based on job mix Formula mixed in hot mix plant of drum type in one layer for Overlay as shown in Drawing using paving bitumen 60/70 Penetration grade as per IS 73 and Aggregates ConForming to Grading
Provision for H.M Stone
Provision for K.M Stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 Nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre at approved locations to control speed, marked with white strips of road marking point
Providing for chevron signs 960cm Octogin (Curves)
Provison for Name Board Cum Citizen Information Board and Maintanance Board
Provision for Sign Board
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
3.Strengthening of the Road from Pondy-Krishnagiri Road to Marigoundanoor Road KM 0/0-1/330 H/o Kannandahalli (R 102) Rs. 42.74 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking Existing BT Surface Including All Labour Charges and Materials Etc., Complete
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/ WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., r it.
Providing And Laying Bituminous Concrete Based on job mix Formula mixed in hot mix plant of drum type in one layer for Overlay as shown in Drawing using paving bitumen 60/70 Penetration grade as per IS 73 and Aggregates ConForming to Grading
Provision for H.M Stone
Provision for K.M Stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 Nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre at approved locations to control speed, marked with white strips of road marking point
Providing for chevron signs 960cm Octogin (Curves)
Provison for Name Board Cum Citizen Information Board and Maintanance Board
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Gowri Association
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .